UK Data Centre Planning Database

An ElecTrace-curated record of UK data centre proposals, development and expansion. Explore what is planned, how capacity is reported and what the public evidence supports.

Project records
99
Mapped records
98
Capacity unknown
26
Evidence cutoff
22 September 2026

A planning evidence database. Records describe publicly reported projects; they do not represent commissioned demand, confirmed grid connections or ElecTrace simulation results. Most map points show approximate localities.

Capacity is kept in separate IT, facility, grid, unresolved MW and MVA categories. Campus and phase claims may overlap. No cross-project capacity total is calculated. Read the definitions and scope →

01 / EXPLORE

The UK planning map

Go to the full project list ↓

Explore the retained records

A map of project evidence

Search by name, place or record ID. Select any record for its reported capacity and source detail.

99 records98 located · 1 unlocated
United Kingdom data centre project recordsIncludes Northern Ireland. Equal-sized markers show source records, not capacity. Hollow markers are approximate locality positions. Use arrow keys to pan and plus or minus to zoom. Enter or Space on a marker selects its details. The record selector also includes unlocated and overlapping records.#1 Amazon Didcot North campus · IT load: Unknown; Facility demand / power options: Unknown; Grid connection: Unknown; Unspecified basis: Unknown; Apparent power (MVA): Unknown#2 Amazon Web Services Plot 3 Maylands Avenue · IT load: Unknown; Facility demand / power options: Unknown; Grid connection: Unknown; Unspecified basis: Unknown; Apparent power (MVA): Unknown#3 Ark Hilfield Park / former Mercure Hotel · IT load: Not disclosed; Facility demand / power options: Not disclosed; Grid connection: Not disclosed; Unspecified basis: Not disclosed; Apparent power (MVA): 250 MVA campus; not summed circuit ratings#4 Ark Longcross Park - completed LP1 and planned campus compute · IT load: 55 MW campus compute incl. completed LP1; remainder unknown; Facility demand / power options: Not disclosed; Grid connection: Not disclosed; Unspecified basis: Not disclosed; Apparent power (MVA): Not disclosed#5 Avonmouth Data Centre · IT load: 40 MW; Facility demand / power options: Not disclosed; Grid connection: Not disclosed; Unspecified basis: Not disclosed; Apparent power (MVA): Not disclosed#6 Clearstone Luton data centre campus · IT load: Not disclosed; Facility demand / power options: Not disclosed; Grid connection: 300 MW (connection date unconfirmed); Unspecified basis: Not disclosed; Apparent power (MVA): Not disclosed#7 CloudHQ LHR Didcot campus · IT load: 101 MW catalogue; operating/planned split unresolved; Facility demand / power options: Not disclosed; Grid connection: Not disclosed; Unspecified basis: Not disclosed; Apparent power (MVA): Not disclosed#8 Colt Hayes Digital Park expansion London6/7/8 · IT load: 97 MW expansion; Facility demand / power options: Not disclosed; Grid connection: 250 MW whole-campus connection, reported; Unspecified basis: Not disclosed; Apparent power (MVA): 40 MVA earlier parcel supply; not additive#9 Conesby Data Centre Campus · IT load: Unknown; Facility demand / power options: Unknown; Grid connection: Unknown; Unspecified basis: Unknown; Apparent power (MVA): Unknown#10 Cottam data centre campus · IT load: Not disclosed; Facility demand / power options: up to 1,000 MW conditional DC demand; Grid connection: Not disclosed; Unspecified basis: No selected summary claim; Apparent power (MVA): Not disclosed#11 Culham mission-led AI data centre · IT load: Not disclosed; Facility demand / power options: Not disclosed; Grid connection: 100 MW (available supply); Unspecified basis: Not disclosed; Apparent power (MVA): Not disclosed#12 Deep Green Bradford, Listerhills Road · IT load: Not disclosed; Facility demand / power options: Not disclosed; Grid connection: Not disclosed; Unspecified basis: 5.6 MW (basis unresolved); Apparent power (MVA): Not disclosed#13 Devon Data Campus / Valeon · IT load: up to 1,500 MW compute; Facility demand / power options: 1,800 MW peak, meeting report; Grid connection: Not disclosed; Unspecified basis: No selected summary claim; Apparent power (MVA): Not disclosed#14 Digital Realty Redhill units1-2 redevelopment · IT load: Unknown; Facility demand / power options: Unknown; Grid connection: Unknown; Unspecified basis: Unknown; Apparent power (MVA): Unknown#15 Drax Power Station data centre options · IT load: Not disclosed; Facility demand / power options: ~100 MW grid-fed / ~500 MW behind-meter conditional options (Jul 2026); Grid connection: Not disclosed; Unspecified basis: No selected summary claim; Apparent power (MVA): Not disclosed#16 East Havering Data Centre Campus · IT load: 490 MW maximum; Facility demand / power options: Not disclosed; Grid connection: No selected summary claim; Unspecified basis: Not disclosed; Apparent power (MVA): 600 MVA terminal; includes 160 MVA initial#17 Ebbsfleet AI Data Centre Campus · IT load: Not disclosed; Facility demand / power options: up to 300 MW (design disclosure); Grid connection: Not disclosed; Unspecified basis: No selected summary claim; Apparent power (MVA): Not disclosed#18 Elsham Tech Park · IT load: Not disclosed; Facility demand / power options: 1,000 MW (design disclosure); Grid connection: Not disclosed; Unspecified basis: Not disclosed; Apparent power (MVA): Not disclosed#19 Era4 Erin Landfill modular data centre · IT load: Unknown; Facility demand / power options: Unknown; Grid connection: Unknown; Unspecified basis: Unknown; Apparent power (MVA): Unknown#20 Ferrybridge C Zone A Data Centre · IT load: Unknown; Facility demand / power options: Unknown; Grid connection: Unknown; Unspecified basis: Unknown; Apparent