PROJECT RECORD 86 · UKN014
Spango Valley Data Centre
Scotland · Pre-application or consultation
Reported capacity
Claims use different boundaries and may describe overlapping phases or the whole campus. Values below are not additive, and are not an estimate of remaining construction or incremental grid demand.
IT/compute
Not disclosed
Facility demand / power options
Not disclosed
Grid/supply
Not disclosed
Reported MW · basis unknown
150 MW (basis unresolved)
Retained source claims (may be historical or conflicting)
- 150 MWReported planning or campus figure; source stage may remain unresolvedsecondary_report_of_PAC_annexunspecifiedsource-stage unresolvedClaim source ↗
Apparent power · MVA
Not disclosed
Location & development stage
- Stage interpretation
- Pre-application or consultation
- Place / location reference
- Greenock
- Position precision
- Approximate locality
- Map position
- 55.9484, -4.7612 (latitude, longitude)
Source project UKN014: Former IBM site, Spango Valley, Greenock, Inverclyde. Source states Spango Valley, Greenock, Inverclyde; Greenock is a broader locality proxy. Locality representative point only; no site coordinate inferred.
Map points are not surveyed parcel boundaries or electricity connection nodes. The stage is a source-based interpretation at the evidence cutoff, not a current-status check.
Project evidence
These links identify the original publishers. A source may concern a different permit, phase or capacity boundary; use it with the qualifications above.
Cite this record
ElecTrace (2026-10-14). Spango Valley Data Centre. UK Data Centre Planning Database, version 1.0.0, project record UKN014. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UKN014
Add your access date. Map number 86 is specific to this release; use the record identifier UKN014 and URL for citations.