  "metadata": {
    "title": "UK Data Centre Planning Database",
    "version": "1.0.0",
    "evidence_cutoff": "2026-09-22",
    "publication_date": "2026-10-14",
    "compiler": "ElecTrace",
    "publisher": "ElecTrace",
    "canonical_url": "https://electrace.uk/compute/uk-data-centres",
    "citation_text": "ElecTrace (2026-10-14). UK Data Centre Planning Database, version 1.0.0. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres",
    "original_sources": "ElecTrace compiles the project records. Original statements remain attributed to their linked providers; ElecTrace is not their original publisher.",
    "record_scope": "Reviewed project records, not a count of confirmed physical campuses or independently additive developments.",
    "release_scope": "99 reviewed main records are published. 83 unresolved candidate records are excluded from this release. Status reflects the frozen evidence, not a live planning-register check.",
    "coordinate_policy": "Most markers represent approximate localities or postcode centroids. Source reference points are not surveyed site boundaries. One record remains unlocated.",
    "capacity_policy": "IT/compute, facility demand or power options, grid connection/supply, reported unresolved-basis capacity, and MVA remain separate. No category, phase, campus or source-version sums; no PUE or MVA conversion. Existing/completed capacity is context only. Unknown means no disclosed DC planning power capacity in the reviewed evidence.",
    "capacity_display_policy": "JSON capacity_columns preserves an empty string when no summary is selected. The project CSV displays No selected summary claim where that category retains claims, Not disclosed where the category is empty but another planning/campus category is disclosed, and Unknown only for records with no disclosed planning/campus power capacity. Existing/completed context alone does not establish a planning disclosure.",
    "category_labels": {
      "it": "IT / compute capacity",
      "facility": "Facility demand / power options (stated boundary)",
      "grid": "Grid connection / supply",
      "unspecified": "Reported capacity (basis unresolved)",
      "mva": "Apparent power (MVA)"
    },
    "stage_labels": {
      "connection_offer_or_development": "Connection offer or development",
      "construction_reported": "Construction reported",
      "delivery_target_unconfirmed": "Reported delivery target (unconfirmed)",
      "enabling_works": "Enabling works",
      "operating_with_expansion": "Operating site with expansion plans",
      "planned_or_early_development": "Planned or early development",
      "planning_application_or_reserved_matters": "Planning application or reserved matters",
      "planning_permission_reported": "Planning permission reported",
      "pre_application_or_consultation": "Pre-application or consultation"
    },
    "summary": {
      "project_count": 99,
      "mapped_project_count": 98,
      "unknown_capacity_project_count": 26,
      "unresolved_records_excluded": 83,
      "stage_counts": {
        "Connection offer or development": 2,
        "Construction reported": 3,
        "Enabling works": 3,
        "Operating site with expansion plans": 7,
        "Planned or early development": 14,
        "Planning application or reserved matters": 18,
        "Planning permission reported": 24,
        "Pre-application or consultation": 27,
        "Reported delivery target (unconfirmed)": 1
      },
      "nation_counts": {
        "England": 64,
        "Northern Ireland": 2,
        "Scotland": 23,
        "Wales": 10
      },
      "coordinate_precision_counts": {
        "locality_proxy": 79,
        "postcode_centroid": 15,
        "source_reference_point": 4,
        "unlocated": 1
      }
    },
    "downloads": {
      "projects_json": "/data/uk-data-centres/v1.0.0/projects.json",
      "projects_csv": "/data/uk-data-centres/v1.0.0/projects.csv",
      "claims_csv": "/data/uk-data-centres/v1.0.0/claims.csv",
      "manifest_json": "/data/uk-data-centres/v1.0.0/manifest.json"
    }
  },
  "projects": [
    {
      "project_id": "SOUTH-AWS-DIDCOTN",
      "name": "Amazon Didcot North campus",
      "nation": "England",
      "stage_detail": "planning_application_or_reserved_matters",
      "stage_label": "Planning application or reserved matters",
      "latitude": 51.620368,
      "longitude": -1.256643,
      "coordinate_precision": "postcode_centroid",
      "coordinate_note": "Public postcode centroid. Not a surveyed site boundary.",
      "coordinate_source": "https://api.postcodes.io/postcodes/OX11%207BF",
      "location_label": "OX11 7BF",
      "source_urls": [
        "https://www.gov.uk/government/publications/ox11-7bf-amazon-data-services-uk-limited-environmental-permit-issued-eprgp3127lva001",
        "https://assets.publishing.service.gov.uk/media/6a7077d10ddb7e4831c62b62/Application_Bespoke_A001_Permit_-27072026.pdf",
        "https://deliveringdidcotdatacampus.co.uk/"
      ],
      "source_dates": [
        "2026-08-03",
        "2026-07-27"
      ],
      "map_id": 1,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "",
        "unspecified": "",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [],
        "unspecified": [],
        "mva": []
      },
      "capacity_display": "Unknown",
      "map_caption_lines": [
        "Unknown"
      ],
      "capacity_notes": [],
      "capacity_unknown_reason": "No DC planning power capacity disclosed in frozen sources; non-demand equipment/area measures do not fill this gap.",
      "has_planning_or_campus_capacity_disclosure": false,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/SOUTH-AWS-DIDCOTN",
      "citation_text": "ElecTrace (2026-10-14). Amazon Didcot North campus. UK Data Centre Planning Database, version 1.0.0, project record SOUTH-AWS-DIDCOTN. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/SOUTH-AWS-DIDCOTN"
    },
    {
      "project_id": "FINAL-SOUTH-AWS",
      "name": "Amazon Web Services Plot 3 Maylands Avenue",
      "nation": "England",
      "stage_detail": "planned_or_early_development",
      "stage_label": "Planned or early development",
      "latitude": 51.753663,
      "longitude": -0.437421,
      "coordinate_precision": "postcode_centroid",
      "coordinate_note": "Public postcode centroid. Not a surveyed site boundary.",
      "coordinate_source": "https://api.postcodes.io/postcodes/HP2%204FQ",
      "location_label": "HP2 4FQ",
      "source_urls": [
        "https://aienergyintelligence.co.uk/uk-data-centre-tracker/aws-maylands-avenue-hemel",
        "https://docs.planning.org.uk/20260206/142/TA103VFOMQQ00/8ks12cyrdxt8irfc.pdf"
      ],
      "source_dates": [
        "2026-01-28"
      ],
      "map_id": 2,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "",
        "unspecified": "",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [],
        "unspecified": [],
        "mva": []
      },
      "capacity_display": "Unknown",
      "map_caption_lines": [
        "Unknown"
      ],
      "capacity_notes": [],
      "capacity_unknown_reason": "No DC planning power capacity disclosed in frozen sources; non-demand equipment/area measures do not fill this gap.",
      "has_planning_or_campus_capacity_disclosure": false,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/FINAL-SOUTH-AWS",
      "citation_text": "ElecTrace (2026-10-14). Amazon Web Services Plot 3 Maylands Avenue. UK Data Centre Planning Database, version 1.0.0, project record FINAL-SOUTH-AWS. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/FINAL-SOUTH-AWS"
    },
    {
      "project_id": "V8-ARK-HILFIELD",
      "name": "Ark Hilfield Park / former Mercure Hotel",
      "nation": "England",
      "stage_detail": "planning_application_or_reserved_matters",
      "stage_label": "Planning application or reserved matters",
      "latitude": 51.6403,
      "longitude": -0.29693,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Source project V8-ARK-HILFIELD: Ark Hilfield Park / former Mercure Hotel. The retained developer location URL is https://www.ark-d-c.com/locations/elstree and the project identity refers to Hertsmere planning application 25/1781/FUL; use Elstree locality only, not either grid-supply substation. Locality representative point only; no site coordinate inferred.",
      "coordinate_source": "https://www.geonames.org/2650047/",
      "location_label": "Elstree",
      "source_urls": [
        "https://www.ark-d-c.com/locations/elstree",
        "https://docs.planning.org.uk/20251224/199/T7AXMLIFJD600/l5s385vvdh5mj4s4.pdf"
      ],
      "source_dates": [
        "2025-12-08"
      ],
      "map_id": 3,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "",
        "unspecified": "",
        "mva": "250 MVA campus; not summed circuit ratings"
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [],
        "unspecified": [],
        "mva": [
          {
            "category": "mva",
            "value": 250.0,
            "unit": "MVA",
            "raw_boundary": "apparent_power_for_DC",
            "qualification": "source_reported",
            "scope": "campus_multiple_builds",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "V8-ARK-HILFIELD",
            "source_url": "https://www.ark-d-c.com/locations/elstree",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          }
        ]
      },
      "capacity_display": "MVA: 250 MVA campus; not summed circuit ratings",
      "map_caption_lines": [
        "MVA: 250 MVA campus; not summed circuit ratings"
      ],
      "capacity_notes": [],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/V8-ARK-HILFIELD",
      "citation_text": "ElecTrace (2026-10-14). Ark Hilfield Park / former Mercure Hotel. UK Data Centre Planning Database, version 1.0.0, project record V8-ARK-HILFIELD. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/V8-ARK-HILFIELD"
    },
    {
      "project_id": "V36-LONGCROSS-JCA",
      "name": "Ark Longcross Park - completed LP1 and planned campus compute",
      "nation": "England",
      "stage_detail": "operating_with_expansion",
      "stage_label": "Operating site with expansion plans",
      "latitude": 51.3817,
      "longitude": -0.5923,
      "coordinate_precision": "postcode_centroid",
      "coordinate_note": "Public postcode centroid. Not a surveyed site boundary.",
      "coordinate_source": "https://api.postcodes.io/postcodes/KT16%200EE",
      "location_label": "KT16 0EE",
      "source_urls": [
        "https://jca.co.uk/jca-and-ark-data-centres-unveil-longcross-park-a-groundbreaking-ai-ready-campus-in-surrey/"
      ],
      "source_dates": [
        "2026-02-11"
      ],
      "map_id": 4,
      "capacity_columns": {
        "it": "55 MW campus compute incl. completed LP1; remainder unknown",
        "facility": "",
        "grid": "",
        "unspecified": "",
        "mva": ""
      },
      "capacity_categories": {
        "it": [
          {
            "category": "it",
            "value": 55.0,
            "unit": "MW",
            "raw_boundary": "compute_capacity",
            "qualification": "terminal campus figure includes LP1; not whole-site import capacity",
            "scope": "Whole Longcross Park campus on completion of three planned data centres",
            "stage": "source-stage unresolved",
            "claim_context": "Campus or historical figure; remaining development capacity unresolved",
            "source_record_id": "V36-LONGCROSS-JCA",
            "source_url": "https://jca.co.uk/jca-and-ark-data-centres-unveil-longcross-park-a-groundbreaking-ai-ready-campus-in-surrey/",
            "source_date": "2026-02-11",
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "facility": [],
        "grid": [],
        "unspecified": [],
        "mva": []
      },
      "capacity_display": "IT: 55 MW campus compute incl. completed LP1; remainder unknown",
      "map_caption_lines": [
        "IT: 55 MW campus compute incl. completed LP1; remainder",
        "  unknown"
      ],
      "capacity_notes": [
        "IT audit decision: unresolved; completed lp1 plus future campus.",
        "Includes existing facilities or conditional expansion: disclosed campus capacity is not remaining new-build demand; no subtraction is inferred."
      ],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [
        {
          "category": "it",
          "value": 19.0,
          "unit": "MW",
          "raw_boundary": "it_load",
          "qualification": "completed phase; not a whole-campus input or additional future grid load",
          "scope": "LP1, first of three planned Longcross Park data centres",
          "stage": "source-stage unresolved",
          "claim_context": "Existing or completed capacity; not additional planned demand",
          "source_record_id": "V36-LONGCROSS-JCA",
          "source_url": "https://jca.co.uk/jca-and-ark-data-centres-unveil-longcross-park-a-groundbreaking-ai-ready-campus-in-surrey/",
          "source_date": "2026-02-11",
          "preferred_for_display": false,
          "additive": false
        }
      ],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/V36-LONGCROSS-JCA",
      "citation_text": "ElecTrace (2026-10-14). Ark Longcross Park - completed LP1 and planned campus compute. UK Data Centre Planning Database, version 1.0.0, project record V36-LONGCROSS-JCA. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/V36-LONGCROSS-JCA"
    },
    {
      "project_id": "UK5-AVONMOUTH",
      "name": "Avonmouth Data Centre",
      "nation": "England",
      "stage_detail": "planning_application_or_reserved_matters",
      "stage_label": "Planning application or reserved matters",
      "latitude": 51.531708,
      "longitude": -2.672589,
      "coordinate_precision": "postcode_centroid",
      "coordinate_note": "Public postcode centroid. Not a surveyed site boundary.",
      "coordinate_source": "https://api.postcodes.io/postcodes/BS11%200YU",
      "location_label": "BS11 0YU",
      "source_urls": [
        "https://www.gov.uk/government/publications/bs11-0yu-avonmouth-data-centre-limited-environmental-permit-application-advertisement-eprzp3925mpa001/bs11-0yu-avonmouth-data-centre-limited-environmental-permit-application-advertisement-eprzp3925mpa001",
        "https://viridor.co.uk/news-and-insights/viridor-energy-rivington-energy-partnership/"
      ],
      "source_dates": [
        "2026-06-10"
      ],
      "map_id": 5,
      "capacity_columns": {
        "it": "40 MW",
        "facility": "",
        "grid": "",
        "unspecified": "",
        "mva": ""
      },
      "capacity_categories": {
        "it": [
          {
            "category": "it",
            "value": 40.0,
            "unit": "MW",
            "raw_boundary": "it_compute_capacity",
            "qualification": "Developer explicitly says compute capacity; directly supplied EfW electricity does not prove 40 MW new grid import.",
            "scope": "Avonmouth campus",
            "stage": "planning_submitted",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "PORT11-AVONMOUTH",
            "source_url": "https://viridor.co.uk/news-and-insights/viridor-energy-rivington-energy-partnership/",
            "source_date": "2026-06-10",
            "preferred_for_display": true,
            "additive": false
          }
        ],
        "facility": [],
        "grid": [],
        "unspecified": [],
        "mva": []
      },
      "capacity_display": "IT: 40 MW",
      "map_caption_lines": [
        "IT: 40 MW"
      ],
      "capacity_notes": [
        "IT capacity qualification: planning submitted."
      ],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/UK5-AVONMOUTH",
      "citation_text": "ElecTrace (2026-10-14). Avonmouth Data Centre. UK Data Centre Planning Database, version 1.0.0, project record UK5-AVONMOUTH. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UK5-AVONMOUTH"
    },
    {
      "project_id": "V9-CLEARSTONE-LUTON",
      "name": "Clearstone Luton data centre campus",
      "nation": "England",
      "stage_detail": "planning_permission_reported",
      "stage_label": "Planning permission reported",
      "latitude": 51.87967,
      "longitude": -0.41748,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Exact settlement name in source location/project name: Clearstone Luton data centre campus",
      "coordinate_source": "https://www.geonames.org/2643339/",
      "location_label": "Luton",
      "source_urls": [
        "https://www.clearstoneenergy.com/project/luton-data-centre-campus/"
      ],
      "source_dates": [],
      "map_id": 6,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "300 MW (connection date unconfirmed)",
        "unspecified": "",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [
          {
            "category": "grid",
            "value": 300.0,
            "unit": "MW",
            "raw_boundary": "network_connection_capacity",
            "qualification": "source_reported",
            "scope": "campus",
            "stage": "connection_date_unconfirmed",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "V9-CLEARSTONE-LUTON",
            "source_url": "https://www.clearstoneenergy.com/project/luton-data-centre-campus/",
            "source_date": null,
            "preferred_for_display": true,
            "additive": false
          }
        ],
        "unspecified": [],
        "mva": []
      },
      "capacity_display": "Grid: 300 MW (connection date unconfirmed)",
      "map_caption_lines": [
        "Grid: 300 MW (connection date unconfirmed)"
      ],
      "capacity_notes": [],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/V9-CLEARSTONE-LUTON",
      "citation_text": "ElecTrace (2026-10-14). Clearstone Luton data centre campus. UK Data Centre Planning Database, version 1.0.0, project record V9-CLEARSTONE-LUTON. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/V9-CLEARSTONE-LUTON"
    },
    {
      "project_id": "UKS010",
      "name": "CloudHQ LHR Didcot campus",
      "nation": "England",
      "stage_detail": "planning_permission_reported",
      "stage_label": "Planning permission reported",
      "latitude": 51.60928,
      "longitude": -1.24214,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Exact settlement name in source location/project name: Didcot, Oxfordshire",
      "coordinate_source": "https://www.geonames.org/2651269/",
      "location_label": "Didcot",
      "source_urls": [
        "https://cloudhq.com/campus/lhr-campus-2/"
      ],
      "source_dates": [],
      "map_id": 7,
      "capacity_columns": {
        "it": "101 MW catalogue; operating/planned split unresolved",
        "facility": "",
        "grid": "",
        "unspecified": "",
        "mva": ""
      },
      "capacity_categories": {
        "it": [
          {
            "category": "it",
            "value": 101.0,
            "unit": "MW",
            "raw_boundary": "IT",
            "qualification": null,
            "scope": "CloudHQ LHR Didcot campus",
            "stage": "source-stage unresolved",
            "claim_context": "Campus or historical figure; remaining development capacity unresolved",
            "source_record_id": "UKS010",
            "source_url": "https://cloudhq.com/campus/lhr-campus-2/",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          },
          {
            "category": "it",
            "value": 101.0,
            "unit": "MW",
            "raw_boundary": "IT_load",
            "qualification": null,
            "scope": "CloudHQ LHR Didcot campus",
            "stage": "source-stage unresolved",
            "claim_context": "Campus or historical figure; remaining development capacity unresolved",
            "source_record_id": "UKS010",
            "source_url": "https://cloudhq.com/campus/lhr-campus-2/",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "facility": [],
        "grid": [],
        "unspecified": [],
        "mva": []
      },
      "capacity_display": "IT: 101 MW catalogue; operating/planned split unresolved",
      "map_caption_lines": [
        "IT: 101 MW catalogue; operating/planned split unresolved"
      ],
      "capacity_notes": [
        "IT audit decision: unresolved; catalogue phase status unclear."