power (MVA): Unknown#21 Former White's Reclamation Site data centre, Eccles · IT load: Unknown; Facility demand / power options: Unknown; Grid connection: Unknown; Unspecified basis: Unknown; Apparent power (MVA): Unknown#22 Global Switch London (campus grouping) · IT load: Not disclosed; Facility demand / power options: Not disclosed; Grid connection: Not disclosed; Unspecified basis: 87 / 18 / 70 MW by London building; mixed stock/expansion; basis unresolved; Apparent power (MVA): Not disclosed#23 Graven Hill D1 data centre · IT load: 290 MW; Facility demand / power options: 435 MW utility design; Grid connection: Not disclosed; Unspecified basis: Not disclosed; Apparent power (MVA): Not disclosed#24 Green Mountain LON-East Romford · IT load: Not disclosed; Facility demand / power options: Not disclosed; Grid connection: Not disclosed; Unspecified basis: 37 MW whole-campus plan incl. delivered phases; Apparent power (MVA): Not disclosed#25 Greystoke Abbots Langley · IT load: Not disclosed; Facility demand / power options: Not disclosed; Grid connection: Not disclosed; Unspecified basis: 96 MW (basis unresolved); Apparent power (MVA): Not disclosed#26 Haslemere Heathrow Estate · IT load: Not disclosed; Facility demand / power options: Not disclosed; Grid connection: Not disclosed; Unspecified basis: Not disclosed; Apparent power (MVA): 80 MVA grid offer#27 Humber Tech Park · IT load: up to 384 MW whole campus (2024 design); Facility demand / power options: Not disclosed; Grid connection: Not disclosed; Unspecified basis: No selected summary claim; Apparent power (MVA): Not disclosed#28 Iron Mountain LON-3 · IT load: 25 MW; target opening 2026, status unverified; Facility demand / power options: Not disclosed; Grid connection: Not disclosed; Unspecified basis: Not disclosed; Apparent power (MVA): Not disclosed#29 Kao Data Harlow Plot F (KLON-07 and KLON-08) · IT load: Unknown; Facility demand / power options: Unknown; Grid connection: Unknown; Unspecified basis: Unknown; Apparent power (MVA): Unknown#30 Kao Data Manchester · IT load: 40 MW historical design (conditional); Facility demand / power options: Not disclosed; Grid connection: Not disclosed; Unspecified basis: 33 MW current catalogue; basis unresolved; not additive; Apparent power (MVA): Not disclosed#31 L51 Bridle Road Data Centre campus · IT load: Not disclosed; Facility demand / power options: Not disclosed; Grid connection: 50 MW (source-claimed contract); Unspecified basis: Not disclosed; Apparent power (MVA): Not disclosed#32 Latos Manchester East Bower Street · IT load: Unknown; Facility demand / power options: Unknown; Grid connection: Unknown; Unspecified basis: Unknown; Apparent power (MVA): Unknown#33 Latos Preston Farm Neural Edge · IT load: up to 9.5 MW; Facility demand / power options: Not disclosed; Grid connection: Not disclosed; Unspecified basis: Not disclosed; Apparent power (MVA): Not disclosed#34 LON6 Iver campus · IT load: 90 MW; Facility demand / power options: Not disclosed; Grid connection: Not disclosed; Unspecified basis: Not disclosed; Apparent power (MVA): Not disclosed#35 Manor Farm and land north of Wraysbury Reservoir · IT load: 72 MW; Facility demand / power options: Not disclosed; Grid connection: 107 MW phase 1 claimed; 147 MW terminal potential; Unspecified basis: Not disclosed; Apparent power (MVA): Not disclosed#36 MedwayOne former Kingsnorth power station · IT load: Not disclosed; Facility demand / power options: Not disclosed; Grid connection: Not disclosed; Unspecified basis: 340 MW (queue field; basis unresolved); Apparent power (MVA): Not disclosed#37 Microsoft Eggborough campus · IT load: Not disclosed; Facility demand / power options: Not disclosed; Grid connection: Not disclosed; Unspecified basis: 300 MW (queue field; basis unresolved); Apparent power (MVA): Not disclosed#38 Microsoft Langley · IT load: Unknown; Facility demand / power options: Unknown; Grid connection: Unknown; Unspecified basis: Unknown; Apparent power (MVA): Unknown#39 Microsoft Skelton Grange · IT load: Unknown; Facility demand / power options: Unknown; Grid connection: Unknown; Unspecified basis: Unknown; Apparent power (MVA): Unknown#40 Norwich Apex Data Centre · IT load: Not disclosed; Facility demand / power options: Not disclosed; Grid connection: Not disclosed; Unspecified basis: 150 MW headline; conflicts with MVA definition; Apparent power (MVA): 150 MVA maximum demand; no MW conversion#41 Nscale AI Campus Loughton · IT load: 50 MW AI; up to 90 MW scalable (not additive); Facility demand / power options: Not disclosed; Grid connection: Not disclosed; Unspecified basis: Not disclosed; Apparent power (MVA): Not disclosed#42 Orbital Enfield / Hertsmere Junction 24 Ridgeway · IT load: Not disclosed; Facility demand / power options: Not disclosed; Grid connection: 300 MW terminal reserved offer; includes 150 MW initial; Unspecified basis: Not disclosed; Apparent power (MVA): Not disclosed#43 Pinewood Nurseries alternative data centre scheme · IT load: Unknown; Facility demand / power options: Unknown; Grid connection: Unknown; Unspecified basis: Unknown; Apparent power (MVA): Unknown#44 Port@l Nottingham Sherwood Business Park · IT load: 20 MW proposed; secondary-source/conditional; Facility demand / power options: Not disclosed; Grid connection: Not disclosed; Unspecified basis: Not disclosed; Apparent power (MVA): Not disclosed#45 Pure DC LON01 Brent Cross · IT load: Not disclosed; Facility demand / power options: Not disclosed; Grid connection: Not disclosed; Unspecified basis: 70 MW B2 phase; 90 MW whole campus incl. existing; Apparent power (MVA): Not disclosed#46 QTS Cambois data centre campus · IT load: 720 MW; Facility demand / power options: about 1,100 MW (design disclosure); Grid connection: Not disclosed; Unspecified basis: