PROJECT RECORD 67 · UKN007
Aurelius Data Centre
Scotland · Pre-application or consultation
Reported capacity
Claims use different boundaries and may describe overlapping phases or the whole campus. Values below are not additive, and are not an estimate of remaining construction or incremental grid demand.
IT/compute
Not disclosed
Facility demand / power options
Not disclosed
Grid/supply
Not disclosed
Reported MW · basis unknown
400 MW reported / queue; basis unresolved
Retained source claims (may be historical or conflicting)
- 400 MWReported planning or campus figure; source stage may remain unresolvedsecondary_report_unspecifiedunspecifiedsource-stage unresolvedClaim source ↗
- 400 MWReported planning or campus figure; source stage may remain unresolvedea_associated_installed_capacityCustomer/DNO supplied queue-item capacity, possibly stage or technology element; not certified maximum importMW unit from NESO explanatory FOI, not added to original XLSX raw fieldsource-stage unresolvedClaim source ↗
Apparent power · MVA
Not disclosed
Location & development stage
- Stage interpretation
- Pre-application or consultation
- Place / location reference
- Newhouse
- Position precision
- Approximate locality
- Map position
- 55.8167, -3.8667 (latitude, longitude)
Source project UKN007: Newhouse, North Lanrigg Farm, North Lanarkshire. Newhouse, North Lanarkshire; the farm parcel is not geocoded. Locality representative point only; no site coordinate inferred.
Map points are not surveyed parcel boundaries or electricity connection nodes. The stage is a source-based interpretation at the evidence cutoff, not a current-status check.
Project evidence
These links identify the original publishers. A source may concern a different permit, phase or capacity boundary; use it with the qualifications above.
- https://uk.linkedin.com/company/ili-group
- https://aprs.scot/wp-content/uploads/2026/07/26_00595_EIASCR-EIA_SCREENING_REQUEST-2012718.pdf
- https://www.neso.energy/document/373996/download
- https://eplanning.northlanarkshire.gov.uk/online-applications/files/AC78A0B9CAB36CD9C65A97CECCE73F2C/pdf/26_00595_EIASCR-LOCATION_PLAN_INCLUDING_GRID_CONNECTION_AREA-2026255.pdf
- https://aprs.scot/newhouse-dc/
Cite this record
ElecTrace (2026-10-14). Aurelius Data Centre. UK Data Centre Planning Database, version 1.0.0, project record UKN007. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UKN007
Add your access date. Map number 67 is specific to this release; use the record identifier UKN007 and URL for citations.