      ],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/UKS010",
      "citation_text": "ElecTrace (2026-10-14). CloudHQ LHR Didcot campus. UK Data Centre Planning Database, version 1.0.0, project record UKS010. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UKS010"
    },
    {
      "project_id": "UKS006",
      "name": "Colt Hayes Digital Park expansion London6/7/8",
      "nation": "England",
      "stage_detail": "planning_permission_reported",
      "stage_label": "Planning permission reported",
      "latitude": 51.51579,
      "longitude": -0.4234,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Source project UKS006: Hayes Bridge and Heathrow Interchange, London. Hayes Bridge/Heathrow area in west London; not Hayes in Bromley. Locality representative point only; no site coordinate inferred.",
      "coordinate_source": "https://www.geonames.org/2647261/",
      "location_label": "Hayes",
      "source_urls": [
        "https://www.coltdatacentres.net/en-GB/press-releases/data-centres/2025/11/colt-dcs-london-hayes-expansion",
        "https://aienergyintelligence.co.uk/uk-data-centre-tracker/hayes-bridge-heathrow-interchange-data-centre-campus",
        "https://eclipsepower.co.uk/eclipse-power-networks-secures-strategic-grid-infrastructure-contract-for-hyperscale-data-centre-campus/",
        "https://consult.environment-agency.gov.uk/psc/ub4-0sl-colt-data-centre-services-uk-limited-a001/supporting_documents/Application%20Bespoke%20%20Nontechnical%20Summary%2028032024.pdf",
        "https://www.catella.com/en/uk/asset-management/references/hayes-data-centre"
      ],
      "source_dates": [
        "2025-11-04",
        "2024-03"
      ],
      "map_id": 8,
      "capacity_columns": {
        "it": "97 MW expansion",
        "facility": "",
        "grid": "250 MW whole-campus connection, reported",
        "unspecified": "",
        "mva": "40 MVA earlier parcel supply; not additive"
      },
      "capacity_categories": {
        "it": [
          {
            "category": "it",
            "value": 97.0,
            "unit": "MW",
            "raw_boundary": "IT_increment",
            "qualification": null,
            "scope": "Colt Hayes Digital Park expansion London6/7/8",
            "stage": "committee_resolution_expansion",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "UKS006",
            "source_url": "https://www.coltdatacentres.net/en-GB/press-releases/data-centres/2025/11/colt-dcs-london-hayes-expansion",
            "source_date": "2025-11-04",
            "preferred_for_display": true,
            "additive": false
          },
          {
            "category": "it",
            "value": 97.0,
            "unit": "MW",
            "raw_boundary": "IT_load",
            "qualification": null,
            "scope": "Colt Hayes Digital Park expansion London6/7/8",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "UKS006",
            "source_url": "https://www.coltdatacentres.net/en-GB/press-releases/data-centres/2025/11/colt-dcs-london-hayes-expansion",
            "source_date": "2025-11-04",
            "preferred_for_display": false,
            "additive": false
          },
          {
            "category": "it",
            "value": 175.0,
            "unit": "MW",
            "raw_boundary": "it_load",
            "qualification": "reported",
            "scope": "Same campus in this source; conflicts with alternative 160 MW campus reporting, retain version",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "ENG9-COLT-HAYES-250",
            "source_url": "https://eclipsepower.co.uk/eclipse-power-networks-secures-strategic-grid-infrastructure-contract-for-hyperscale-data-centre-campus/",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "facility": [],
        "grid": [
          {
            "category": "grid",
            "value": 250.0,
            "unit": "MW",
            "raw_boundary": "grid_connection_for_data_centre",
            "qualification": "reported",
            "scope": "Campus total 100 MW Uxbridge Moor +150 MW North Hyde; do not sum again with components or earlier IT claim",
            "stage": "source_claimed_connection",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "ENG9-COLT-HAYES-250",
            "source_url": "https://eclipsepower.co.uk/eclipse-power-networks-secures-strategic-grid-infrastructure-contract-for-hyperscale-data-centre-campus/",
            "source_date": null,
            "preferred_for_display": true,
            "additive": false
          }
        ],
        "unspecified": [],
        "mva": [
          {
            "category": "mva",
            "value": 40.0,
            "unit": "MVA",
            "raw_boundary": "procured_apparent_power_supply",
            "qualification": "Historical procurement before sale to operator; MVA cannot be added as MW or assumed incremental current grid import.",
            "scope": "combined Hayes original and adjacent industrial parcels",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "PORT11-CATELLA-HAYES",
            "source_url": "https://www.catella.com/en/uk/asset-management/references/hayes-data-centre",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          }
        ]
      },
      "capacity_display": "IT: 97 MW expansion; Grid: 250 MW whole-campus connection, reported; MVA: 40 MVA earlier parcel supply; not additive",
      "map_caption_lines": [
        "IT: 97 MW expansion",
        "Grid: 250 MW whole-campus connection, reported",
        "MVA: 40 MVA earlier parcel supply; not additive"
      ],
      "capacity_notes": [
        "IT capacity qualification: committee resolution expansion.",
        "97 MW is the selected IT expansion. Alternative 175 MW IT campus and 160 MW reporting are different scope/version claims, not extra capacity."
      ],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/UKS006",
      "citation_text": "ElecTrace (2026-10-14). Colt Hayes Digital Park expansion London6/7/8. UK Data Centre Planning Database, version 1.0.0, project record UKS006. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UKS006"
    },
    {
      "project_id": "UKN027",
      "name": "Conesby Data Centre Campus",
      "nation": "England",
      "stage_detail": "pre_application_or_consultation",
      "stage_label": "Pre-application or consultation",
      "latitude": 53.57905,
      "longitude": -0.65437,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Exact settlement name in source location/project name: Normanby Road, Scunthorpe, North Lincolnshire",
      "coordinate_source": "https://www.geonames.org/2638324/",
      "location_label": "Scunthorpe",
      "source_urls": [
        "https://rivingtonenergy.co.uk/data-centres/"
      ],
      "source_dates": [],
      "map_id": 9,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "",
        "unspecified": "",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [],
        "unspecified": [],
        "mva": []
      },
      "capacity_display": "Unknown",
      "map_caption_lines": [
        "Unknown"
      ],
      "capacity_notes": [],
      "capacity_unknown_reason": "No DC planning power capacity disclosed in frozen sources; non-demand equipment/area measures do not fill this gap.",
      "has_planning_or_campus_capacity_disclosure": false,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/UKN027",
      "citation_text": "ElecTrace (2026-10-14). Conesby Data Centre Campus. UK Data Centre Planning Database, version 1.0.0, project record UKN027. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UKN027"
    },
    {
      "project_id": "MID-COTTAM",
      "name": "Cottam data centre campus",
      "nation": "England",
      "stage_detail": "planned_or_early_development",
      "stage_label": "Planned or early development",
      "latitude": 53.3,
      "longitude": -0.76667,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Source project MID-COTTAM: Cottam, Nottinghamshire. Cottam in Nottinghamshire, not Cottam near Preston. Locality representative point only; no site coordinate inferred.",
      "coordinate_source": "https://www.geonames.org/2652270/",
      "location_label": "Cottam",
      "source_urls": [
        "https://www.edfenergy.com/media-centre/holtec-international-edf-uk-and-tritax-announce-plans-develop-cottam-site-data-centres-and",
        "https://www.tritaxbigbox.co.uk/media/rv3heyp3/holtec-edf-tritax-cottam-smr-300-press-release-final.pdf",
        "https://www.neso.energy/document/386386/download"
      ],
      "source_dates": [
        "2025-09-14",
        "2025-09-15",
        "2026-09-03"
      ],
      "map_id": 10,
      "capacity_columns": {
        "it": "",
        "facility": "up to 1,000 MW conditional DC demand",
        "grid": "",
        "unspecified": "",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [
          {
            "category": "facility",
            "value": 1000.0,
            "unit": "MW",
            "raw_boundary": "planned_facility_electrical_demand",
            "qualification": "up_to_planned; target connection from early2030s, before SMR; no signed import agreement in source",
            "scope": "Cottam site data-centre demand, up to1GW across two500MW phases; phase MW are components not additive to total",
            "stage": "conditional_vision",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "V38-COTTAM-EDF-DEMAND",
            "source_url": "https://www.neso.energy/document/386386/download",
            "source_date": "2026-09-03",
            "preferred_for_display": true,
            "additive": false
          }
        ],
        "grid": [],
        "unspecified": [
          {
            "category": "unspecified",
            "value": 1000.0,
            "unit": "MW",
            "raw_boundary": "unspecified",
            "qualification": null,
            "scope": "Cottam data centre campus",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "MID-COTTAM",
            "source_url": "https://www.edfenergy.com/media-centre/holtec-international-edf-uk-and-tritax-announce-plans-develop-cottam-site-data-centres-and",
            "source_date": "2025-09-14",
            "preferred_for_display": false,
            "additive": false
          },
          {
            "category": "unspecified",
            "value": 1000.0,
            "unit": "MW",
            "raw_boundary": "unspecified",
            "qualification": null,
            "scope": "site_or_phase_as_named",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "MID-COTTAM",
            "source_url": "https://www.edfenergy.com/media-centre/holtec-international-edf-uk-and-tritax-announce-plans-develop-cottam-site-data-centres-and",
            "source_date": "2025-09-14",
            "preferred_for_display": false,
            "additive": false
          },
          {
            "category": "unspecified",
            "value": 1000.0,
            "unit": "MW",
            "raw_boundary": "data_centre_capacity_unspecified",
            "qualification": "reported",
            "scope": "Cottam data centre project targeted by end of decade",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "ELEC13-COTTAM-PRIMARY",
            "source_url": "https://www.tritaxbigbox.co.uk/media/rv3heyp3/holtec-edf-tritax-cottam-smr-300-press-release-final.pdf",
            "source_date": "2025-09-15",
            "preferred_for_display": false,
            "additive": false
          },
          {
            "category": "unspecified",
            "value": 500.0,
            "unit": "MW",
            "raw_boundary": "planned_electrical_demand_phase_component",
            "qualification": null,
            "scope": "unspecified",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "V38-COTTAM-EDF-DEMAND",
            "source_url": "https://www.neso.energy/document/386386/download",
            "source_date": "2026-09-03",
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "mva": []
      },
      "capacity_display": "Facility: up to 1,000 MW conditional DC demand",
      "map_caption_lines": [
        "Facility: up to 1,000 MW conditional DC demand"
      ],
      "capacity_notes": [
        "Facility boundary: planned_facility_electrical_demand; conditional_vision."
      ],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/MID-COTTAM",
      "citation_text": "ElecTrace (2026-10-14). Cottam data centre campus. UK Data Centre Planning Database, version 1.0.0, project record MID-COTTAM. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/MID-COTTAM"
    },
    {
      "project_id": "UKS003",
      "name": "Culham mission-led AI data centre",
      "nation": "England",
      "stage_detail": "planned_or_early_development",
      "stage_label": "Planned or early development",
      "latitude": 51.65184,
      "longitude": -1.26609,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Source project UKS003: Culham, Oxfordshire. Culham, Oxfordshire. Locality representative point only; no site coordinate inferred.",
      "coordinate_source": "https://www.geonames.org/2651758/",
      "location_label": "Culham",
      "source_urls": [
        "https://culham.org.uk/invest-at-culham-campus/expression-of-interest/"
      ],
      "source_dates": [
        "2025-08-12"
      ],
      "map_id": 11,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "100 MW (available supply)",
        "unspecified": "",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [
          {
            "category": "grid",
            "value": 100.0,
            "unit": "MW",
            "raw_boundary": "available_steady_state_power",
            "qualification": null,
            "scope": "Culham mission-led AI data centre",
            "stage": "available_supply",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "UKS003",
            "source_url": "https://culham.org.uk/invest-at-culham-campus/expression-of-interest/",
            "source_date": "2025-08-12",
            "preferred_for_display": true,
            "additive": false
          }
        ],
        "unspecified": [],
        "mva": []
      },
      "capacity_display": "Grid: 100 MW (available supply)",
      "map_caption_lines": [
        "Grid: 100 MW (available supply)"
      ],
      "capacity_notes": [],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/UKS003",
      "citation_text": "ElecTrace (2026-10-14). Culham mission-led AI data centre. UK Data Centre Planning Database, version 1.0.0, project record UKS003. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UKS003"
    },
    {
      "project_id": "UK-R3-NORTH-003",
      "name": "Deep Green Bradford, Listerhills Road",
      "nation": "England",
      "stage_detail": "planning_permission_reported",
      "stage_label": "Planning permission reported",
      "latitude": 53.79391,
      "longitude": -1.75206,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Exact settlement name in source location/project name: Deep Green Bradford, Listerhills Road",
      "coordinate_source": "https://www.geonames.org/2654993/",
      "location_label": "Bradford",
      "source_urls": [
        "https://aienergyintelligence.co.uk/uk-data-centre-tracker/deep-green-bradford",
        "https://deepgreen.energy/news/deep-green-welcomes-planning-approval-for-pioneering-bradford-heat--reuse-data-centre"
      ],
      "source_dates": [
        "2026-05-14"
      ],
      "map_id": 12,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "",
        "unspecified": "5.6 MW (basis unresolved)",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [],
        "unspecified": [
          {
            "category": "unspecified",
            "value": 5.6,
            "unit": "MW",
            "raw_boundary": "definition_not_published",
            "qualification": null,
            "scope": "unspecified",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "AEIUK-012",
            "source_url": "https://aienergyintelligence.co.uk/uk-data-centre-tracker/deep-green-bradford",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          },
          {
            "category": "unspecified",
            "value": 5.6,
            "unit": "MW",
            "raw_boundary": "data_centre_capacity_unspecified",
            "qualification": null,
            "scope": "Deep Green Bradford, Listerhills Road",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "UK-R3-NORTH-003",
            "source_url": "https://deepgreen.energy/news/deep-green-welcomes-planning-approval-for-pioneering-bradford-heat--reuse-data-centre",
            "source_date": "2026-05-14",
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "mva": []
      },
      "capacity_display": "Reported (basis unknown): 5.6 MW (basis unresolved)",
      "map_caption_lines": [
        "Reported (basis unknown): 5.6 MW (basis unresolved)"
      ],
      "capacity_notes": [],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/UK-R3-NORTH-003",
      "citation_text": "ElecTrace (2026-10-14). Deep Green Bradford, Listerhills Road. UK Data Centre Planning Database, version 1.0.0, project record UK-R3-NORTH-003. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UK-R3-NORTH-003"
    },
    {
      "project_id": "UK5-DEVON",
      "name": "Devon Data Campus / Valeon",
      "nation": "England",
      "stage_detail": "planned_or_early_development",
      "stage_label": "Planned or early development",
      "latitude": 51.00644,
      "longitude": -4.11245,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Source project UK5-DEVON: Alverdiscott, North Devon. Alverdiscott, North Devon. Locality representative point only; no site coordinate inferred.",
      "coordinate_source": "https://www.geonames.org/13281471/",
      "location_label": "Alverdiscott",
      "source_urls": [
        "https://xlinks.co/devon-data-campus/",
        "https://www.cpredevon.org.uk/massive-ai-datacentre-and-battery-system-proposed-in-devon/",
        "https://www.devondatacampus.com/",
        "https://www.neso.energy/foi-26-097-inquiry-regarding-grid-capacity-and-alverdiscott-north-devon-15gw-data-centre-proposal-29-july-2026"
      ],
      "source_dates": [
        "2026-06-26",
        "2026-07-29"
      ],
      "map_id": 13,
      "capacity_columns": {
        "it": "up to 1,500 MW compute",
        "facility": "1,800 MW peak, meeting report",
        "grid": "",
        "unspecified": "",
        "mva": ""
      },
      "capacity_categories": {
        "it": [
          {
            "category": "it",
            "value": 1500.0,
            "unit": "MW",
            "raw_boundary": "it_compute_capacity",
            "qualification": "Up to1.5GW AI-optimised compute; not whole-site electrical import",
            "scope": "Valeon data centre",
            "stage": "proposed_submission_status_conflict",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "DEV12-PRIMARY",
            "source_url": "https://xlinks.co/devon-data-campus/",
            "source_date": null,
            "preferred_for_display": true,
            "additive": false
          },
          {
            "category": "it",
            "value": 1500.0,
            "unit": "MW",
            "raw_boundary": "compute",
            "qualification": null,
            "scope": "Devon Data Campus / Valeon",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "UK5-DEVON",
            "source_url": "https://xlinks.co/devon-data-campus/",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          },
          {
            "category": "it",
            "value": 1500.0,
            "unit": "MW",
            "raw_boundary": "compute",
            "qualification": null,
            "scope": "ultimate_campus",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "UK5-DEVON",
            "source_url": "https://xlinks.co/devon-data-campus/",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "facility": [
          {
            "category": "facility",
            "value": 1800.0,
            "unit": "MW",
            "raw_boundary": "reported_peak_site_electrical_load",
            "qualification": "CPRE meeting account item5 distinguishes IT1.5GW and peaksite1.8GW; item2 separately identifies1800MW BESS. Not engineering primary or verified grid agreement.",
            "scope": "data centre",
            "stage": "reported_meeting_account",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "DEV12-PEAK-REPORT",
            "source_url": "https://www.cpredevon.org.uk/massive-ai-datacentre-and-battery-system-proposed-in-devon/",
            "source_date": "2026-06-26",
            "preferred_for_display": true,
            "additive": false
          }
        ],
        "grid": [],
        "unspecified": [
          {
            "category": "unspecified",
            "value": 1.5,
            "unit": "GW",
            "raw_boundary": "unknown",
            "qualification": "Figure in an FOI requester's question; the NESO response does not confirm the capacity or a grid connection. Not an independent capacity confirmation.",
            "scope": "unspecified",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "CYCLE38-DEVON-NESO-FOI-NO-CAPACITY-CONFIRMATION",
            "source_url": "https://www.neso.energy/foi-26-097-inquiry-regarding-grid-capacity-and-alverdiscott-north-devon-15gw-data-centre-proposal-29-july-2026",
            "source_date": "2026-07-29",
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "mva": []
      },
      "capacity_display": "IT: up to 1,500 MW compute; Facility: 1,800 MW peak, meeting report",
      "map_caption_lines": [
        "IT: up to 1,500 MW compute",
        "Facility: 1,800 MW peak, meeting report"
      ],
      "capacity_notes": [
        "IT capacity qualification: proposed submission status conflict.",
        "Facility boundary: reported_peak_site_electrical_load; reported_meeting_account."