Not disclosed; Apparent power (MVA): Not disclosed#47 Quest Park Data Centre Campus · IT load: 720 MW; Facility demand / power options: 1,000 MW (design disclosure); Grid connection: 200 MW (source-reported connection); Unspecified basis: No selected summary claim; Apparent power (MVA): Not disclosed#48 Reading Quarry adjacent data centre · IT load: Unknown; Facility demand / power options: Unknown; Grid connection: Unknown; Unspecified basis: Unknown; Apparent power (MVA): Unknown#49 SEGRO Pure Premier Park · IT load: 56 MW; Facility demand / power options: Not disclosed; Grid connection: Not disclosed; Unspecified basis: Not disclosed; Apparent power (MVA): 70 MVA (separate boundary)#50 SEGRO Slough 2026 powered-shell pre-let · IT load: Not disclosed; Facility demand / power options: Not disclosed; Grid connection: Not disclosed; Unspecified basis: Not disclosed; Apparent power (MVA): 50 MVA#51 Shelford landfill data centre · IT load: Unknown; Facility demand / power options: Unknown; Grid connection: Unknown; Unspecified basis: Unknown; Apparent power (MVA): Unknown#52 Silicon Sands / Blackpool Airport Enterprise Zone digital campus · IT load: Not disclosed; Facility demand / power options: Not disclosed; Grid connection: 6 MW phase offer incl. offices/research; Unspecified basis: 2-6 MW demonstrator; up to 1,000 MW vision; Apparent power (MVA): Not disclosed#53 Somerset Data Centre / Horsey Level · IT load: Not disclosed; Facility demand / power options: Not disclosed; Grid connection: 500 MW applicant-reported offer; date conflict; Unspecified basis: No selected summary claim; Apparent power (MVA): Not disclosed#54 Stellium Cobalt Park campus · IT load: Not disclosed; Facility demand / power options: Not disclosed; Grid connection: up to 500 MW conditional scalability vision; Unspecified basis: No selected summary claim; Apparent power (MVA): 180 MVA terminal scalability (includes 80 MVA)#55 SUB1 Aston Cross data centre · IT load: Not disclosed; Facility demand / power options: Not disclosed; Grid connection: Not disclosed; Unspecified basis: 19 MW initial / 38 MW potential; historical, basis unresolved; Apparent power (MVA): Not disclosed#56 Teesworks The Foundry data centre and whole-Foundry expansion · IT load: Not disclosed; Facility demand / power options: Not disclosed; Grid connection: Not disclosed; Unspecified basis: Not disclosed; Apparent power (MVA): about 1,180 MVA whole Foundry; beyond approved parcel#57 Thames Valley Park Data Centre · IT load: about 72 MW; Facility demand / power options: Not disclosed; Grid connection: Not disclosed; Unspecified basis: Not disclosed; Apparent power (MVA): Not disclosed#58 Tilbury Data Centre & Ecology Park / Statera · IT load: Not disclosed; Facility demand / power options: Not disclosed; Grid connection: Not disclosed; Unspecified basis: up to 500 MW (basis unresolved); Apparent power (MVA): Not disclosed#59 Tritax Chelmsford · IT load: Not disclosed; Facility demand / power options: Not disclosed; Grid connection: 125 MW (source-reported initial delivery); Unspecified basis: Not disclosed; Apparent power (MVA): Not disclosed#60 Vortex South Liverpool Data Centre · IT load: Unknown; Facility demand / power options: Unknown; Grid connection: Unknown; Unspecified basis: Unknown; Apparent power (MVA): Unknown#61 Wapseys Wood Data Centre Campus · IT load: up to 300 MW (three buildings; not additive); Facility demand / power options: Not disclosed; Grid connection: Not disclosed; Unspecified basis: Not disclosed; Apparent power (MVA): Not disclosed#62 West London Technology Park revised two-building scheme · IT load: Not disclosed; Facility demand / power options: Not disclosed; Grid connection: Not disclosed; Unspecified basis: 90 MW (basis unresolved); Apparent power (MVA): Not disclosed#63 Wilton International Data Centre Phase 1 · IT load: Not disclosed; Facility demand / power options: Not disclosed; Grid connection: Not disclosed; Unspecified basis: 280 MW (basis unresolved); Apparent power (MVA): Not disclosed#64 Yondr Slough campus · IT load: Not disclosed; Facility demand / power options: Not disclosed; Grid connection: Not disclosed; Unspecified basis: 30 MW building (2024); >100 MW campus incl. existing; Apparent power (MVA): Not disclosed#65 GreenScale Derry Campus · IT load: Not disclosed; Facility demand / power options: Not disclosed; Grid connection: 100 MW source-claimed secured connection; Unspecified basis: Not disclosed; Apparent power (MVA): Not disclosed#66 Kilroot Data Centre · IT load: Not disclosed; Facility demand / power options: Not disclosed; Grid connection: 300 MW MIC application; Unspecified basis: Not disclosed; Apparent power (MVA): Not disclosed#67 Aurelius Data Centre · IT load: Not disclosed; Facility demand / power options: Not disclosed; Grid connection: Not disclosed; Unspecified basis: 400 MW reported / queue; basis unresolved; Apparent power (MVA): Not disclosed#68 Blackdog AI Campus · IT load: Not disclosed; Facility demand / power options: Not disclosed; Grid connection: Not disclosed; Unspecified basis: 600 MW initial renewable-plus-grid claim; basis unresolved; Apparent power (MVA): Not disclosed#69 Cato Data Centre · IT load: Not disclosed; Facility demand / power options: Not disclosed; Grid connection: 600 MW (secondary report); Unspecified basis: No selected summary claim; Apparent power (MVA): Not disclosed#70 Chapelcross CX Technology Campus · IT load: Not disclosed; Facility demand / power options: Not disclosed; Grid connection: Not disclosed; Unspecified basis: up to 1,000 MW campus potential; basis unresolved; Apparent power (MVA): Not disclosed#71 Cockenzie data centre · IT load: Not disclosed; Facility demand / power options: Not disclosed; Grid connection: Not disclosed; Unspecified basis: 200 MW (basis