ElecTraceComputeCOMPUTE–ELECTRICITY COORDINATION

PROJECT RECORD 93 · UK-REBUILD-NORTH-005

Mwyndy Cross eastern parcel Maska option2

Wales · Planning application or reserved matters

← All project records

Evidence cutoff22 September 2026
Record identifierUK-REBUILD-NORTH-005
ReleaseVersion 1.0.0 · 14 October 2026

Reported capacity

Claims use different boundaries and may describe overlapping phases or the whole campus. Values below are not additive, and are not an estimate of remaining construction or incremental grid demand.

Planning capacity: Unknown. No DC planning power capacity disclosed in frozen sources; non-demand equipment/area measures do not fill this gap.

IT/compute

Unknown

Facility demand / power options

Unknown

Grid/supply

Unknown

Reported MW · basis unknown

Unknown

Apparent power · MVA

Unknown

Location & development stage

Stage interpretation
Planning application or reserved matters
Place / location reference
Mwyndy
Position precision
Approximate locality
Map position
51.5267, -3.3664 (latitude, longitude)

Source project UK-REBUILD-NORTH-005: East of Mwyndy Cross, south of A473, eastern SSA8 employment parcel. Source specifies eastern Mwyndy Cross parcel; same locality proxy as western parcel, not a site identity merge. Locality representative point only; no site coordinate inferred.

Map points are not surveyed parcel boundaries or electricity connection nodes. The stage is a source-based interpretation at the evidence cutoff, not a current-status check.

Location source ↗

Project evidence

These links identify the original publishers. A source may concern a different permit, phase or capacity boundary; use it with the qualifications above.

How records are selected and interpreted →

Cite this record

ElecTrace (2026-10-14). Mwyndy Cross eastern parcel Maska option2. UK Data Centre Planning Database, version 1.0.0, project record UK-REBUILD-NORTH-005. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UK-REBUILD-NORTH-005

Add your access date. Map number 93 is specific to this release; use the record identifier UK-REBUILD-NORTH-005 and URL for citations.

Suggest a correction with supporting evidence →