      ],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/UK5-DEVON",
      "citation_text": "ElecTrace (2026-10-14). Devon Data Campus / Valeon. UK Data Centre Planning Database, version 1.0.0, project record UK5-DEVON. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UK5-DEVON"
    },
    {
      "project_id": "SOUTH-REDHILL",
      "name": "Digital Realty Redhill units1-2 redevelopment",
      "nation": "England",
      "stage_detail": "planning_permission_reported",
      "stage_label": "Planning permission reported",
      "latitude": 51.24048,
      "longitude": -0.17044,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Exact settlement name in source location/project name: 1 and2 St Annes Boulevard, Redhill",
      "coordinate_source": "https://www.geonames.org/2639545/",
      "location_label": "Redhill",
      "source_urls": [
        "https://reigate-banstead.moderngov.co.uk/mgAi.aspx?ID=14738"
      ],
      "source_dates": [
        "2026-04-22"
      ],
      "map_id": 14,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "",
        "unspecified": "",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [],
        "unspecified": [],
        "mva": []
      },
      "capacity_display": "Unknown",
      "map_caption_lines": [
        "Unknown"
      ],
      "capacity_notes": [],
      "capacity_unknown_reason": "No DC planning power capacity disclosed in frozen sources; non-demand equipment/area measures do not fill this gap.",
      "has_planning_or_campus_capacity_disclosure": false,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/SOUTH-REDHILL",
      "citation_text": "ElecTrace (2026-10-14). Digital Realty Redhill units1-2 redevelopment. UK Data Centre Planning Database, version 1.0.0, project record SOUTH-REDHILL. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/SOUTH-REDHILL"
    },
    {
      "project_id": "GRID7-DRAX",
      "name": "Drax Power Station data centre options",
      "nation": "England",
      "stage_detail": "planned_or_early_development",
      "stage_label": "Planned or early development",
      "latitude": 53.7284,
      "longitude": -0.98087,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Source project GRID7-DRAX: Drax Power Station data centre options. Project name identifies Drax; use Drax village locality, not a power-station grid node. Locality representative point only; no site coordinate inferred.",
      "coordinate_source": "https://www.geonames.org/2651010/",
      "location_label": "Drax",
      "source_urls": [
        "https://www.drax.com/wp-content/uploads/2026/03/Drax-FYR-2025-Analyst-Presentation.pdf",
        "https://www.neso.energy/document/373996/download",
        "https://www.investegate.co.uk/announcement/rns/drax-group--drx/2026-half-year-results/9694684"
      ],
      "source_dates": [
        "2026-02-26",
        "2026-07-30"
      ],
      "map_id": 15,
      "capacity_columns": {
        "it": "",
        "facility": "~100 MW grid-fed / ~500 MW behind-meter conditional options (Jul 2026)",
        "grid": "",
        "unspecified": "",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [
          {
            "category": "facility",
            "value": 1200.0,
            "unit": "MW",
            "raw_boundary": "data_centre_power_option_terminal",
            "qualification": "Approximate historical February 2026 power option; conditional and not an agreed import capacity. Later July reporting restated only the 100 MW and 500 MW options.",
            "scope": "terminal option equals three phases; not additive to phases or established import contract",
            "stage": "Historical February 2026 conditional vision",
            "claim_context": "Historical power option; do not combine with July 2026 options or add phases to the terminal figure",
            "source_record_id": "GRID7-DRAX",
            "source_url": "https://www.drax.com/wp-content/uploads/2026/03/Drax-FYR-2025-Analyst-Presentation.pdf",
            "source_date": "2026-02-26",
            "preferred_for_display": false,
            "additive": false
          },
          {
            "category": "facility",
            "value": 100.0,
            "unit": "MW",
            "raw_boundary": "front_of_meter_data_centre_power_option",
            "qualification": "Approximate historical February 2026 power option; conditional and not an agreed import capacity. Later July reporting restated only the 100 MW and 500 MW options.",
            "scope": "phase 1 from 2027; approximate; subject to consents and investment case",
            "stage": "Historical February 2026 conditional vision",
            "claim_context": "Historical power option; do not combine with July 2026 options or add phases to the terminal figure",
            "source_record_id": "GRID7-DRAX",
            "source_url": "https://www.drax.com/wp-content/uploads/2026/03/Drax-FYR-2025-Analyst-Presentation.pdf",
            "source_date": "2026-02-26",
            "preferred_for_display": false,
            "additive": false
          },
          {
            "category": "facility",
            "value": 500.0,
            "unit": "MW",
            "raw_boundary": "behind_meter_data_centre_power_option",
            "qualification": "Approximate historical February 2026 power option; conditional and not an agreed import capacity. Later July reporting restated only the 100 MW and 500 MW options.",
            "scope": "phase 2 2028-2031; government agreement required",
            "stage": "Historical February 2026 conditional vision",
            "claim_context": "Historical power option; do not combine with July 2026 options or add phases to the terminal figure",
            "source_record_id": "GRID7-DRAX",
            "source_url": "https://www.drax.com/wp-content/uploads/2026/03/Drax-FYR-2025-Analyst-Presentation.pdf",
            "source_date": "2026-02-26",
            "preferred_for_display": false,
            "additive": false
          },
          {
            "category": "facility",
            "value": 600.0,
            "unit": "MW",
            "raw_boundary": "behind_meter_data_centre_power_option",
            "qualification": "Approximate historical February 2026 power option; conditional and not an agreed import capacity. Later July reporting restated only the 100 MW and 500 MW options.",
            "scope": "phase 3 from 2031",
            "stage": "Historical February 2026 conditional vision",
            "claim_context": "Historical power option; do not combine with July 2026 options or add phases to the terminal figure",
            "source_record_id": "GRID7-DRAX",
            "source_url": "https://www.drax.com/wp-content/uploads/2026/03/Drax-FYR-2025-Analyst-Presentation.pdf",
            "source_date": "2026-02-26",
            "preferred_for_display": false,
            "additive": false
          },
          {
            "category": "facility",
            "value": 100.0,
            "unit": "MW",
            "raw_boundary": "front_of_meter_data_centre_power_option",
            "qualification": "Approximate conditional power option restated in July 2026; not a confirmed full-facility design or committed grid import.",
            "scope": "July 2026 grid-fed option",
            "stage": "Conditional planning preparation",
            "claim_context": "Latest restated conditional power option; duplicate source observations are not additive",
            "source_record_id": "V39-DRAX-SELFPOWER-PHASE-UPDATE",
            "source_url": "https://www.investegate.co.uk/announcement/rns/drax-group--drx/2026-half-year-results/9694684",
            "source_date": "2026-07-30",
            "preferred_for_display": false,
            "additive": false
          },
          {
            "category": "facility",
            "value": 500.0,
            "unit": "MW",
            "raw_boundary": "behind_meter_data_centre_power_option",
            "qualification": "Approximate conditional power option restated in July 2026; not a confirmed full-facility design or committed grid import.",
            "scope": "July 2026 behind-meter option",
            "stage": "Conditional 2027-2031 power option",
            "claim_context": "Latest restated conditional power option; duplicate source observations are not additive",
            "source_record_id": "V39-DRAX-SELFPOWER-PHASE-UPDATE",
            "source_url": "https://www.investegate.co.uk/announcement/rns/drax-group--drx/2026-half-year-results/9694684",
            "source_date": "2026-07-30",
            "preferred_for_display": false,
            "additive": false
          },
          {
            "category": "facility",
            "value": 600.0,
            "unit": "MW",
            "raw_boundary": "behind_meter_data_centre_power_option",
            "qualification": "Historical February 2026 figure retained as context in the frozen review; the linked July update does not restate this figure. Omission does not establish cancellation.",
            "scope": "unspecified",
            "stage": "Historical February vision; not restated in July 2026",
            "claim_context": "Historical carryover, not a July capacity confirmation; do not add versions",
            "source_record_id": "V39-DRAX-SELFPOWER-PHASE-UPDATE",
            "source_url": "https://www.investegate.co.uk/announcement/rns/drax-group--drx/2026-half-year-results/9694684",
            "source_date": "2026-07-30",
            "preferred_for_display": false,
            "additive": false
          },
          {
            "category": "facility",
            "value": 1200.0,
            "unit": "MW",
            "raw_boundary": "data_centre_power_option_terminal",
            "qualification": "Historical February 2026 figure retained as context in the frozen review; the linked July update does not restate this figure. Omission does not establish cancellation.",
            "scope": "unspecified",
            "stage": "Historical February vision; not restated in July 2026",
            "claim_context": "Historical carryover, not a July capacity confirmation; do not add versions",
            "source_record_id": "V39-DRAX-SELFPOWER-PHASE-UPDATE",
            "source_url": "https://www.investegate.co.uk/announcement/rns/drax-group--drx/2026-half-year-results/9694684",
            "source_date": "2026-07-30",
            "preferred_for_display": false,
            "additive": false
          },
          {
            "category": "facility",
            "value": 100,
            "unit": "MW",
            "raw_boundary": "front_of_meter_data_centre_power_option",
            "qualification": "Approximate conditional power option restated in July 2026; not a confirmed full-facility design or committed grid import.",
            "scope": "July 2026 grid-fed option",
            "stage": "Conditional planning preparation",
            "claim_context": "Latest restated conditional power option; duplicate source observations are not additive",
            "source_record_id": "V39-DRAX-SELFPOWER-PHASE-UPDATE",
            "source_url": "https://www.investegate.co.uk/announcement/rns/drax-group--drx/2026-half-year-results/9694684",
            "source_date": "2026-07-30",
            "preferred_for_display": true,
            "additive": false
          },
          {
            "category": "facility",
            "value": 500,
            "unit": "MW",
            "raw_boundary": "behind_meter_data_centre_power_option",
            "qualification": "Approximate conditional power option restated in July 2026; not a confirmed full-facility design or committed grid import.",
            "scope": "July 2026 behind-meter option",
            "stage": "Conditional 2027-2031 power option",
            "claim_context": "Latest restated conditional power option; duplicate source observations are not additive",
            "source_record_id": "V39-DRAX-SELFPOWER-PHASE-UPDATE",
            "source_url": "https://www.investegate.co.uk/announcement/rns/drax-group--drx/2026-half-year-results/9694684",
            "source_date": "2026-07-30",
            "preferred_for_display": true,
            "additive": false
          }
        ],
        "grid": [],
        "unspecified": [
          {
            "category": "unspecified",
            "value": 1200.0,
            "unit": "MW",
            "raw_boundary": "ea_associated_installed_capacity",
            "qualification": "MW unit from NESO explanatory FOI, not added to original XLSX raw field",
            "scope": "Customer/DNO supplied queue-item capacity, possibly stage or technology element; not certified maximum import",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "CYCLE25-EA-000272",
            "source_url": "https://www.neso.energy/document/373996/download",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "mva": []
      },
      "capacity_display": "Power options: ~100 MW grid-fed / ~500 MW behind-meter conditional options (Jul 2026)",
      "map_caption_lines": [
        "Power options: ~100 MW grid-fed / ~500 MW behind-meter",
        "  conditional options (Jul 2026)"
      ],
      "capacity_notes": [
        "Facility boundary: data_centre_power_option_terminal; conditional_vision.",
        "Historical February 2026 terminal option is 1,200 MW (100/500/600 phase components). July restated only 100 and 500 MW; omitted later expansion is not proven cancelled. Do not add versions."