unresolved); Apparent power (MVA): Not disclosed#72 Coldstream data center campus · IT load: Not disclosed; Facility demand / power options: Not disclosed; Grid connection: Not disclosed; Unspecified basis: 300 MW (basis unresolved); Apparent power (MVA): Not disclosed#73 Drumshangie Data Centre · IT load: Not disclosed; Facility demand / power options: Not disclosed; Grid connection: 500 MW (secondary application report); Unspecified basis: Not disclosed; Apparent power (MVA): Not disclosed#74 Freeport Data Centre Campus · IT load: Not disclosed; Facility demand / power options: 250 MW demand design; Grid connection: 250 MW shared DC/BESS connection; allocation unresolved; Unspecified basis: No selected summary claim; Apparent power (MVA): Not disclosed#75 Haspielaw Farm Data Centre Campus · IT load: Unknown; Facility demand / power options: Unknown; Grid connection: Unknown; Unspecified basis: Unknown; Apparent power (MVA): Unknown#76 HFD DV4 Lancaster Avenue Chapelhall · IT load: Unknown; Facility demand / power options: Unknown; Grid connection: Unknown; Unspecified basis: Unknown; Apparent power (MVA): Unknown#78 Hunterston Data Centre · IT load: Unknown; Facility demand / power options: Unknown; Grid connection: Unknown; Unspecified basis: Unknown; Apparent power (MVA): Unknown#79 Larbert Data Centre Campus · IT load: 230 MW; Facility demand / power options: Not disclosed; Grid connection: 300 MW (modification application); Unspecified basis: No selected summary claim; Apparent power (MVA): 300 MVA#80 Ochiltree data center campus · IT load: 200 MW; Facility demand / power options: Not disclosed; Grid connection: Not disclosed; Unspecified basis: Not disclosed; Apparent power (MVA): Not disclosed#81 Oxwellmains Data Centre · IT load: Unknown; Facility demand / power options: Unknown; Grid connection: Unknown; Unspecified basis: Unknown; Apparent power (MVA): Unknown#82 Queensway Park Data Centre · IT load: Not disclosed; Facility demand / power options: Not disclosed; Grid connection: Not disclosed; Unspecified basis: 20 MW (basis unresolved); Apparent power (MVA): Not disclosed#83 Ravenscraig / SevenFourEight campus · IT load: Not disclosed; Facility demand / power options: Not disclosed; Grid connection: 550 MW (modification application); Unspecified basis: No selected summary claim; Apparent power (MVA): Not disclosed#84 Rufus Data Centre · IT load: Not disclosed; Facility demand / power options: 540 MW (official interpretation); Grid connection: Not disclosed; Unspecified basis: No selected summary claim; Apparent power (MVA): Not disclosed#85 Southside Data Centre · IT load: Not disclosed; Facility demand / power options: Not disclosed; Grid connection: Not disclosed; Unspecified basis: 225 MW (basis unresolved); Apparent power (MVA): Not disclosed#86 Spango Valley Data Centre · IT load: Not disclosed; Facility demand / power options: Not disclosed; Grid connection: Not disclosed; Unspecified basis: 150 MW (basis unresolved); Apparent power (MVA): Not disclosed#87 West Barns Mains Data Centre · IT load: Unknown; Facility demand / power options: Unknown; Grid connection: Unknown; Unspecified basis: Unknown; Apparent power (MVA): Unknown#88 Wester Hermiston Data Centre Campus · IT load: Not disclosed; Facility demand / power options: 200 MW (design disclosure); Grid connection: 200 MW (source-reported connection); Unspecified basis: No selected summary claim; Apparent power (MVA): Not disclosed#89 Westerhill Data Centre Campus · IT load: Not disclosed; Facility demand / power options: 300 MW demand design; Grid connection: 300 MW modification application; Unspecified basis: Not disclosed; Apparent power (MVA): Not disclosed#90 Cardiff East Park and Ride Data Centre · IT load: Not disclosed; Facility demand / power options: 210 MW servers + cooling (source model); Grid connection: Not disclosed; Unspecified basis: 150 MW DC claim; not explicitly IT; Apparent power (MVA): Not disclosed#91 GCRE Nant Helen Energy and Data Centre Partner Opportunity · IT load: Not disclosed; Facility demand / power options: Not disclosed; Grid connection: Not disclosed; Unspecified basis: 350 MW site proposal; basis unresolved; Apparent power (MVA): Not disclosed#92 Microsoft Newport Imperial Park · IT load: Unknown; Facility demand / power options: Unknown; Grid connection: Unknown; Unspecified basis: Unknown; Apparent power (MVA): Unknown#93 Mwyndy Cross eastern parcel Maska option2 · IT load: Unknown; Facility demand / power options: Unknown; Grid connection: Unknown; Unspecified basis: Unknown; Apparent power (MVA): Unknown#94 Mwyndy Cross western parcel VDC CWL31 · IT load: Unknown; Facility demand / power options: Unknown; Grid connection: Unknown; Unspecified basis: Unknown; Apparent power (MVA): Unknown#95 Rover Way energy park and data centre, Splott · IT load: Not disclosed; Facility demand / power options: Not disclosed; Grid connection: Not disclosed; Unspecified basis: Not disclosed; Apparent power (MVA): 90 MVA#96 Swansea Port Blue Eden Data Centre · IT load: Unknown; Facility demand / power options: Unknown; Grid connection: Unknown; Unspecified basis: Unknown; Apparent power (MVA): Unknown#97 Vantage Bridgend CWL4 · IT load: Unknown; Facility demand / power options: Unknown; Grid connection: Unknown; Unspecified basis: Unknown; Apparent power (MVA): Unknown#98 Vantage Bro Tathan · IT load: Not disclosed; Facility demand / power options: Not disclosed; Grid connection: 24 MW offer (2025); Unspecified basis: 120 MW campus plan; basis unresolved; Apparent power (MVA): Not disclosed#99 Vantage Newport CWL1 · IT load: Not disclosed; Facility demand / power options: Not disclosed; Grid connection: Not disclosed; Unspecified basis: 148 MW whole campus incl. existing; expansion MW unknown; Apparent power (MVA): Not disclosed

