PROJECT RECORD 24 · UKS012
Green Mountain LON-East Romford
England · Operating site with expansion plans
Reported capacity
Claims use different boundaries and may describe overlapping phases or the whole campus. Values below are not additive, and are not an estimate of remaining construction or incremental grid demand.
IT/compute
Not disclosed
Facility demand / power options
Not disclosed
Grid/supply
Not disclosed
Reported MW · basis unknown
37 MW whole-campus plan incl. delivered phases
Retained source claims (may be historical or conflicting)
- 37 MWReported planning or campus figure; source stage may remain unresolvedcampus_unspecifiedGreen Mountain LON-East Romfordsource-stage unresolvedClaim source · 2026-06-08 ↗
Apparent power · MVA
Not disclosed
- Includes existing facilities or conditional expansion: disclosed campus capacity is not remaining new-build demand; no subtraction is inferred.
Location & development stage
- Stage interpretation
- Operating site with expansion plans
- Place / location reference
- Romford
- Position precision
- Approximate locality
- Map position
- 51.5752, 0.1858 (latitude, longitude)
The source specifically says Romford, East London, but the matcher preferred East London and placed the marker well west of Romford. Corrected to the source-named locality; not a site coordinate.
Map points are not surveyed parcel boundaries or electricity connection nodes. The stage is a source-based interpretation at the evidence cutoff, not a current-status check.
Project evidence
These links identify the original publishers. A source may concern a different permit, phase or capacity boundary; use it with the qualifications above.
Cite this record
ElecTrace (2026-10-14). Green Mountain LON-East Romford. UK Data Centre Planning Database, version 1.0.0, project record UKS012. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UKS012
Add your access date. Map number 24 is specific to this release; use the record identifier UKS012 and URL for citations.