      ],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/GRID7-DRAX",
      "citation_text": "ElecTrace (2026-10-14). Drax Power Station data centre options. UK Data Centre Planning Database, version 1.0.0, project record GRID7-DRAX. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/GRID7-DRAX"
    },
    {
      "project_id": "UKS002",
      "name": "East Havering Data Centre Campus",
      "nation": "England",
      "stage_detail": "pre_application_or_consultation",
      "stage_label": "Pre-application or consultation",
      "latitude": 51.54196,
      "longitude": 0.30016,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Source project UKS002: North Ockendon, Havering. North Ockendon, Havering, not South Ockendon. Locality representative point only; no site coordinate inferred.",
      "coordinate_source": "https://www.geonames.org/2641291/",
      "location_label": "North Ockendon",
      "source_urls": [
        "https://democracy.havering.gov.uk/documents/s66179/London%20Data%20Freeport%20Project%20Detail.pdf",
        "https://democracy.havering.gov.uk/documents/s83041/APPENDIX%209%20-%20Environmental%20Statement%20Non-Technical%20Summary.pdf",
        "https://drive.google.com/file/d/1BB9FBJKs6SpP1J8ldXDv2QnwmBpMmi-v/view",
        "https://drive.google.com/file/d/1EuD-Z7wQQTYVSItKCe8YHQUpjc0VZ8Ke/view"
      ],
      "source_dates": [
        "2022-11",
        "2026-01",
        "2026-01-14"
      ],
      "map_id": 16,
      "capacity_columns": {
        "it": "490 MW maximum",
        "facility": "",
        "grid": "",
        "unspecified": "",
        "mva": "600 MVA terminal; includes 160 MVA initial"
      },
      "capacity_categories": {
        "it": [
          {
            "category": "it",
            "value": 490.0,
            "unit": "MW",
            "raw_boundary": "IT_capacity",
            "qualification": "Feasibility-stage source design; not consented operating capacity or whole-facility/grid demand",
            "scope": "Maximum IT system demand across17DCbuildings in illustrativeLDO scheme",
            "stage": "illustrative_LDO_design",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "V40-HAVERING-IT490",
            "source_url": "https://drive.google.com/file/d/1EuD-Z7wQQTYVSItKCe8YHQUpjc0VZ8Ke/view",
            "source_date": "2026-01-14",
            "preferred_for_display": true,
            "additive": false
          }
        ],
        "facility": [],
        "grid": [
          {
            "category": "grid",
            "value": 650.0,
            "unit": "MW",
            "raw_boundary": "power_supply_claim",
            "qualification": null,
            "scope": "East Havering Data Centre Campus",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "UKS002",
            "source_url": "https://democracy.havering.gov.uk/documents/s66179/London%20Data%20Freeport%20Project%20Detail.pdf",
            "source_date": "2022-11",
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "unspecified": [],
        "mva": [
          {
            "category": "mva",
            "value": 160.0,
            "unit": "MVA",
            "raw_boundary": "grid_import_contract_initial_apparent_power",
            "qualification": "minimum",
            "scope": "Minimum by31December2029 fromWarley; partof600terminal",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "PLAN11-HAVERING-CONTRACT",
            "source_url": "https://democracy.havering.gov.uk/documents/s83041/APPENDIX%209%20-%20Environmental%20Statement%20Non-Technical%20Summary.pdf",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          },
          {
            "category": "mva",
            "value": 600.0,
            "unit": "MVA",
            "raw_boundary": "grid_import_contract_terminal_apparent_power",
            "qualification": "reported",
            "scope": "Entire contracted supply by31December2033; not160+600",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "PLAN11-HAVERING-CONTRACT",
            "source_url": "https://democracy.havering.gov.uk/documents/s83041/APPENDIX%209%20-%20Environmental%20Statement%20Non-Technical%20Summary.pdf",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          },
          {
            "category": "mva",
            "value": 600.0,
            "unit": "MVA",
            "raw_boundary": "grid_connection_apparent_power",
            "qualification": "Original contractual capacity; revised technical and commercial variation not all executed in January2026 report",
            "scope": "Terminal supply to EastHavering LDO; contains initial160MVA, not a separate600MW load",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "V40-HAVERING-POWER-CONTRACT",
            "source_url": "https://drive.google.com/file/d/1BB9FBJKs6SpP1J8ldXDv2QnwmBpMmi-v/view",
            "source_date": "2026-01",
            "preferred_for_display": false,
            "additive": false
          },
          {
            "category": "mva",
            "value": 160.0,
            "unit": "MVA",
            "raw_boundary": "initial_grid_connection_phase_apparent_power",
            "qualification": "UKPN1August2025 letter; subject to upstream works/agreements; no conversion toMW",
            "scope": "2029initialphase included within600MVA terminal",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "V40-HAVERING-POWER-CONTRACT",
            "source_url": "https://drive.google.com/file/d/1BB9FBJKs6SpP1J8ldXDv2QnwmBpMmi-v/view",
            "source_date": "2026-01",
            "preferred_for_display": false,
            "additive": false
          }
        ]
      },
      "capacity_display": "IT: 490 MW maximum; MVA: 600 MVA terminal; includes 160 MVA initial",
      "map_caption_lines": [
        "IT: 490 MW maximum",
        "MVA: 600 MVA terminal; includes 160 MVA initial"
      ],
      "capacity_notes": [
        "IT capacity qualification: illustrative LDO design."
      ],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/UKS002",
      "citation_text": "ElecTrace (2026-10-14). East Havering Data Centre Campus. UK Data Centre Planning Database, version 1.0.0, project record UKS002. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UKS002"
    },
    {
      "project_id": "UKS001",
      "name": "Ebbsfleet AI Data Centre Campus",
      "nation": "England",
      "stage_detail": "pre_application_or_consultation",
      "stage_label": "Pre-application or consultation",
      "latitude": 51.44657,
      "longitude": 0.21423,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Exact settlement name in source location/project name: Dartford, Kent",
      "coordinate_source": "https://www.geonames.org/2651500/",
      "location_label": "Dartford",
      "source_urls": [
        "https://www.clearstoneenergy.com/ebbsfleet-ai-data-centre-campus/",
        "https://ebbsfleetdc.co.uk/faqs/"
      ],
      "source_dates": [
        "2026-07-01"
      ],
      "map_id": 17,
      "capacity_columns": {
        "it": "",
        "facility": "up to 300 MW (design disclosure)",
        "grid": "",
        "unspecified": "",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [
          {
            "category": "facility",
            "value": 300.0,
            "unit": "MW",
            "raw_boundary": "facility_electrical_capacity",
            "qualification": "up_to",
            "scope": "Designed up to300MW electrical; replaces earlier unspecified boundary, not additional campus",
            "stage": "design",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "ENG10-EBBSFLEET-ELECTRIC",
            "source_url": "https://ebbsfleetdc.co.uk/faqs/",
            "source_date": null,
            "preferred_for_display": true,
            "additive": false
          }
        ],
        "grid": [],
        "unspecified": [
          {
            "category": "unspecified",
            "value": 300.0,
            "unit": "MW",
            "raw_boundary": "campus_unspecified",
            "qualification": null,
            "scope": "Ebbsfleet AI Data Centre Campus",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "UKS001",
            "source_url": "https://www.clearstoneenergy.com/ebbsfleet-ai-data-centre-campus/",
            "source_date": "2026-07-01",
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "mva": []
      },
      "capacity_display": "Facility: up to 300 MW (design disclosure)",
      "map_caption_lines": [
        "Facility: up to 300 MW (design disclosure)"
      ],
      "capacity_notes": [
        "Facility boundary: facility_electrical_capacity; design."
      ],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/UKS001",
      "citation_text": "ElecTrace (2026-10-14). Ebbsfleet AI Data Centre Campus. UK Data Centre Planning Database, version 1.0.0, project record UKS001. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UKS001"
    },
    {
      "project_id": "UKN025",
      "name": "Elsham Tech Park",
      "nation": "England",
      "stage_detail": "planning_application_or_reserved_matters",
      "stage_label": "Planning application or reserved matters",
      "latitude": 53.59762,
      "longitude": -0.44151,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Source project UKN025: Elsham Wolds, North Lincolnshire. Elsham, North Lincolnshire; Elsham Wolds project parcel is not geocoded. Locality representative point only; no site coordinate inferred.",
      "coordinate_source": "https://www.geonames.org/2650057/",
      "location_label": "Elsham",
      "source_urls": [
        "https://m.northlincs.gov.uk/pl_open?PK_PARAM=2309095&REF_NUM_PARAM=PA%2F2025%2F643&token=f5c384b00fc4211a88fcbb5157837a38f2c725dd"
      ],
      "source_dates": [],
      "map_id": 18,
      "capacity_columns": {
        "it": "",
        "facility": "1,000 MW (design disclosure)",
        "grid": "",
        "unspecified": "",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [
          {
            "category": "facility",
            "value": 1000.0,
            "unit": "MW",
            "raw_boundary": "whole_site_electrical_demand",
            "qualification": "exact",
            "scope": "Carbon Footprint Statement p7 includes data halls, ancillary buildings and all onsite infrastructure; p19 supplied through UKNationalGrid; full ramp-up scenario",
            "stage": "design",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "BOUND10-ELSHAM",
            "source_url": "https://m.northlincs.gov.uk/pl_open?PK_PARAM=2309095&REF_NUM_PARAM=PA%2F2025%2F643&token=f5c384b00fc4211a88fcbb5157837a38f2c725dd",
            "source_date": null,
            "preferred_for_display": true,
            "additive": false
          },
          {
            "category": "facility",
            "value": 1000.0,
            "unit": "MW",
            "raw_boundary": "campus_electricity_power",
            "qualification": null,
            "scope": "Elsham Tech Park",
            "stage": "design",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "UKN025",
            "source_url": "https://m.northlincs.gov.uk/pl_open?PK_PARAM=2309095&REF_NUM_PARAM=PA%2F2025%2F643&token=f5c384b00fc4211a88fcbb5157837a38f2c725dd",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "grid": [],
        "unspecified": [],
        "mva": []
      },
      "capacity_display": "Facility: 1,000 MW (design disclosure)",
      "map_caption_lines": [
        "Facility: 1,000 MW (design disclosure)"
      ],
      "capacity_notes": [
        "Facility boundary: whole_site_electrical_demand; design."
      ],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/UKN025",
      "citation_text": "ElecTrace (2026-10-14). Elsham Tech Park. UK Data Centre Planning Database, version 1.0.0, project record UKN025. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UKN025"
    },
    {
      "project_id": "MID-ERIN",
      "name": "Era4 Erin Landfill modular data centre",
      "nation": "England",
      "stage_detail": "planning_application_or_reserved_matters",
      "stage_label": "Planning application or reserved matters",
      "latitude": 53.242622,
      "longitude": -1.328903,
      "coordinate_precision": "postcode_centroid",
      "coordinate_note": "Public postcode centroid. Not a surveyed site boundary.",
      "coordinate_source": "https://api.postcodes.io/postcodes/S44%205HS",
      "location_label": "S44 5HS",
      "source_urls": [
        "https://docs.planning.org.uk/20251104/83/T4KRKYEPI9900/prvay7p0i83nev81.pdf"
      ],
      "source_dates": [
        "2025-10"
      ],
      "map_id": 19,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "",
        "unspecified": "",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [],
        "unspecified": [],
        "mva": []
      },
      "capacity_display": "Unknown",
      "map_caption_lines": [
        "Unknown"
      ],
      "capacity_notes": [],
      "capacity_unknown_reason": "No DC planning power capacity disclosed in frozen sources; non-demand equipment/area measures do not fill this gap.",
      "has_planning_or_campus_capacity_disclosure": false,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/MID-ERIN",
      "citation_text": "ElecTrace (2026-10-14). Era4 Erin Landfill modular data centre. UK Data Centre Planning Database, version 1.0.0, project record MID-ERIN. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/MID-ERIN"
    },
    {
      "project_id": "UKN030",
      "name": "Ferrybridge C Zone A Data Centre",
      "nation": "England",
      "stage_detail": "planning_permission_reported",
      "stage_label": "Planning permission reported",
      "latitude": 53.70778,
      "longitude": -1.25639,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Source project UKN030: Former Coal Yard, Ferrybridge C, Knottingley. Source specifies Ferrybridge C coal yard, Knottingley; locality proxy only. Locality representative point only; no site coordinate inferred.",
      "coordinate_source": "https://www.geonames.org/2645102/",
      "location_label": "Knottingley",
      "source_urls": [
        "https://nsip-documents.planninginspectorate.gov.uk/published-documents/EN0110011-000016-260107%20Ferrybridge%20DCO%20-%20Adequacy%20of%20Consultation%20Milestone_%20PINS%20Issue_Tracked%20Changes.pdf"
      ],
      "source_dates": [
        "2026-01-07"
      ],
      "map_id": 20,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "",
        "unspecified": "",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [],
        "unspecified": [],
        "mva": []
      },
      "capacity_display": "Unknown",
      "map_caption_lines": [
        "Unknown"
      ],
      "capacity_notes": [],
      "capacity_unknown_reason": "No DC planning power capacity disclosed in frozen sources; non-demand equipment/area measures do not fill this gap.",
      "has_planning_or_campus_capacity_disclosure": false,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/UKN030",
      "citation_text": "ElecTrace (2026-10-14). Ferrybridge C Zone A Data Centre. UK Data Centre Planning Database, version 1.0.0, project record UKN030. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UKN030"
    },
    {
      "project_id": "UK-R3-NORTH-002",
      "name": "Former White's Reclamation Site data centre, Eccles",
      "nation": "England",
      "stage_detail": "planning_permission_reported",
      "stage_label": "Planning permission reported",
      "latitude": 53.475015,
      "longitude": -2.375095,
      "coordinate_precision": "postcode_centroid",
      "coordinate_note": "Public postcode centroid. Not a surveyed site boundary.",
      "coordinate_source": "https://api.postcodes.io/postcodes/M30%207LW",
      "location_label": "M30 7LW",
      "source_urls": [
        "https://aienergyintelligence.co.uk/uk-data-centre-tracker/whites-reclamation-eccles-data-centre",
        "https://www.ttsp.com/about/news-and-awards/salford-data-centre-planning-approval/"
      ],
      "source_dates": [],
      "map_id": 21,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "",
        "unspecified": "",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [],
        "unspecified": [],
        "mva": []
      },
      "capacity_display": "Unknown",
      "map_caption_lines": [
        "Unknown"
      ],
      "capacity_notes": [],
      "capacity_unknown_reason": "No DC planning power capacity disclosed in frozen sources; non-demand equipment/area measures do not fill this gap.",
      "has_planning_or_campus_capacity_disclosure": false,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/UK-R3-NORTH-002",
      "citation_text": "ElecTrace (2026-10-14). Former White's Reclamation Site data centre, Eccles. UK Data Centre Planning Database, version 1.0.0, project record UK-R3-NORTH-002. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UK-R3-NORTH-002"
    },
    {
      "project_id": "BENCH-FOLLOW-GLOBALSWITCH",
      "name": "Global Switch London (campus grouping)",
      "nation": "England",
      "stage_detail": "operating_with_expansion",
      "stage_label": "Operating site with expansion plans",
      "latitude": 51.50805,
      "longitude": 0.01694,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Exact settlement name in source location/project name: Docklands, London",
      "coordinate_source": "https://www.geonames.org/13264924/",
      "location_label": "Docklands",
      "source_urls": [
        "https://aienergyintelligence.co.uk/uk-data-centre-tracker/global-switch-london",
        "https://www.globalswitch.com/data-centres/london/"
      ],
      "source_dates": [],
      "map_id": 22,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "",
        "unspecified": "87 / 18 / 70 MW by London building; mixed stock/expansion; basis unresolved",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [],
        "unspecified": [
          {
            "category": "unspecified",
            "value": 87.0,
            "unit": "MW",
            "raw_boundary": "definition_not_published",
            "qualification": null,
            "scope": "Global Switch London",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "AEIUK-017",
            "source_url": "https://aienergyintelligence.co.uk/uk-data-centre-tracker/global-switch-london",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          },
          {
            "category": "unspecified",
            "value": 87.0,
            "unit": "MW",
            "raw_boundary": "operator_MW_unspecified",
            "qualification": null,
            "scope": "London East",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "BENCH-FOLLOW-GLOBALSWITCH",
            "source_url": "https://www.globalswitch.com/data-centres/london/",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          },
          {
            "category": "unspecified",
            "value": 18.0,
            "unit": "MW",
            "raw_boundary": "operator_MW_unspecified",
            "qualification": null,
            "scope": "London North",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "BENCH-FOLLOW-GLOBALSWITCH",
            "source_url": "https://www.globalswitch.com/data-centres/london/",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          },
          {
            "category": "unspecified",
            "value": 70.0,
            "unit": "MW",
            "raw_boundary": "operator_MW_unspecified",
            "qualification": null,
            "scope": "London South",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "BENCH-FOLLOW-GLOBALSWITCH",
            "source_url": "https://www.globalswitch.com/data-centres/london/",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "mva": []
      },
      "capacity_display": "Reported (basis unknown): 87 / 18 / 70 MW by London building; mixed stock/expansion; basis unresolved",
      "map_caption_lines": [
        "Reported (basis unknown): 87 / 18 / 70 MW by London",
        "  building; mixed stock/expansion; basis unresolved"
      ],
      "capacity_notes": [
        "Includes existing facilities or conditional expansion: disclosed campus capacity is not remaining new-build demand; no subtraction is inferred."