Drag to pan · + / − or Ctrl + scroll to zoom

Other development evidencePermission reportedConstruction / enablingLocality proxy

Numbers identify records in this edition; they are not cluster counts. Marker size does not represent MW. Positions are indicative; unlocated records remain in the selector and full register.

02 / RECORDS

A source-linked project list

99 records · Stable project links

Open a record for its sources, capacity qualifications, location precision and suggested citation. “Unknown” means no planning capacity is disclosed for the project. “Not disclosed” means a particular basis is absent. “No selected summary claim” links to retained historical or conflicting disclosures. None means zero. The table remains available without JavaScript.

UK project records · evidence to 22 September 2026 · capacities must not be added across categories
No.Project / locationReported development stageIT/computeFacility demand / power optionsGrid/supplyReported MW · basis unknownApparent power · MVA
1Amazon Didcot North campusOX11 7BF · Postcode centroidPlanning application or reserved mattersUnknownUnknownUnknownUnknownUnknown
2Amazon Web Services Plot 3 Maylands AvenueHP2 4FQ · Postcode centroidPlanned or early developmentUnknownUnknownUnknownUnknownUnknown
3Ark Hilfield Park / former Mercure HotelElstree · Approximate localityPlanning application or reserved mattersNot disclosedNot disclosedNot disclosedNot disclosed250 MVA campus; not summed circuit ratings
4Ark Longcross Park - completed LP1 and planned campus computeKT16 0EE · Postcode centroidOperating site with expansion plans55 MW campus compute incl. completed LP1; remainder unknownNot disclosedNot disclosedNot disclosedNot disclosed
5Avonmouth Data CentreBS11 0YU · Postcode centroidPlanning application or reserved matters40 MWNot disclosedNot disclosedNot disclosedNot disclosed
6Clearstone Luton data centre campusLuton · Approximate localityPlanning permission reportedNot disclosedNot disclosed300 MW (connection date unconfirmed)Not disclosedNot disclosed
7CloudHQ LHR Didcot campusDidcot · Approximate localityPlanning permission reported101 MW catalogue; operating/planned split unresolvedNot disclosedNot disclosedNot disclosedNot disclosed
8Colt Hayes Digital Park expansion London6/7/8Hayes · Approximate localityPlanning permission reported97 MW expansionNot disclosed250 MW whole-campus connection, reportedNot disclosed40 MVA earlier parcel supply; not additive
9Conesby Data Centre CampusScunthorpe · Approximate localityPre-application or consultationUnknownUnknownUnknownUnknownUnknown
10Cottam data centre campusCottam · Approximate localityPlanned or early developmentNot disclosedup to 1,000 MW conditional DC demandNot disclosedNo selected summary claimNot disclosed
11Culham mission-led AI data centreCulham · Approximate localityPlanned or early developmentNot disclosedNot disclosed100 MW (available supply)Not disclosedNot disclosed
12Deep Green Bradford, Listerhills RoadBradford · Approximate localityPlanning permission reportedNot disclosedNot disclosedNot disclosed5.6 MW (basis unresolved)Not disclosed
13Devon Data Campus / ValeonAlverdiscott · Approximate localityPlanned or early developmentup to 1,500 MW compute1,800 MW peak, meeting reportNot disclosedNo selected summary claimNot disclosed
14Digital Realty Redhill units1-2 redevelopmentRedhill · Approximate localityPlanning permission reportedUnknownUnknownUnknownUnknownUnknown
15Drax Power Station data centre optionsDrax · Approximate localityPlanned or early developmentNot disclosed~100 MW grid-fed / ~500 MW behind-meter conditional options (Jul 2026)Not disclosedNo selected summary claimNot disclosed
16East Havering Data Centre CampusNorth Ockendon · Approximate localityPre-application or consultation490 MW maximumNot disclosedNo selected summary claimNot disclosed600 MVA terminal; includes 160 MVA initial
17Ebbsfleet AI Data Centre CampusDartford · Approximate localityPre-application or consultationNot disclosedup to 300 MW (design disclosure)Not disclosedNo selected summary claimNot disclosed
18Elsham Tech ParkElsham · Approximate localityPlanning application or reserved mattersNot disclosed1,000 MW (design disclosure)Not disclosedNot disclosedNot disclosed
19Era4 Erin Landfill modular data centreS44 5HS · Postcode centroidPlanning application or reserved mattersUnknownUnknownUnknownUnknownUnknown
20Ferrybridge C Zone A Data CentreKnottingley · Approximate localityPlanning permission reportedUnknownUnknownUnknownUnknownUnknown
