PROJECT RECORD 72 · P028
Coldstream data center campus
Scotland · Pre-application or consultation
Reported capacity
Claims use different boundaries and may describe overlapping phases or the whole campus. Values below are not additive, and are not an estimate of remaining construction or incremental grid demand.
IT/compute
Not disclosed
Facility demand / power options
Not disclosed
Grid/supply
Not disclosed
Reported MW · basis unknown
300 MW (basis unresolved)
Retained source claims (may be historical or conflicting)
- 300 MWReported planning or campus figure; source stage may remain unresolvedData center buildings capacityColdstream data center campussource-stage unresolvedClaim source ↗
- 300 MWReported planning or campus figure; source stage may remain unresolvedData center buildings capacity69-hectare greenfield proposalsource-stage unresolvedClaim source ↗
Apparent power · MVA
Not disclosed
Location & development stage
- Stage interpretation
- Pre-application or consultation
- Place / location reference
- Coldstream
- Position precision
- Approximate locality
- Map position
- 55.6511, -2.2529 (latitude, longitude)
Source project P028: North and east of Stainrigg Mains Farm. Coldstream in Scottish Borders; locality point does not identify Stainrigg Mains Farm parcel. Locality representative point only; no site coordinate inferred.
Map points are not surveyed parcel boundaries or electricity connection nodes. The stage is a source-based interpretation at the evidence cutoff, not a current-status check.
Project evidence
These links identify the original publishers. A source may concern a different permit, phase or capacity boundary; use it with the qualifications above.
Cite this record
ElecTrace (2026-10-14). Coldstream data center campus. UK Data Centre Planning Database, version 1.0.0, project record P028. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/P028
Add your access date. Map number 72 is specific to this release; use the record identifier P028 and URL for citations.