      ],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/BENCH-FOLLOW-GLOBALSWITCH",
      "citation_text": "ElecTrace (2026-10-14). Global Switch London (campus grouping). UK Data Centre Planning Database, version 1.0.0, project record BENCH-FOLLOW-GLOBALSWITCH. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/BENCH-FOLLOW-GLOBALSWITCH"
    },
    {
      "project_id": "UKS005",
      "name": "Graven Hill D1 data centre",
      "nation": "England",
      "stage_detail": "planning_application_or_reserved_matters",
      "stage_label": "Planning application or reserved matters",
      "latitude": 51.89998,
      "longitude": -1.15357,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Source project UKS005: Bicester, Oxfordshire. Bicester, Oxfordshire; Graven Hill building parcel is not geocoded. Locality representative point only; no site coordinate inferred.",
      "coordinate_source": "https://www.geonames.org/2655729/",
      "location_label": "Bicester",
      "source_urls": [
        "https://planningregister.cherwell.gov.uk/Document/Download?fileName=D1+Site+Graven+Hill+Reserved+Matters+Statement+December+2025+Final+PDF.pdf&imageId=7&isPlan=False&module=PLA&planId=2405224&recordNumber=165246",
        "https://planningregister.cherwell.gov.uk/Document/Download?fileName=Graven+Hill+Energy+Statement_Renewables+Feasibility+Report_Final.pdf&imageId=9&isPlan=False&module=PLA&planId=2405226&recordNumber=165246"
      ],
      "source_dates": [
        "2025-12",
        "2025-11-14"
      ],
      "map_id": 23,
      "capacity_columns": {
        "it": "290 MW",
        "facility": "435 MW utility design",
        "grid": "",
        "unspecified": "",
        "mva": ""
      },
      "capacity_categories": {
        "it": [
          {
            "category": "it",
            "value": 290.0,
            "unit": "MW",
            "raw_boundary": "IT_load",
            "qualification": null,
            "scope": "Graven Hill D1 data centre",
            "stage": "reserved_matters_submission",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "UKS005",
            "source_url": "https://planningregister.cherwell.gov.uk/Document/Download?fileName=D1+Site+Graven+Hill+Reserved+Matters+Statement+December+2025+Final+PDF.pdf&imageId=7&isPlan=False&module=PLA&planId=2405224&recordNumber=165246",
            "source_date": "2025-12",
            "preferred_for_display": true,
            "additive": false
          }
        ],
        "facility": [
          {
            "category": "facility",
            "value": 435.0,
            "unit": "MW",
            "raw_boundary": "utility_capacity_design",
            "qualification": null,
            "scope": "Graven Hill D1 data centre",
            "stage": "design",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "UKS005",
            "source_url": "https://planningregister.cherwell.gov.uk/Document/Download?fileName=D1+Site+Graven+Hill+Reserved+Matters+Statement+December+2025+Final+PDF.pdf&imageId=7&isPlan=False&module=PLA&planId=2405224&recordNumber=165246",
            "source_date": "2025-12",
            "preferred_for_display": true,
            "additive": false
          }
        ],
        "grid": [],
        "unspecified": [],
        "mva": []
      },
      "capacity_display": "IT: 290 MW; Facility: 435 MW utility design",
      "map_caption_lines": [
        "IT: 290 MW",
        "Facility: 435 MW utility design"
      ],
      "capacity_notes": [
        "IT capacity qualification: reserved matters submission.",
        "Facility boundary: utility_capacity_design; design."
      ],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/UKS005",
      "citation_text": "ElecTrace (2026-10-14). Graven Hill D1 data centre. UK Data Centre Planning Database, version 1.0.0, project record UKS005. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UKS005"
    },
    {
      "project_id": "UKS012",
      "name": "Green Mountain LON-East Romford",
      "nation": "England",
      "stage_detail": "operating_with_expansion",
      "stage_label": "Operating site with expansion plans",
      "latitude": 51.57515,
      "longitude": 0.18582,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "The source specifically says Romford, East London, but the matcher preferred East London and placed the marker well west of Romford. Corrected to the source-named locality; not a site coordinate.",
      "coordinate_source": "https://www.geonames.org/2639192/",
      "location_label": "Romford",
      "source_urls": [
        "https://greenmountain.no/green-mountain-romford-data-centre-acquisition/"
      ],
      "source_dates": [
        "2026-06-08"
      ],
      "map_id": 24,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "",
        "unspecified": "37 MW whole-campus plan incl. delivered phases",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [],
        "unspecified": [
          {
            "category": "unspecified",
            "value": 37.0,
            "unit": "MW",
            "raw_boundary": "campus_unspecified",
            "qualification": null,
            "scope": "Green Mountain LON-East Romford",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "UKS012",
            "source_url": "https://greenmountain.no/green-mountain-romford-data-centre-acquisition/",
            "source_date": "2026-06-08",
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "mva": []
      },
      "capacity_display": "Reported (basis unknown): 37 MW whole-campus plan incl. delivered phases",
      "map_caption_lines": [
        "Reported (basis unknown): 37 MW whole-campus plan incl.",
        "  delivered phases"
      ],
      "capacity_notes": [
        "Includes existing facilities or conditional expansion: disclosed campus capacity is not remaining new-build demand; no subtraction is inferred."
      ],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/UKS012",
      "citation_text": "ElecTrace (2026-10-14). Green Mountain LON-East Romford. UK Data Centre Planning Database, version 1.0.0, project record UKS012. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UKS012"
    },
    {
      "project_id": "SOUTH-ABBOTS",
      "name": "Greystoke Abbots Langley",
      "nation": "England",
      "stage_detail": "planning_permission_reported",
      "stage_label": "Planning permission reported",
      "latitude": 51.715666,
      "longitude": -0.412847,
      "coordinate_precision": "postcode_centroid",
      "coordinate_note": "Public postcode centroid. Not a surveyed site boundary.",
      "coordinate_source": "https://api.postcodes.io/postcodes/WD5%200QE",
      "location_label": "WD5 0QE",
      "source_urls": [
        "https://www.slough.gov.uk/downloads/file/4874/appendix-b-7-land-off-bedmond-road"
      ],
      "source_dates": [
        "2025-05-12"
      ],
      "map_id": 25,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "",
        "unspecified": "96 MW (basis unresolved)",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [],
        "unspecified": [
          {
            "category": "unspecified",
            "value": 96.0,
            "unit": "MW",
            "raw_boundary": "unknown_dc_capacity",
            "qualification": null,
            "scope": "two_buildings",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "SOUTH-ABBOTS",
            "source_url": "https://www.slough.gov.uk/downloads/file/4874/appendix-b-7-land-off-bedmond-road",
            "source_date": "2025-05-12",
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "mva": []
      },
      "capacity_display": "Reported (basis unknown): 96 MW (basis unresolved)",
      "map_caption_lines": [
        "Reported (basis unknown): 96 MW (basis unresolved)"
      ],
      "capacity_notes": [],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/SOUTH-ABBOTS",
      "citation_text": "ElecTrace (2026-10-14). Greystoke Abbots Langley. UK Data Centre Planning Database, version 1.0.0, project record SOUTH-ABBOTS. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/SOUTH-ABBOTS"
    },
    {
      "project_id": "UK5-HASLEMERE",
      "name": "Haslemere Heathrow Estate",
      "nation": "England",
      "stage_detail": "planning_permission_reported",
      "stage_label": "Planning permission reported",
      "latitude": 51.473081,
      "longitude": -0.407617,
      "coordinate_precision": "postcode_centroid",
      "coordinate_note": "Public postcode centroid. Not a surveyed site boundary.",
      "coordinate_source": "https://api.postcodes.io/postcodes/TW4%206NF",
      "location_label": "TW4 6NF",
      "source_urls": [
        "https://democraticservices.hounslow.gov.uk/mgAi.aspx?ID=141617"
      ],
      "source_dates": [],
      "map_id": 26,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "",
        "unspecified": "",
        "mva": "80 MVA grid offer"
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [],
        "unspecified": [],
        "mva": [
          {
            "category": "mva",
            "value": 80.0,
            "unit": "MVA",
            "raw_boundary": "grid_offer",
            "qualification": null,
            "scope": "proposed_site",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "UK5-HASLEMERE",
            "source_url": "https://democraticservices.hounslow.gov.uk/mgAi.aspx?ID=141617",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          }
        ]
      },
      "capacity_display": "MVA: 80 MVA grid offer",
      "map_caption_lines": [
        "MVA: 80 MVA grid offer"
      ],
      "capacity_notes": [],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/UK5-HASLEMERE",
      "citation_text": "ElecTrace (2026-10-14). Haslemere Heathrow Estate. UK Data Centre Planning Database, version 1.0.0, project record UK5-HASLEMERE. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UK5-HASLEMERE"
    },
    {
      "project_id": "UKN026",
      "name": "Humber Tech Park",
      "nation": "England",
      "stage_detail": "planning_permission_reported",
      "stage_label": "Planning permission reported",
      "latitude": 53.56667,
      "longitude": -0.23333,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Source project UKN026: South Killingholme, North Lincolnshire. Source states South Killingholme, North Lincolnshire. Locality representative point only; no site coordinate inferred.",
      "coordinate_source": "https://www.geonames.org/2637392/",
      "location_label": "South Killingholme",
      "source_urls": [
        "https://www.greystoke.co.uk/",
        "https://cdn.threerivers.gov.uk/files/2024/09/2c448430-797f-11ef-b96a-372ee9bee63e-I32-North%20Lincolnshire%20Council%20Planning%20Application%20ref%20PA-2024-584%C3%94%C3%87%C3%B4%20Planning%20Statement.pdf",
        "https://www.greystoke.co.uk/ai-growth-zone",
        "https://www.northernlincolnshireaigrowthzone.com/"
      ],
      "source_dates": [
        "2024-05-01"
      ],
      "map_id": 27,
      "capacity_columns": {
        "it": "up to 384 MW whole campus (2024 design)",
        "facility": "",
        "grid": "",
        "unspecified": "",
        "mva": ""
      },
      "capacity_categories": {
        "it": [
          {
            "category": "it",
            "value": 384.0,
            "unit": "MW",
            "raw_boundary": "IT_capacity",
            "qualification": "up to; outlineplanningdesign; notwholefacilityorgridload",
            "scope": "Wholecampusup-to3buildings,309000sqm",
            "stage": "outline_planning_design_at_2024-05-01_source_date",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "V42-HUMBER-PLANNING-IT384",
            "source_url": "https://cdn.threerivers.gov.uk/files/2024/09/2c448430-797f-11ef-b96a-372ee9bee63e-I32-North%20Lincolnshire%20Council%20Planning%20Application%20ref%20PA-2024-584%C3%94%C3%87%C3%B4%20Planning%20Statement.pdf",
            "source_date": "2024-05-01",
            "preferred_for_display": true,
            "additive": false
          },
          {
            "category": "it",
            "value": 384.0,
            "unit": "MW",
            "raw_boundary": "IT_load",
            "qualification": null,
            "scope": "Humber Tech Park",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "UKN026",
            "source_url": "https://www.greystoke.co.uk/",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "facility": [],
        "grid": [],
        "unspecified": [
          {
            "category": "unspecified",
            "value": 450.0,
            "unit": "MW",
            "raw_boundary": "programme_capacity_unspecified",
            "qualification": null,
            "scope": "unspecified",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "UKN026",
            "source_url": "https://www.northernlincolnshireaigrowthzone.com/",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "mva": []
      },
      "capacity_display": "IT: up to 384 MW whole campus (2024 design)",
      "map_caption_lines": [
        "IT: up to 384 MW whole campus (2024 design)"
      ],
      "capacity_notes": [
        "IT capacity qualification: outline planning design at 2024-05-01 source date."
      ],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/UKN026",
      "citation_text": "ElecTrace (2026-10-14). Humber Tech Park. UK Data Centre Planning Database, version 1.0.0, project record UKN026. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UKN026"
    },
    {
      "project_id": "SOUTH-IRON-LON3",
      "name": "Iron Mountain LON-3",
      "nation": "England",
      "stage_detail": "delivery_target_unconfirmed",
      "stage_label": "Reported delivery target (unconfirmed)",
      "latitude": 51.521689,
      "longitude": -0.623103,
      "coordinate_precision": "postcode_centroid",
      "coordinate_note": "postcode centroid; not surveyed building location",
      "coordinate_source": "https://api.postcodes.io/postcodes",
      "location_label": "111 Buckingham Avenue, Slough",
      "source_urls": [
        "https://www.ironmountain.com/en-gb/data-centers/locations/emea/london/lon-3",
        "https://www.slough.gov.uk/downloads/file/4878/appendix-c-1-data-centres-permitted"
      ],
      "source_dates": [],
      "map_id": 28,
      "capacity_columns": {
        "it": "25 MW; target opening 2026, status unverified",
        "facility": "",
        "grid": "",
        "unspecified": "",
        "mva": ""
      },
      "capacity_categories": {
        "it": [
          {
            "category": "it",
            "value": 25.0,
            "unit": "MW",
            "raw_boundary": "IT_load",
            "qualification": null,
            "scope": "building",
            "stage": "target_opening_2026_actual_status_unverified",
            "claim_context": "Conditional or historical IT figure",
            "source_record_id": "SOUTH-IRON-LON3",
            "source_url": "https://www.ironmountain.com/en-gb/data-centers/locations/emea/london/lon-3",
            "source_date": null,
            "preferred_for_display": true,
            "additive": false
          }
        ],
        "facility": [],
        "grid": [],
        "unspecified": [],
        "mva": []
      },
      "capacity_display": "IT: 25 MW; target opening 2026, status unverified",
      "map_caption_lines": [
        "IT: 25 MW; target opening 2026, status unverified"
      ],
      "capacity_notes": [
        "IT capacity qualification: target opening 2026 actual status unverified."
      ],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/SOUTH-IRON-LON3",
      "citation_text": "ElecTrace (2026-10-14). Iron Mountain LON-3. UK Data Centre Planning Database, version 1.0.0, project record SOUTH-IRON-LON3. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/SOUTH-IRON-LON3"
    },
    {
      "project_id": "BENCH-FOLLOW-KAO-PLOTF",
      "name": "Kao Data Harlow Plot F (KLON-07 and KLON-08)",
      "nation": "England",
      "stage_detail": "planned_or_early_development",
      "stage_label": "Planned or early development",
      "latitude": 51.77655,
      "longitude": 0.11158,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Exact settlement name in source location/project name: Plot F, Maypole Boulevard, Harlow Innovation Park",
      "coordinate_source": "https://www.geonames.org/2647461/",
      "location_label": "Harlow",
      "source_urls": [
        "https://aienergyintelligence.co.uk/uk-data-centre-tracker/kao-data-harlow-plot-f",
        "https://docs.planning.org.uk/20250613/164/SXSVCPHX01700/xz38443r1l0z2jp9.pdf"
      ],
      "source_dates": [
        "2025-03"
      ],
      "map_id": 29,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "",
        "unspecified": "",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [],
        "unspecified": [],
        "mva": []
      },
      "capacity_display": "Unknown",
      "map_caption_lines": [
        "Unknown"
      ],
      "capacity_notes": [],
      "capacity_unknown_reason": "No DC planning power capacity disclosed in frozen sources; non-demand equipment/area measures do not fill this gap.",
      "has_planning_or_campus_capacity_disclosure": false,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/BENCH-FOLLOW-KAO-PLOTF",
      "citation_text": "ElecTrace (2026-10-14). Kao Data Harlow Plot F (KLON-07 and KLON-08). UK Data Centre Planning Database, version 1.0.0, project record BENCH-FOLLOW-KAO-PLOTF. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/BENCH-FOLLOW-KAO-PLOTF"
    },
    {
      "project_id": "UKN028",
      "name": "Kao Data Manchester",
      "nation": "England",
      "stage_detail": "enabling_works",
      "stage_label": "Enabling works",
      "latitude": 53.40979,
      "longitude": -2.15761,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Source project UKN028: Kenwood Point, Stockport. Source specifies Kenwood Point, Stockport; use Stockport rather than broad Manchester. Locality representative point only; no site coordinate inferred.",
      "coordinate_source": "https://www.geonames.org/2636882/",
      "location_label": "Stockport",
      "source_urls": [
        "https://kaodata.com/wp-content/uploads/2026/03/Kao-Data-Why-Manchester-Whitepaper-v1.pdf",
        "https://aienergyintelligence.co.uk/uk-data-centre-tracker/kao-data-stockport",
        "https://kaodata.com/discover/news/response-to-youtube-video/",
        "https://kaodata.com/locations/manchester/"
      ],
      "source_dates": [
        "2024",
        "2026-07-01"
      ],
      "map_id": 30,
      "capacity_columns": {
        "it": "40 MW historical design (conditional)",
        "facility": "",
        "grid": "",
        "unspecified": "33 MW current catalogue; basis unresolved; not additive",
        "mva": ""
      },
      "capacity_categories": {
        "it": [
          {
            "category": "it",
            "value": 40.0,
            "unit": "MW",
            "raw_boundary": "it_load",
            "qualification": "copyright2024whitepaper explicitly40MWIT; newcurrentcatalogue33MW boundaryunspecifiedcreatesversionconflict",
            "scope": "HistoricalKaoManchester/Stockportwhitepaperdesign; not confirmedcurrentterminalcapacity",
            "stage": "historical_IT_current_capacity_conflict",
            "claim_context": "Conditional or historical IT figure",
            "source_record_id": "V41-KAO-MANCHESTER-STATUS-VERSIONS",
            "source_url": "https://kaodata.com/wp-content/uploads/2026/03/Kao-Data-Why-Manchester-Whitepaper-v1.pdf",
            "source_date": "2024",
            "preferred_for_display": true,
            "additive": false
          },
          {
            "category": "it",
            "value": 40.0,
            "unit": "MW",
            "raw_boundary": "IT_load",
            "qualification": null,
            "scope": "Kao Data Manchester",
            "stage": "source-stage unresolved",
            "claim_context": "Conditional or historical IT figure",
            "source_record_id": "UKN028",
            "source_url": "https://kaodata.com/wp-content/uploads/2026/03/Kao-Data-Why-Manchester-Whitepaper-v1.pdf",
            "source_date": "2024",
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "facility": [],
        "grid": [],
        "unspecified": [
          {
            "category": "unspecified",
            "value": 33.0,
            "unit": "MW",
            "raw_boundary": "operator_capacity_unspecified",
            "qualification": "Page calls33MWUnderDevelopment, doesnotlabelITorwholefacility; noPUEconversion",
            "scope": "CurrentKMAN01locationpage, underdevelopment",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "V41-KAO-MANCHESTER-STATUS-VERSIONS",
            "source_url": "https://kaodata.com/locations/manchester/",
            "source_date": "2026-07-01",
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "mva": []
      },
      "capacity_display": "IT: 40 MW historical design (conditional); Reported (basis unknown): 33 MW current catalogue; basis unresolved; not additive",
      "map_caption_lines": [
        "IT: 40 MW historical design (conditional)",
        "Reported (basis unknown): 33 MW current catalogue; basis",
        "  unresolved; not additive"
      ],
      "capacity_notes": [
        "IT capacity qualification: historical IT current capacity conflict.",
        "40 MW historical IT and 33 MW current operator unspecified capacity conflict; no PUE conversion or addition."