21Former White's Reclamation Site data centre, EcclesM30 7LW · Postcode centroidPlanning permission reportedUnknownUnknownUnknownUnknownUnknown
22Global Switch London (campus grouping)Docklands · Approximate localityOperating site with expansion plansNot disclosedNot disclosedNot disclosed87 / 18 / 70 MW by London building; mixed stock/expansion; basis unresolvedNot disclosed
23Graven Hill D1 data centreBicester · Approximate localityPlanning application or reserved matters290 MW435 MW utility designNot disclosedNot disclosedNot disclosed
24Green Mountain LON-East RomfordRomford · Approximate localityOperating site with expansion plansNot disclosedNot disclosedNot disclosed37 MW whole-campus plan incl. delivered phasesNot disclosed
25Greystoke Abbots LangleyWD5 0QE · Postcode centroidPlanning permission reportedNot disclosedNot disclosedNot disclosed96 MW (basis unresolved)Not disclosed
26Haslemere Heathrow EstateTW4 6NF · Postcode centroidPlanning permission reportedNot disclosedNot disclosedNot disclosedNot disclosed80 MVA grid offer
27Humber Tech ParkSouth Killingholme · Approximate localityPlanning permission reportedup to 384 MW whole campus (2024 design)Not disclosedNot disclosedNo selected summary claimNot disclosed
28Iron Mountain LON-3111 Buckingham Avenue, Slough · Postcode centroidReported delivery target (unconfirmed)25 MW; target opening 2026, status unverifiedNot disclosedNot disclosedNot disclosedNot disclosed
29Kao Data Harlow Plot F (KLON-07 and KLON-08)Harlow · Approximate localityPlanned or early developmentUnknownUnknownUnknownUnknownUnknown
30Kao Data ManchesterStockport · Approximate localityEnabling works40 MW historical design (conditional)Not disclosedNot disclosed33 MW current catalogue; basis unresolved; not additiveNot disclosed
31L51 Bridle Road Data Centre campusLiverpool · Approximate localityPlanning permission reportedNot disclosedNot disclosed50 MW (source-claimed contract)Not disclosedNot disclosed
32Latos Manchester East Bower StreetNewton Heath · Approximate localityPlanning application or reserved mattersUnknownUnknownUnknownUnknownUnknown
33Latos Preston Farm Neural EdgeWestland Way, Preston Farm Industrial Estate, Stockton-on-Tees · Source reference pointConstruction reportedup to 9.5 MWNot disclosedNot disclosedNot disclosedNot disclosed
34LON6 Iver campusIver Heath · Approximate localityPlanned or early development90 MWNot disclosedNot disclosedNot disclosedNot disclosed
35Manor Farm and land north of Wraysbury ReservoirSL3 0AA · Postcode centroidPlanning permission reported72 MWNot disclosed107 MW phase 1 claimed; 147 MW terminal potentialNot disclosedNot disclosed
36MedwayOne former Kingsnorth power stationKingsnorth · Approximate localityPlanning permission reportedNot disclosedNot disclosedNot disclosed340 MW (queue field; basis unresolved)Not disclosed
37Microsoft Eggborough campusEggborough · Approximate localityPlanning application or reserved mattersNot disclosedNot disclosedNot disclosed300 MW (queue field; basis unresolved)Not disclosed
38Microsoft LangleySlough · Approximate localityEnabling worksUnknownUnknownUnknownUnknownUnknown
39Microsoft Skelton GrangeLeeds · Approximate localityPre-application or consultationUnknownUnknownUnknownUnknownUnknown
40Norwich Apex Data CentreKeswick · Approximate localityPre-application or consultationNot disclosedNot disclosedNot disclosed150 MW headline; conflicts with MVA definition150 MVA maximum demand; no MW conversion
41Nscale AI Campus LoughtonLoughton · Approximate localityPlanned or early development50 MW AI; up to 90 MW scalable (not additive)Not disclosedNot disclosedNot disclosedNot disclosed
42Orbital Enfield / Hertsmere Junction 24 RidgewayEnfield Town · Approximate localityConnection offer or developmentNot disclosedNot disclosed300 MW terminal reserved offer; includes 150 MW initialNot disclosedNot disclosed
43Pinewood Nurseries alternative data centre schemeSL3 6NB · Postcode centroidPlanning application or reserved mattersUnknownUnknownUnknownUnknownUnknown
44Port@l Nottingham Sherwood Business ParkNG15 0DR · Postcode centroidPlanned or early development20 MW proposed; secondary-source/conditionalNot disclosedNot disclosedNot disclosedNot disclosed
45Pure DC LON01 Brent CrossPriestly Way, Brent, London · Source reference pointOperating site with expansion plansNot disclosedNot disclosedNot disclosed70 MW B2 phase; 90 MW whole campus incl. existingNot disclosed
46QTS Cambois data centre campusCambois · Approximate localityEnabling works720 MWabout 1,100 MW (design disclosure)Not disclosedNot disclosedNot disclosed