      ],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/UKN028",
      "citation_text": "ElecTrace (2026-10-14). Kao Data Manchester. UK Data Centre Planning Database, version 1.0.0, project record UKN028. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UKN028"
    },
    {
      "project_id": "UK-REBUILD-NORTH-007",
      "name": "L51 Bridle Road Data Centre campus",
      "nation": "England",
      "stage_detail": "planning_permission_reported",
      "stage_label": "Planning permission reported",
      "latitude": 53.41058,
      "longitude": -2.97794,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Exact settlement name in source location/project name: 51 Bridle Road, Liverpool region",
      "coordinate_source": "https://www.geonames.org/2644210/",
      "location_label": "Liverpool",
      "source_urls": [
        "https://l51.co.uk/the-development"
      ],
      "source_dates": [],
      "map_id": 31,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "50 MW (source-claimed contract)",
        "unspecified": "",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [
          {
            "category": "grid",
            "value": 50.0,
            "unit": "MW",
            "raw_boundary": "contracted_grid_power",
            "qualification": "developer_assertion_no_contract_document",
            "scope": "site_full_buildout",
            "stage": "source_claimed_contract",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "UK-REBUILD-NORTH-007",
            "source_url": "https://l51.co.uk/the-development",
            "source_date": null,
            "preferred_for_display": true,
            "additive": false
          }
        ],
        "unspecified": [],
        "mva": []
      },
      "capacity_display": "Grid: 50 MW (source-claimed contract)",
      "map_caption_lines": [
        "Grid: 50 MW (source-claimed contract)"
      ],
      "capacity_notes": [],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/UK-REBUILD-NORTH-007",
      "citation_text": "ElecTrace (2026-10-14). L51 Bridle Road Data Centre campus. UK Data Centre Planning Database, version 1.0.0, project record UK-REBUILD-NORTH-007. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UK-REBUILD-NORTH-007"
    },
    {
      "project_id": "UK-REBUILD-NORTH-001",
      "name": "Latos Manchester East Bower Street",
      "nation": "England",
      "stage_detail": "planning_application_or_reserved_matters",
      "stage_label": "Planning application or reserved matters",
      "latitude": 53.50096,
      "longitude": -2.18049,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Source project UK-REBUILD-NORTH-001: Corner Bower Street / Ten Acres Lane, Newton Heath, Manchester. Source identifies Newton Heath, Manchester; not generic Manchester centre. Locality representative point only; no site coordinate inferred.",
      "coordinate_source": "https://www.geonames.org/2641550/",
      "location_label": "Newton Heath",
      "source_urls": [
        "https://www.latos-mcreast.co.uk/"
      ],
      "source_dates": [],
      "map_id": 32,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "",
        "unspecified": "",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [],
        "unspecified": [],
        "mva": []
      },
      "capacity_display": "Unknown",
      "map_caption_lines": [
        "Unknown"
      ],
      "capacity_notes": [],
      "capacity_unknown_reason": "No DC planning power capacity disclosed in frozen sources; non-demand equipment/area measures do not fill this gap.",
      "has_planning_or_campus_capacity_disclosure": false,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/UK-REBUILD-NORTH-001",
      "citation_text": "ElecTrace (2026-10-14). Latos Manchester East Bower Street. UK Data Centre Planning Database, version 1.0.0, project record UK-REBUILD-NORTH-001. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UK-REBUILD-NORTH-001"
    },
    {
      "project_id": "UK-REBUILD-NORTH-002",
      "name": "Latos Preston Farm Neural Edge",
      "nation": "England",
      "stage_detail": "construction_reported",
      "stage_label": "Construction reported",
      "latitude": 54.55009659496528,
      "longitude": -1.3193786197409412,
      "coordinate_precision": "source_reference_point",
      "coordinate_note": "Site reference point stated in planning geotechnical report; not a surveyed building centroid or electricity connection point.",
      "coordinate_source": "https://docs.planning.org.uk/20250619/154/SWXEASPKL8V00/dawmufu82cq0nny3.pdf",
      "location_label": "Westland Way, Preston Farm Industrial Estate, Stockton-on-Tees",
      "source_urls": [
        "https://www.latosdc.co.uk/news/built-for-the-ai-edge/"
      ],
      "source_dates": [
        "2026-03-04"
      ],
      "map_id": 33,
      "capacity_columns": {
        "it": "up to 9.5 MW",
        "facility": "",
        "grid": "",
        "unspecified": "",
        "mva": ""
      },
      "capacity_categories": {
        "it": [
          {
            "category": "it",
            "value": 9.5,
            "unit": "MW",
            "raw_boundary": "IT",
            "qualification": "up_to",
            "scope": "site_full_buildout",
            "stage": "under_construction",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "UK-REBUILD-NORTH-002",
            "source_url": "https://www.latosdc.co.uk/news/built-for-the-ai-edge/",
            "source_date": "2026-03-04",
            "preferred_for_display": true,
            "additive": false
          }
        ],
        "facility": [],
        "grid": [],
        "unspecified": [],
        "mva": []
      },
      "capacity_display": "IT: up to 9.5 MW",
      "map_caption_lines": [
        "IT: up to 9.5 MW"
      ],
      "capacity_notes": [
        "IT capacity qualification: under construction."
      ],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/UK-REBUILD-NORTH-002",
      "citation_text": "ElecTrace (2026-10-14). Latos Preston Farm Neural Edge. UK Data Centre Planning Database, version 1.0.0, project record UK-REBUILD-NORTH-002. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UK-REBUILD-NORTH-002"
    },
    {
      "project_id": "D043",
      "name": "LON6 Iver campus",
      "nation": "England",
      "stage_detail": "planned_or_early_development",
      "stage_label": "Planned or early development",
      "latitude": 51.53642,
      "longitude": -0.5179,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Source project D043: Iver Heath, Buckinghamshire. Iver Heath, Buckinghamshire; distinguish Iver village and Heathrow. Locality representative point only; no site coordinate inferred.",
      "coordinate_source": "https://www.geonames.org/7290170/",
      "location_label": "Iver Heath",
      "source_urls": [
        "https://www.datacenterdynamics.com/en/news/cyrusone-announces-plans-for-90mw-data-center-campus-in-buckinghamshire-uk/",
        "https://www.cyrusone.com/resources/press-releases/cyrusone-plans-pioneering-new-london-facility-with-sustainability-at-its-core?hs_amp=true"
      ],
      "source_dates": [
        "2025-06-13"
      ],
      "map_id": 34,
      "capacity_columns": {
        "it": "90 MW",
        "facility": "",
        "grid": "",
        "unspecified": "",
        "mva": ""
      },
      "capacity_categories": {
        "it": [
          {
            "category": "it",
            "value": 90.0,
            "unit": "MW",
            "raw_boundary": "it_load",
            "qualification": "plannedoperatorITcapacity, notMIC/wholefacility",
            "scope": "EntireLON6campus,ten9MWhallscontainedintotal",
            "stage": "planned_primary_original_verified",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "V41-CYRUSONE-LON6-PRIMARY-IT",
            "source_url": "https://www.cyrusone.com/resources/press-releases/cyrusone-plans-pioneering-new-london-facility-with-sustainability-at-its-core?hs_amp=true",
            "source_date": "2025-06-13",
            "preferred_for_display": true,
            "additive": false
          },
          {
            "category": "it",
            "value": 90.0,
            "unit": "MW",
            "raw_boundary": "IT capacity",
            "qualification": null,
            "scope": "LON6 Iver campus",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "D043",
            "source_url": "https://www.datacenterdynamics.com/en/news/cyrusone-announces-plans-for-90mw-data-center-campus-in-buckinghamshire-uk/",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          },
          {
            "category": "it",
            "value": 90.0,
            "unit": "MW",
            "raw_boundary": "IT capacity",
            "qualification": null,
            "scope": "unspecified",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "D043",
            "source_url": "https://www.datacenterdynamics.com/en/news/cyrusone-announces-plans-for-90mw-data-center-campus-in-buckinghamshire-uk/",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "facility": [],
        "grid": [],
        "unspecified": [],
        "mva": []
      },
      "capacity_display": "IT: 90 MW",
      "map_caption_lines": [
        "IT: 90 MW"
      ],
      "capacity_notes": [
        "IT capacity qualification: planned primary original verified."
      ],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/D043",
      "citation_text": "ElecTrace (2026-10-14). LON6 Iver campus. UK Data Centre Planning Database, version 1.0.0, project record D043. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/D043"
    },
    {
      "project_id": "BENCH-FOLLOW-MANOR",
      "name": "Manor Farm and land north of Wraysbury Reservoir",
      "nation": "England",
      "stage_detail": "planning_permission_reported",
      "stage_label": "Planning permission reported",
      "latitude": 51.47566,
      "longitude": -0.516391,
      "coordinate_precision": "postcode_centroid",
      "coordinate_note": "Public postcode centroid. Not a surveyed site boundary.",
      "coordinate_source": "https://api.postcodes.io/postcodes/SL3%200AA",
      "location_label": "SL3 0AA",
      "source_urls": [
        "https://aienergyintelligence.co.uk/uk-data-centre-tracker/manor-farm-poyle-road-slough",
        "https://assets.publishing.service.gov.uk/media/6a292d6edb0592d809052b94/260610_Combined_DL_IR_RtoC_-_Manor_Farm_Slough_-_3366043.pdf",
        "https://dev-tritax-big-box.euwest01.umbraco.io/media/hvxdmbzi/tritax-big-box-h1-2026-results-statement.pdf",
        "https://www.tritaxbigbox.co.uk/media/0wyenh1d/manor-farm-rns-final-_kcnc-1.pdf"
      ],
      "source_dates": [
        "2026-06-10",
        "2026-H1",
        "2025-01-21"
      ],
      "map_id": 35,
      "capacity_columns": {
        "it": "72 MW",
        "facility": "",
        "grid": "107 MW phase 1 claimed; 147 MW terminal potential",
        "unspecified": "",
        "mva": ""
      },
      "capacity_categories": {
        "it": [
          {
            "category": "it",
            "value": 72.0,
            "unit": "MW",
            "raw_boundary": "IT_capacity",
            "qualification": null,
            "scope": "Manor Farm and land north of Wraysbury Reservoir",
            "stage": "planned_permission",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "BENCH-FOLLOW-MANOR",
            "source_url": "https://assets.publishing.service.gov.uk/media/6a292d6edb0592d809052b94/260610_Combined_DL_IR_RtoC_-_Manor_Farm_Slough_-_3366043.pdf",
            "source_date": "2026-06-10",
            "preferred_for_display": true,
            "additive": false
          },
          {
            "category": "it",
            "value": 72.0,
            "unit": "MW",
            "raw_boundary": "IT_load",
            "qualification": null,
            "scope": "Manor Farm and land north of Wraysbury Reservoir",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "AEIUK-022",
            "source_url": "https://aienergyintelligence.co.uk/uk-data-centre-tracker/manor-farm-poyle-road-slough",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "facility": [],
        "grid": [
          {
            "category": "grid",
            "value": 107.0,
            "unit": "MW",
            "raw_boundary": "issuer_claimed_phase1_contracted_power",
            "qualification": null,
            "scope": "Phase1 only, pre-existing JV grid agreements; not complete147MWcampus, not executed agreement independently inspected",
            "stage": "source_claimed_phase1_contract",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "CYCLE27-MANOR-PHASE",
            "source_url": "https://www.tritaxbigbox.co.uk/media/0wyenh1d/manor-farm-rns-final-_kcnc-1.pdf",
            "source_date": "2025-01-21",
            "preferred_for_display": true,
            "additive": false
          },
          {
            "category": "grid",
            "value": 107.0,
            "unit": "MW",
            "raw_boundary": "source_claimed_power_delivery",
            "qualification": null,
            "scope": "phase1",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "SOUTH-TRITAX-MANOR",
            "source_url": "https://dev-tritax-big-box.euwest01.umbraco.io/media/hvxdmbzi/tritax-big-box-h1-2026-results-statement.pdf",
            "source_date": "2026-H1",
            "preferred_for_display": false,
            "additive": false
          },
          {
            "category": "grid",
            "value": 40.0,
            "unit": "MW",
            "raw_boundary": "source_claimed_power_delivery",
            "qualification": null,
            "scope": "phase2",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "SOUTH-TRITAX-MANOR",
            "source_url": "https://dev-tritax-big-box.euwest01.umbraco.io/media/hvxdmbzi/tritax-big-box-h1-2026-results-statement.pdf",
            "source_date": "2026-H1",
            "preferred_for_display": false,
            "additive": false
          },
          {
            "category": "grid",
            "value": 40.0,
            "unit": "MW",
            "raw_boundary": "potential_future_phase2_power",
            "qualification": null,
            "scope": "Possible second phase; not additional certified contract",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "CYCLE27-MANOR-PHASE",
            "source_url": "https://www.tritaxbigbox.co.uk/media/0wyenh1d/manor-farm-rns-final-_kcnc-1.pdf",
            "source_date": "2025-01-21",
            "preferred_for_display": false,
            "additive": false
          },
          {
            "category": "grid",
            "value": 147.0,
            "unit": "MW",
            "raw_boundary": "potential_terminal_power_delivery",
            "qualification": null,
            "scope": "Up to147MW whole-sitepotential including107+40; not added tophase1",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "CYCLE27-MANOR-PHASE",
            "source_url": "https://www.tritaxbigbox.co.uk/media/0wyenh1d/manor-farm-rns-final-_kcnc-1.pdf",
            "source_date": "2025-01-21",
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "unspecified": [],
        "mva": []
      },
      "capacity_display": "IT: 72 MW; Grid: 107 MW phase 1 claimed; 147 MW terminal potential",
      "map_caption_lines": [
        "IT: 72 MW",
        "Grid: 107 MW phase 1 claimed; 147 MW terminal potential"
      ],
      "capacity_notes": [
        "IT capacity qualification: planned permission."