47Quest Park Data Centre CampusBedford · Approximate localityPre-application or consultation720 MW1,000 MW (design disclosure)200 MW (source-reported connection)No selected summary claimNot disclosed
48Reading Quarry adjacent data centreBurghfield · Approximate localityPlanning permission reportedUnknownUnknownUnknownUnknownUnknown
49SEGRO Pure Premier ParkPark Royal · Approximate localityPlanning permission reported56 MWNot disclosedNot disclosedNot disclosed70 MVA (separate boundary)
50SEGRO Slough 2026 powered-shell pre-letSlough · Approximate localityPlanning permission reportedNot disclosedNot disclosedNot disclosedNot disclosed50 MVA
51Shelford landfill data centreCanterbury · Approximate localityPlanning application or reserved mattersUnknownUnknownUnknownUnknownUnknown
52Silicon Sands / Blackpool Airport Enterprise Zone digital campusBlackpool · Approximate localityPlanning permission reportedNot disclosedNot disclosed6 MW phase offer incl. offices/research2-6 MW demonstrator; up to 1,000 MW visionNot disclosed
53Somerset Data Centre / Horsey LevelBridgwater · Approximate localityPre-application or consultationNot disclosedNot disclosed500 MW applicant-reported offer; date conflictNo selected summary claimNot disclosed
54Stellium Cobalt Park campusNorth Tyneside · Approximate localityOperating site with expansion plansNot disclosedNot disclosedup to 500 MW conditional scalability visionNo selected summary claim180 MVA terminal scalability (includes 80 MVA)
55SUB1 Aston Cross data centreB6 5RQ · Postcode centroidPlanning permission reportedNot disclosedNot disclosedNot disclosed19 MW initial / 38 MW potential; historical, basis unresolvedNot disclosed
56Teesworks The Foundry data centre and whole-Foundry expansionRedcar · Approximate localityPlanning permission reportedNot disclosedNot disclosedNot disclosedNot disclosedabout 1,180 MVA whole Foundry; beyond approved parcel
57Thames Valley Park Data CentreRG6 1WG · Postcode centroidPre-application or consultationabout 72 MWNot disclosedNot disclosedNot disclosedNot disclosed
58Tilbury Data Centre & Ecology Park / StateraTilbury · Approximate localityPlanned or early developmentNot disclosedNot disclosedNot disclosedup to 500 MW (basis unresolved)Not disclosed
59Tritax ChelmsfordChelmsford · Approximate localityPlanned or early developmentNot disclosedNot disclosed125 MW (source-reported initial delivery)Not disclosedNot disclosed
60Vortex South Liverpool Data CentreLiverpool · Approximate localityConstruction reportedUnknownUnknownUnknownUnknownUnknown
61Wapseys Wood Data Centre CampusWapseys Wood DC02 reference · Source reference pointPre-application or consultationup to 300 MW (three buildings; not additive)Not disclosedNot disclosedNot disclosedNot disclosed
62West London Technology Park revised two-building schemeLondon · Approximate localityPlanning permission reportedNot disclosedNot disclosedNot disclosed90 MW (basis unresolved)Not disclosed
63Wilton International Data Centre Phase 1Wilton · Approximate localityPlanning application or reserved mattersNot disclosedNot disclosedNot disclosed280 MW (basis unresolved)Not disclosed
64Yondr Slough campusLON1X2, Wexham Road, Slough · Postcode centroidOperating site with expansion plansNot disclosedNot disclosedNot disclosed30 MW building (2024); >100 MW campus incl. existingNot disclosed
65GreenScale Derry CampusDerry · Approximate localityPlanned or early developmentNot disclosedNot disclosed100 MW source-claimed secured connectionNot disclosedNot disclosed
66Kilroot Data CentreKilroot · Approximate localityConnection offer or developmentNot disclosedNot disclosed300 MW MIC applicationNot disclosedNot disclosed
67Aurelius Data CentreNewhouse · Approximate localityPre-application or consultationNot disclosedNot disclosedNot disclosed400 MW reported / queue; basis unresolvedNot disclosed
68Blackdog AI CampusBlackdog · Source reference pointPre-application or consultationNot disclosedNot disclosedNot disclosed600 MW initial renewable-plus-grid claim; basis unresolvedNot disclosed
69Cato Data CentreAuchtertool · Approximate localityPlanning application or reserved mattersNot disclosedNot disclosed600 MW (secondary report)No selected summary claimNot disclosed
70Chapelcross CX Technology CampusChapelcross · Approximate localityPre-application or consultationNot disclosedNot disclosedNot disclosedup to 1,000 MW campus potential; basis unresolvedNot disclosed
71Cockenzie data centreCockenzie · Approximate localityPre-application or consultationNot disclosedNot disclosedNot disclosed200 MW (basis unresolved)Not disclosed