      ],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/BENCH-FOLLOW-MANOR",
      "citation_text": "ElecTrace (2026-10-14). Manor Farm and land north of Wraysbury Reservoir. UK Data Centre Planning Database, version 1.0.0, project record BENCH-FOLLOW-MANOR. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/BENCH-FOLLOW-MANOR"
    },
    {
      "project_id": "BF9-MEDWAYONE",
      "name": "MedwayOne former Kingsnorth power station",
      "nation": "England",
      "stage_detail": "planning_permission_reported",
      "stage_label": "Planning permission reported",
      "latitude": 51.42867,
      "longitude": 0.59717,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Source project BF9-MEDWAYONE: MedwayOne former Kingsnorth power station. Kingsnorth on Medway/Hoo Peninsula; not Kingsnorth near Ashford. Locality representative point only; no site coordinate inferred.",
      "coordinate_source": "https://www.geonames.org/2645451/",
      "location_label": "Kingsnorth",
      "source_urls": [
        "https://medwayone.co.uk/news/approval-of-non-material-amendment/",
        "https://www.neso.energy/document/373996/download"
      ],
      "source_dates": [
        "2024-12-13"
      ],
      "map_id": 36,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "",
        "unspecified": "340 MW (queue field; basis unresolved)",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [],
        "unspecified": [
          {
            "category": "unspecified",
            "value": 340.0,
            "unit": "MW",
            "raw_boundary": "ea_associated_installed_capacity",
            "qualification": "MW unit from NESO explanatory FOI, not added to original XLSX raw field",
            "scope": "Customer/DNO supplied queue-item capacity, possibly stage or technology element; not certified maximum import",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "CYCLE25-EA-001127",
            "source_url": "https://www.neso.energy/document/373996/download",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "mva": []
      },
      "capacity_display": "Reported (basis unknown): 340 MW (queue field; basis unresolved)",
      "map_caption_lines": [
        "Reported (basis unknown): 340 MW (queue field; basis",
        "  unresolved)"
      ],
      "capacity_notes": [],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/BF9-MEDWAYONE",
      "citation_text": "ElecTrace (2026-10-14). MedwayOne former Kingsnorth power station. UK Data Centre Planning Database, version 1.0.0, project record BF9-MEDWAYONE. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/BF9-MEDWAYONE"
    },
    {
      "project_id": "BF9-EGGBOROUGH",
      "name": "Microsoft Eggborough campus",
      "nation": "England",
      "stage_detail": "planning_application_or_reserved_matters",
      "stage_label": "Planning application or reserved matters",
      "latitude": 53.70514,
      "longitude": -1.14859,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Exact settlement name in source location/project name: Microsoft Eggborough campus",
      "coordinate_source": "https://www.geonames.org/12262000/",
      "location_label": "Eggborough",
      "source_urls": [
        "https://www.eggboroughparish.org.uk/uploads/june0624.pdf?v=1726237870",
        "https://www.neso.energy/document/373996/download"
      ],
      "source_dates": [
        "2024-06-06"
      ],
      "map_id": 37,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "",
        "unspecified": "300 MW (queue field; basis unresolved)",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [],
        "unspecified": [
          {
            "category": "unspecified",
            "value": 300.0,
            "unit": "MW",
            "raw_boundary": "ea_associated_installed_capacity",
            "qualification": "MW unit from NESO explanatory FOI, not added to original XLSX raw field",
            "scope": "Customer/DNO supplied queue-item capacity, possibly stage or technology element; not certified maximum import",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "CYCLE25-EA-000578",
            "source_url": "https://www.neso.energy/document/373996/download",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "mva": []
      },
      "capacity_display": "Reported (basis unknown): 300 MW (queue field; basis unresolved)",
      "map_caption_lines": [
        "Reported (basis unknown): 300 MW (queue field; basis",
        "  unresolved)"
      ],
      "capacity_notes": [],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/BF9-EGGBOROUGH",
      "citation_text": "ElecTrace (2026-10-14). Microsoft Eggborough campus. UK Data Centre Planning Database, version 1.0.0, project record BF9-EGGBOROUGH. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/BF9-EGGBOROUGH"
    },
    {
      "project_id": "SOUTH-LANGLEY",
      "name": "Microsoft Langley",
      "nation": "England",
      "stage_detail": "enabling_works",
      "stage_label": "Enabling works",
      "latitude": 51.50949,
      "longitude": -0.59541,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Langley Business Centre, Slough was assigned to the Langley in Essex near 51.9959,0.10428. This contradicts the explicit Slough context. Corrected to the source-named locality; not a site coordinate.",
      "coordinate_source": "https://www.geonames.org/2637627/",
      "location_label": "Slough",
      "source_urls": [
        "https://local.microsoft.com/blog/langley-datacentre-planning-update/"
      ],
      "source_dates": [],
      "map_id": 38,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "",
        "unspecified": "",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [],
        "unspecified": [],
        "mva": []
      },
      "capacity_display": "Unknown",
      "map_caption_lines": [
        "Unknown"
      ],
      "capacity_notes": [],
      "capacity_unknown_reason": "No DC planning power capacity disclosed in frozen sources; non-demand equipment/area measures do not fill this gap.",
      "has_planning_or_campus_capacity_disclosure": false,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/SOUTH-LANGLEY",
      "citation_text": "ElecTrace (2026-10-14). Microsoft Langley. UK Data Centre Planning Database, version 1.0.0, project record SOUTH-LANGLEY. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/SOUTH-LANGLEY"
    },
    {
      "project_id": "UKN029",
      "name": "Microsoft Skelton Grange",
      "nation": "England",
      "stage_detail": "pre_application_or_consultation",
      "stage_label": "Pre-application or consultation",
      "latitude": 53.79648,
      "longitude": -1.54785,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Skelton Grange, Leeds was matched to a different Skelton east of Leeds, ignoring the explicit Leeds context. Corrected to the source-named locality; not a site coordinate.",
      "coordinate_source": "https://www.geonames.org/2644688/",
      "location_label": "Leeds",
      "source_urls": [
        "https://local.microsoft.com/blog/skelton-grange-leeds-datacentre-planning-application/",
        "https://aienergyintelligence.co.uk/uk-data-centre-tracker/skelton-grange-leeds"
      ],
      "source_dates": [
        "2025-06"
      ],
      "map_id": 39,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "",
        "unspecified": "",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [],
        "unspecified": [],
        "mva": []
      },
      "capacity_display": "Unknown",
      "map_caption_lines": [
        "Unknown"
      ],
      "capacity_notes": [],
      "capacity_unknown_reason": "No DC planning power capacity disclosed in frozen sources; non-demand equipment/area measures do not fill this gap.",
      "has_planning_or_campus_capacity_disclosure": false,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/UKN029",
      "citation_text": "ElecTrace (2026-10-14). Microsoft Skelton Grange. UK Data Centre Planning Database, version 1.0.0, project record UKN029. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UKN029"
    },
    {
      "project_id": "UKS015",
      "name": "Norwich Apex Data Centre",
      "nation": "England",
      "stage_detail": "pre_application_or_consultation",
      "stage_label": "Pre-application or consultation",
      "latitude": 52.58333,
      "longitude": 1.26667,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Source project UKS015: Keswick, South Norfolk. Keswick in South Norfolk, south of Norwich; not Keswick in Cumbria or coastal Norfolk. Locality representative point only; no site coordinate inferred.",
      "coordinate_source": "https://www.geonames.org/2645757/",
      "location_label": "Keswick",
      "source_urls": [
        "https://www.apexnorwichdatacentre.co.uk/"
      ],
      "source_dates": [],
      "map_id": 40,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "",
        "unspecified": "150 MW headline; conflicts with MVA definition",
        "mva": "150 MVA maximum demand; no MW conversion"
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [],
        "unspecified": [
          {
            "category": "unspecified",
            "value": 150.0,
            "unit": "MW",
            "raw_boundary": "data_centre_unspecified",
            "qualification": null,
            "scope": "Norwich Apex Data Centre",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "UKS015",
            "source_url": "https://www.apexnorwichdatacentre.co.uk/",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "mva": [
          {
            "category": "mva",
            "value": 150.0,
            "unit": "MVA",
            "raw_boundary": "facility_maximum_demand_apparent_power",
            "qualification": "up_to",
            "scope": "FAQ ElectricityandEnergy states maximum150MVA; pageheadline150MW conflicts",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "PLAN11-NORWICH-MVA",
            "source_url": "https://www.apexnorwichdatacentre.co.uk/",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          }
        ]
      },
      "capacity_display": "Reported (basis unknown): 150 MW headline; conflicts with MVA definition; MVA: 150 MVA maximum demand; no MW conversion",
      "map_caption_lines": [
        "Reported (basis unknown): 150 MW headline; conflicts with",
        "  MVA definition",
        "MVA: 150 MVA maximum demand; no MW conversion"
      ],
      "capacity_notes": [],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/UKS015",
      "citation_text": "ElecTrace (2026-10-14). Norwich Apex Data Centre. UK Data Centre Planning Database, version 1.0.0, project record UKS015. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UKS015"
    },
    {
      "project_id": "D045",
      "name": "Nscale AI Campus Loughton",
      "nation": "England",
      "stage_detail": "planned_or_early_development",
      "stage_label": "Planned or early development",
      "latitude": 51.64601,
      "longitude": 0.05382,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Source project D045: Loughton, Essex. Loughton in Essex, not Shropshire or Milton Keynes. Locality representative point only; no site coordinate inferred.",
      "coordinate_source": "https://www.geonames.org/2643558/",
      "location_label": "Loughton",
      "source_urls": [
        "https://www.nscale.com/press-releases/nscale-uk-ai-infrastructure-announcement"
      ],
      "source_dates": [],
      "map_id": 41,
      "capacity_columns": {
        "it": "50 MW AI; up to 90 MW scalable (not additive)",
        "facility": "",
        "grid": "",
        "unspecified": "",
        "mva": ""
      },
      "capacity_categories": {
        "it": [
          {
            "category": "it",
            "value": 50.0,
            "unit": "MW",
            "raw_boundary": "AI capacity; scalable to 90MW",
            "qualification": null,
            "scope": "Nscale AI Campus Loughton",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "D045",
            "source_url": "https://www.nscale.com/press-releases/nscale-uk-ai-infrastructure-announcement",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          },
          {
            "category": "it",
            "value": 50.0,
            "unit": "MW",
            "raw_boundary": "AI capacity; scalable to 90MW",
            "qualification": null,
            "scope": "unspecified",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "D045",
            "source_url": "https://www.nscale.com/press-releases/nscale-uk-ai-infrastructure-announcement",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          },
          {
            "category": "it",
            "value": 90,
            "unit": "MW",
            "raw_boundary": "ai_capacity_scalability",
            "qualification": null,
            "scope": "Potential terminal AI capacity; includes 50 MW initial disclosure",
            "stage": "potential expansion",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "D045",
            "source_url": "https://www.nscale.com/press-releases/nscale-uk-ai-infrastructure-announcement",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "facility": [],
        "grid": [],
        "unspecified": [],
        "mva": []
      },
      "capacity_display": "IT: 50 MW AI; up to 90 MW scalable (not additive)",
      "map_caption_lines": [
        "IT: 50 MW AI; up to 90 MW scalable (not additive)"
      ],
      "capacity_notes": [],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/D045",
      "citation_text": "ElecTrace (2026-10-14). Nscale AI Campus Loughton. UK Data Centre Planning Database, version 1.0.0, project record D045. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/D045"
    },
    {
      "project_id": "ENG9-ORBITAL",
      "name": "Orbital Enfield / Hertsmere Junction 24 Ridgeway",
      "nation": "England",
      "stage_detail": "connection_offer_or_development",
      "stage_label": "Connection offer or development",
      "latitude": 51.65147,
      "longitude": -0.08497,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "The generic road phrase Junction 24 was matched to Junction locality in inner London. The source describes a cross-boundary Enfield/Hertsmere Ridgeway project. Corrected to the source-named locality; not a site coordinate.",
      "coordinate_source": "https://www.geonames.org/2649997/",
      "location_label": "Enfield Town",
      "source_urls": [
        "https://orbitaldatacentres.co.uk/"
      ],
      "source_dates": [],
      "map_id": 42,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "300 MW terminal reserved offer; includes 150 MW initial",
        "unspecified": "",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [
          {
            "category": "grid",
            "value": 300.0,
            "unit": "MW",
            "raw_boundary": "grid_connection_reserved_terminal",
            "qualification": "reported",
            "scope": "Terminal 2033 scope across Enfield/Hertsmere phases; not 150+300",
            "stage": "reserved_offer",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "ENG9-ORBITAL",
            "source_url": "https://orbitaldatacentres.co.uk/",
            "source_date": null,
            "preferred_for_display": true,
            "additive": false
          },
          {
            "category": "grid",
            "value": 150.0,
            "unit": "MW",
            "raw_boundary": "grid_connection_reserved_initial",
            "qualification": "reported",
            "scope": "Initial 2030 supply; included within terminal 300 MW, not additive",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "ENG9-ORBITAL",
            "source_url": "https://orbitaldatacentres.co.uk/",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "unspecified": [],
        "mva": []
      },
      "capacity_display": "Grid: 300 MW terminal reserved offer; includes 150 MW initial",
      "map_caption_lines": [
        "Grid: 300 MW terminal reserved offer; includes 150 MW",
        "  initial"
      ],
      "capacity_notes": [],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/ENG9-ORBITAL",
      "citation_text": "ElecTrace (2026-10-14). Orbital Enfield / Hertsmere Junction 24 Ridgeway. UK Data Centre Planning Database, version 1.0.0, project record ENG9-ORBITAL. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/ENG9-ORBITAL"
    },
    {
      "project_id": "V39-PINEWOOD-NURSERIES",
      "name": "Pinewood Nurseries alternative data centre scheme",
      "nation": "England",
      "stage_detail": "planning_application_or_reserved_matters",
      "stage_label": "Planning application or reserved matters",
      "latitude": 51.53749,
      "longitude": -0.575807,
      "coordinate_precision": "postcode_centroid",
      "coordinate_note": "Public postcode centroid. Not a surveyed site boundary.",
      "coordinate_source": "https://api.postcodes.io/postcodes/SL3%206NB",
      "location_label": "SL3 6NB",
      "source_urls": [
        "https://mail.stokepogesparishcouncil.gov.uk/announcement/objections-to-proposals-for-development-at-pinewood-nurseries"
      ],
      "source_dates": [
        "2026-09-16"
      ],
      "map_id": 43,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "",
        "unspecified": "",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [],
        "unspecified": [],
        "mva": []
      },
      "capacity_display": "Unknown",
      "map_caption_lines": [
        "Unknown"
      ],
      "capacity_notes": [],
      "capacity_unknown_reason": "No DC planning power capacity disclosed in frozen sources; non-demand equipment/area measures do not fill this gap.",
      "has_planning_or_campus_capacity_disclosure": false,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/V39-PINEWOOD-NURSERIES",
      "citation_text": "ElecTrace (2026-10-14). Pinewood Nurseries alternative data centre scheme. UK Data Centre Planning Database, version 1.0.0, project record V39-PINEWOOD-NURSERIES. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/V39-PINEWOOD-NURSERIES"
    },
    {
      "project_id": "MID-PORTAL",
      "name": "Port@l Nottingham Sherwood Business Park",
      "nation": "England",
      "stage_detail": "planned_or_early_development",
      "stage_label": "Planned or early development",
      "latitude": 53.072193,
      "longitude": -1.251299,
      "coordinate_precision": "postcode_centroid",
      "coordinate_note": "Public postcode centroid. Not a surveyed site boundary.",
      "coordinate_source": "https://api.postcodes.io/postcodes/NG15%200DR",
      "location_label": "NG15 0DR",
      "source_urls": [
        "https://www.datacentermap.com/united-kingdom/nottingham/portl-nottingham/"
      ],
      "source_dates": [
        "2026-04"
      ],
      "map_id": 44,
      "capacity_columns": {
        "it": "20 MW proposed; secondary-source/conditional",
        "facility": "",
        "grid": "",
        "unspecified": "",
        "mva": ""
      },
      "capacity_categories": {
        "it": [
          {
            "category": "it",
            "value": 20.0,
            "unit": "MW",
            "raw_boundary": "IT",
            "qualification": null,
            "scope": "Port@l Nottingham Sherwood Business Park",
            "stage": "proposed_secondary_directory",
            "claim_context": "Conditional or historical IT figure",
            "source_record_id": "MID-PORTAL",
            "source_url": "https://www.datacentermap.com/united-kingdom/nottingham/portl-nottingham/",
            "source_date": "2026-04",
            "preferred_for_display": true,
            "additive": false
          },
          {
            "category": "it",
            "value": 20.0,
            "unit": "MW",
            "raw_boundary": "IT",
            "qualification": null,
            "scope": "site_or_phase_as_named",
            "stage": "source-stage unresolved",
            "claim_context": "Conditional or historical IT figure",
            "source_record_id": "MID-PORTAL",
            "source_url": "https://www.datacentermap.com/united-kingdom/nottingham/portl-nottingham/",
            "source_date": "2026-04",
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "facility": [],
        "grid": [],
        "unspecified": [],
        "mva": []
      },
      "capacity_display": "IT: 20 MW proposed; secondary-source/conditional",
      "map_caption_lines": [
        "IT: 20 MW proposed; secondary-source/conditional"
      ],
      "capacity_notes": [
        "IT capacity qualification: proposed secondary directory."