72Coldstream data center campusColdstream · Approximate localityPre-application or consultationNot disclosedNot disclosedNot disclosed300 MW (basis unresolved)Not disclosed
73Drumshangie Data CentreGreengairs · Approximate localityPre-application or consultationNot disclosedNot disclosed500 MW (secondary application report)Not disclosedNot disclosed
74Freeport Data Centre CampusWest Calder · Approximate localityPre-application or consultationNot disclosed250 MW demand design250 MW shared DC/BESS connection; allocation unresolvedNo selected summary claimNot disclosed
75Haspielaw Farm Data Centre CampusHamilton · Approximate localityPre-application or consultationUnknownUnknownUnknownUnknownUnknown
76HFD DV4 Lancaster Avenue ChapelhallChapelhall · Approximate localityPre-application or consultationUnknownUnknownUnknownUnknownUnknown
77HFD DV6 South Lanridge FarmScotland · UnlocatedPre-application or consultationUnknownUnknownUnknownUnknownUnknown
78Hunterston Data CentreWest Kilbride · Approximate localityPre-application or consultationUnknownUnknownUnknownUnknownUnknown
79Larbert Data Centre CampusLarbert · Approximate localityPlanning application or reserved matters230 MWNot disclosed300 MW (modification application)No selected summary claim300 MVA
80Ochiltree data center campusCumnock · Approximate localityPre-application or consultation200 MWNot disclosedNot disclosedNot disclosedNot disclosed
81Oxwellmains Data CentreDunbar · Approximate localityPlanning application or reserved mattersUnknownUnknownUnknownUnknownUnknown
82Queensway Park Data CentreGlenrothes · Approximate localityPlanning permission reportedNot disclosedNot disclosedNot disclosed20 MW (basis unresolved)Not disclosed
83Ravenscraig / SevenFourEight campusMotherwell · Approximate localityPlanning application or reserved mattersNot disclosedNot disclosed550 MW (modification application)No selected summary claimNot disclosed
84Rufus Data CentreHurlford · Approximate localityPre-application or consultationNot disclosed540 MW (official interpretation)Not disclosedNo selected summary claimNot disclosed
85Southside Data CentreLongformacus · Approximate localityPre-application or consultationNot disclosedNot disclosedNot disclosed225 MW (basis unresolved)Not disclosed
86Spango Valley Data CentreGreenock · Approximate localityPre-application or consultationNot disclosedNot disclosedNot disclosed150 MW (basis unresolved)Not disclosed
87West Barns Mains Data CentreWest Barns · Approximate localityPre-application or consultationUnknownUnknownUnknownUnknownUnknown
88Wester Hermiston Data Centre CampusHermiston · Approximate localityPre-application or consultationNot disclosed200 MW (design disclosure)200 MW (source-reported connection)No selected summary claimNot disclosed
89Westerhill Data Centre CampusBishopbriggs · Approximate localityPre-application or consultationNot disclosed300 MW demand design300 MW modification applicationNot disclosedNot disclosed
90Cardiff East Park and Ride Data CentreOld St. Mellons · Approximate localityPlanning application or reserved mattersNot disclosed210 MW servers + cooling (source model)Not disclosed150 MW DC claim; not explicitly ITNot disclosed
91GCRE Nant Helen Energy and Data Centre Partner OpportunityCoelbren · Approximate localityPlanned or early developmentNot disclosedNot disclosedNot disclosed350 MW site proposal; basis unresolvedNot disclosed
92Microsoft Newport Imperial ParkNewport · Approximate localityConstruction reportedUnknownUnknownUnknownUnknownUnknown
93Mwyndy Cross eastern parcel Maska option2Mwyndy · Approximate localityPlanning application or reserved mattersUnknownUnknownUnknownUnknownUnknown
94Mwyndy Cross western parcel VDC CWL31Mwyndy · Approximate localityPlanning permission reportedUnknownUnknownUnknownUnknownUnknown
95Rover Way energy park and data centre, SplottTremorfa · Approximate localityPlanning permission reportedNot disclosedNot disclosedNot disclosedNot disclosed90 MVA
96Swansea Port Blue Eden Data CentreSwansea · Approximate localityPlanned or early developmentUnknownUnknownUnknownUnknownUnknown
97Vantage Bridgend CWL4Bridgend · Approximate localityPlanning application or reserved mattersUnknownUnknownUnknownUnknownUnknown
98Vantage Bro TathanSt Athan · Approximate localityPlanning permission reportedNot disclosedNot disclosed24 MW offer (2025)120 MW campus plan; basis unresolvedNot disclosed
99Vantage Newport CWL1Newport · Approximate localityOperating site with expansion plansNot disclosedNot disclosedNot disclosed148 MW whole campus incl. existing; expansion MW unknownNot disclosed