      ],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/MID-PORTAL",
      "citation_text": "ElecTrace (2026-10-14). Port@l Nottingham Sherwood Business Park. UK Data Centre Planning Database, version 1.0.0, project record MID-PORTAL. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/MID-PORTAL"
    },
    {
      "project_id": "UKS007",
      "name": "Pure DC LON01 Brent Cross",
      "nation": "England",
      "stage_detail": "operating_with_expansion",
      "stage_label": "Operating site with expansion plans",
      "latitude": 51.570430143384144,
      "longitude": -0.23891668633348712,
      "coordinate_precision": "source_reference_point",
      "coordinate_note": "Published Site 2 central-building section reference from 2024 environmental modelling table; a building-level representative point, not a cadastral survey or electricity connection point. Coordinate of the identified building within the grouped campus; marker does not show a site boundary.",
      "coordinate_source": "https://consult.environment-agency.gov.uk/psc/nw2-7ba-pdcg-group-services-limited-v002/supporting_documents/Application%20Variation%20V002%20%20AQA%20Report%20V2%2022082024.pdf",
      "location_label": "Priestly Way, Brent, London",
      "source_urls": [
        "https://puredc.com/2026/09/03/puredc-final-build-lon01-campus"
      ],
      "source_dates": [
        "2026-09-03"
      ],
      "map_id": 45,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "",
        "unspecified": "70 MW B2 phase; 90 MW whole campus incl. existing",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [],
        "unspecified": [
          {
            "category": "unspecified",
            "value": 90.0,
            "unit": "MW",
            "raw_boundary": "campus_unspecified",
            "qualification": null,
            "scope": "Pure DC LON01 Brent Cross",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "UKS007",
            "source_url": "https://puredc.com/2026/09/03/puredc-final-build-lon01-campus",
            "source_date": "2026-09-03",
            "preferred_for_display": false,
            "additive": false
          },
          {
            "category": "unspecified",
            "value": 70,
            "unit": "MW",
            "raw_boundary": "dc_building_capacity_unspecified",
            "qualification": null,
            "scope": "B2 final-build phase; contained in 90 MW campus",
            "stage": "B2 construction / Q2 2029 target",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "UKS007",
            "source_url": "https://puredc.com/2026/09/03/puredc-final-build-lon01-campus",
            "source_date": "2026-09-03",
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "mva": []
      },
      "capacity_display": "Reported (basis unknown): 70 MW B2 phase; 90 MW whole campus incl. existing",
      "map_caption_lines": [
        "Reported (basis unknown): 70 MW B2 phase; 90 MW whole campus",
        "  incl. existing"
      ],
      "capacity_notes": [
        "Includes existing facilities or conditional expansion: disclosed campus capacity is not remaining new-build demand; no subtraction is inferred."
      ],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/UKS007",
      "citation_text": "ElecTrace (2026-10-14). Pure DC LON01 Brent Cross. UK Data Centre Planning Database, version 1.0.0, project record UKS007. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UKS007"
    },
    {
      "project_id": "RESEARCH-UK-CAMBOIS-20260911",
      "name": "QTS Cambois data centre campus",
      "nation": "England",
      "stage_detail": "enabling_works",
      "stage_label": "Enabling works",
      "latitude": 55.15184,
      "longitude": -1.5242,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Source project RESEARCH-UK-CAMBOIS-20260911: Cambois, Northumberland, near Blyth. Cambois, Northumberland near Blyth, rather than generic Newcastle. Locality representative point only; no site coordinate inferred.",
      "coordinate_source": "https://www.geonames.org/2653946/",
      "location_label": "Cambois",
      "source_urls": [
        "https://q.com/data-centers/cambois/",
        "https://aienergyintelligence.co.uk/uk-data-centre-tracker/cambois-data-centre-campus",
        "https://cdn.threerivers.gov.uk/files/2024/09/86e35e70-797f-11ef-ba8e-ed267910e33d-I39-QTS%C3%94%C3%87%C3%B4Data%20Centre%20Campus%20Cambois%20Northumberland%2C%20EIA%20Scoping%20Report%202024.pdf",
        "https://www.corgan.com/projects/qts-data-center-campus-cambois"
      ],
      "source_dates": [
        "2024"
      ],
      "map_id": 46,
      "capacity_columns": {
        "it": "720 MW",
        "facility": "about 1,100 MW (design disclosure)",
        "grid": "",
        "unspecified": "",
        "mva": ""
      },
      "capacity_categories": {
        "it": [
          {
            "category": "it",
            "value": 720.0,
            "unit": "MW",
            "raw_boundary": "it_load",
            "qualification": "primary architect explicitly states720campus and72IT perbuilding; completion forecast2035",
            "scope": "Entire ten-building QTS Cambois terminal campus; ten72MW IT buildings contained in total",
            "stage": "planned_primary_original_verified",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "V41-CAMBOIS-CORGAN-IT",
            "source_url": "https://www.corgan.com/projects/qts-data-center-campus-cambois",
            "source_date": null,
            "preferred_for_display": true,
            "additive": false
          },
          {
            "category": "it",
            "value": 720.0,
            "unit": "MW",
            "raw_boundary": "Corgan describes full campus IT capacity, ten buildings each 72 MW; unaccepted source claim",
            "qualification": null,
            "scope": "QTS Cambois data centre campus",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "RESEARCH-UK-CAMBOIS-20260911",
            "source_url": "https://q.com/data-centers/cambois/",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          },
          {
            "category": "it",
            "value": 720.0,
            "unit": "MW",
            "raw_boundary": "Corgan describes full campus IT capacity, ten buildings each 72 MW; unaccepted source claim",
            "qualification": null,
            "scope": "unspecified",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "RESEARCH-UK-CAMBOIS-20260911",
            "source_url": "https://q.com/data-centers/cambois/",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          },
          {
            "category": "it",
            "value": 720.0,
            "unit": "MW",
            "raw_boundary": "IT_load",
            "qualification": null,
            "scope": "Cambois data centre campus",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "AEIUK-004",
            "source_url": "https://aienergyintelligence.co.uk/uk-data-centre-tracker/cambois-data-centre-campus",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "facility": [
          {
            "category": "facility",
            "value": 1100.0,
            "unit": "MW",
            "raw_boundary": "whole_facility_electrical_demand",
            "qualification": "approximate",
            "scope": "EIA scoping4.1.7; ten-buildingcampus;alternativeboundaryto720IT,notadditional",
            "stage": "design",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "SSE10-CAMBOIS-POWER",
            "source_url": "https://cdn.threerivers.gov.uk/files/2024/09/86e35e70-797f-11ef-ba8e-ed267910e33d-I39-QTS%C3%94%C3%87%C3%B4Data%20Centre%20Campus%20Cambois%20Northumberland%2C%20EIA%20Scoping%20Report%202024.pdf",
            "source_date": "2024",
            "preferred_for_display": true,
            "additive": false
          }
        ],
        "grid": [],
        "unspecified": [],
        "mva": []
      },
      "capacity_display": "IT: 720 MW; Facility: about 1,100 MW (design disclosure)",
      "map_caption_lines": [
        "IT: 720 MW",
        "Facility: about 1,100 MW (design disclosure)"
      ],
      "capacity_notes": [
        "IT capacity qualification: planned primary original verified.",
        "Facility boundary: whole_facility_electrical_demand; design."
      ],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/RESEARCH-UK-CAMBOIS-20260911",
      "citation_text": "ElecTrace (2026-10-14). QTS Cambois data centre campus. UK Data Centre Planning Database, version 1.0.0, project record RESEARCH-UK-CAMBOIS-20260911. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/RESEARCH-UK-CAMBOIS-20260911"
    },
    {
      "project_id": "UKS004",
      "name": "Quest Park Data Centre Campus",
      "nation": "England",
      "stage_detail": "pre_application_or_consultation",
      "stage_label": "Pre-application or consultation",
      "latitude": 52.13459,
      "longitude": -0.46632,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Ampthill Road is a road name in a location stated as Bedford/Central Bedfordshire. Matching Ampthill town upgrades a street token into an unsupported town coordinate. Corrected to the source-named locality; not a site coordinate.",
      "coordinate_source": "https://www.geonames.org/2656046/",
      "location_label": "Bedford",
      "source_urls": [
        "https://assets.publishing.service.gov.uk/media/6a2fc930c39255c595b5084f/Request_Statement_on_behalf_of_Questpit_Limited.pdf",
        "https://aienergyintelligence.co.uk/uk-data-centre-tracker/bedford-ampthill-road-campus",
        "https://www.neso.energy/document/373996/download"
      ],
      "source_dates": [
        "2026-04"
      ],
      "map_id": 47,
      "capacity_columns": {
        "it": "720 MW",
        "facility": "1,000 MW (design disclosure)",
        "grid": "200 MW (source-reported connection)",
        "unspecified": "",
        "mva": ""
      },
      "capacity_categories": {
        "it": [
          {
            "category": "it",
            "value": 720.0,
            "unit": "MW",
            "raw_boundary": "it_load",
            "qualification": "indicativeatcurrentPUE, sourceauthorassumption subjecttodesignrevision",
            "scope": "fourbuildingsx180MWIT, each3x60MWIThalls; containedin1000MWfacility",
            "stage": "nsip_preapplication",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "V39-QUEST-SELFPOWER-BOUNDARIES",
            "source_url": "https://assets.publishing.service.gov.uk/media/6a2fc930c39255c595b5084f/Request_Statement_on_behalf_of_Questpit_Limited.pdf",
            "source_date": "2026-04",
            "preferred_for_display": true,
            "additive": false
          },
          {
            "category": "it",
            "value": 720.0,
            "unit": "MW",
            "raw_boundary": "IT_load",
            "qualification": null,
            "scope": "Quest Park Data Centre Campus",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "UKS004",
            "source_url": "https://assets.publishing.service.gov.uk/media/6a2fc930c39255c595b5084f/Request_Statement_on_behalf_of_Questpit_Limited.pdf",
            "source_date": "2026-04",
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "facility": [
          {
            "category": "facility",
            "value": 1000.0,
            "unit": "MW",
            "raw_boundary": "whole_facility_design",
            "qualification": null,
            "scope": "Quest Park Data Centre Campus",
            "stage": "design",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "UKS004",
            "source_url": "https://assets.publishing.service.gov.uk/media/6a2fc930c39255c595b5084f/Request_Statement_on_behalf_of_Questpit_Limited.pdf",
            "source_date": "2026-04",
            "preferred_for_display": true,
            "additive": false
          },
          {
            "category": "facility",
            "value": 1000.0,
            "unit": "MW",
            "raw_boundary": "whole_facility_design",
            "qualification": "planneddesign; wholeDCbuildingspowernotallpublicgridimport",
            "scope": "combinedpowerrequirementfourDCbuildings, four250MWcomponents",
            "stage": "design",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "V39-QUEST-SELFPOWER-BOUNDARIES",
            "source_url": "https://assets.publishing.service.gov.uk/media/6a2fc930c39255c595b5084f/Request_Statement_on_behalf_of_Questpit_Limited.pdf",
            "source_date": "2026-04",
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "grid": [
          {
            "category": "grid",
            "value": 200.0,
            "unit": "MW",
            "raw_boundary": "grid_connection_disclosed",
            "qualification": null,
            "scope": "Quest Park Data Centre Campus",
            "stage": "source_claimed_connection",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "UKS004",
            "source_url": "https://assets.publishing.service.gov.uk/media/6a2fc930c39255c595b5084f/Request_Statement_on_behalf_of_Questpit_Limited.pdf",
            "source_date": "2026-04",
            "preferred_for_display": true,
            "additive": false
          },
          {
            "category": "grid",
            "value": 200.0,
            "unit": "MW",
            "raw_boundary": "contracted_grid_connection",
            "qualification": "applicantstatementofagreement; actualcontractnotattached; alreadyexistingUKS004",
            "scope": "initialNESOconnection signedfordeliveryOctober2034, withfutureincreaseability",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "V39-QUEST-SELFPOWER-BOUNDARIES",
            "source_url": "https://assets.publishing.service.gov.uk/media/6a2fc930c39255c595b5084f/Request_Statement_on_behalf_of_Questpit_Limited.pdf",
            "source_date": "2026-04",
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "unspecified": [
          {
            "category": "unspecified",
            "value": 200.0,
            "unit": "MW",
            "raw_boundary": "ea_associated_installed_capacity",
            "qualification": "MW unit from NESO explanatory FOI, not added to original XLSX raw field",
            "scope": "Customer/DNO supplied queue-item capacity, possibly stage or technology element; not certified maximum import",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "CYCLE25-EA-001673",
            "source_url": "https://www.neso.energy/document/373996/download",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          },
          {
            "category": "unspecified",
            "value": 200.0,
            "unit": "MW",
            "raw_boundary": "unknown",
            "qualification": null,
            "scope": "unspecified",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "V39-QUEST-SELFPOWER-BOUNDARIES",
            "source_url": "https://assets.publishing.service.gov.uk/media/6a2fc930c39255c595b5084f/Request_Statement_on_behalf_of_Questpit_Limited.pdf",
            "source_date": "2026-04",
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "mva": []
      },
      "capacity_display": "IT: 720 MW; Facility: 1,000 MW (design disclosure); Grid: 200 MW (source-reported connection)",
      "map_caption_lines": [
        "IT: 720 MW",
        "Facility: 1,000 MW (design disclosure)",
        "Grid: 200 MW (source-reported connection)"
      ],
      "capacity_notes": [
        "IT capacity qualification: nsip preapplication.",
        "Facility boundary: whole_facility_design; design."
      ],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/UKS004",
      "citation_text": "ElecTrace (2026-10-14). Quest Park Data Centre Campus. UK Data Centre Planning Database, version 1.0.0, project record UKS004. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UKS004"
    },
    {
      "project_id": "SOUTH-READING-QUARRY",
      "name": "Reading Quarry adjacent data centre",
      "nation": "England",
      "stage_detail": "planning_permission_reported",
      "stage_label": "Planning permission reported",
      "latitude": 51.41131,
      "longitude": -1.04241,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Source project SOUTH-READING-QUARRY: Reading Quarry, Burghfield. Source specifies Reading Quarry, Burghfield; use Burghfield locality rather than Reading centre. Locality representative point only; no site coordinate inferred.",
      "coordinate_source": "https://www.geonames.org/2654301/",
      "location_label": "Burghfield",
      "source_urls": [
        "https://decisionmaking.westberks.gov.uk/mgAi.aspx?ID=74378"
      ],
      "source_dates": [],
      "map_id": 48,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "",
        "unspecified": "",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [],
        "unspecified": [],
        "mva": []
      },
      "capacity_display": "Unknown",
      "map_caption_lines": [
        "Unknown"
      ],
      "capacity_notes": [],
      "capacity_unknown_reason": "No DC planning power capacity disclosed in frozen sources; non-demand equipment/area measures do not fill this gap.",
      "has_planning_or_campus_capacity_disclosure": false,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/SOUTH-READING-QUARRY",
      "citation_text": "ElecTrace (2026-10-14). Reading Quarry adjacent data centre. UK Data Centre Planning Database, version 1.0.0, project record SOUTH-READING-QUARRY. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/SOUTH-READING-QUARRY"
    },
    {
      "project_id": "UKS008",
      "name": "SEGRO Pure Premier Park",
      "nation": "England",
      "stage_detail": "planning_permission_reported",
      "stage_label": "Planning permission reported",
      "latitude": 51.53083,
      "longitude": -0.28238,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Exact settlement name in source location/project name: Park Royal, London",
      "coordinate_source": "https://www.geonames.org/11669856/",
      "location_label": "Park Royal",
      "source_urls": [
        "https://www.segro.com/media/news/2026/160326-segro-plc-segro-data-centre-update",
        "https://aienergyintelligence.co.uk/uk-data-centre-tracker/premier-park-park-royal",
        "https://www.segro.com/media/kbshtxbq/segro_annual-report-accounts-2025.pdf"
      ],
      "source_dates": [
        "2026-03-16",
        "2025"
      ],
      "map_id": 49,
      "capacity_columns": {
        "it": "56 MW",
        "facility": "",
        "grid": "",
        "unspecified": "",
        "mva": "70 MVA (separate boundary)"
      },
      "capacity_categories": {
        "it": [
          {
            "category": "it",
            "value": 56.0,
            "unit": "MW",
            "raw_boundary": "it_load",
            "qualification": "issuer stated plannedIT load; no agentPUE/PF conversion",
            "scope": "SEGRO Pure Premier Park single JV development,10acre plot inParkRoyalWestLondon",
            "stage": "planned_primary_original_verified",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "V41-PREMIER-SEGRO-ANNUAL-IT",
            "source_url": "https://www.segro.com/media/kbshtxbq/segro_annual-report-accounts-2025.pdf",
            "source_date": "2025",
            "preferred_for_display": true,
            "additive": false
          },
          {
            "category": "it",
            "value": 56.0,
            "unit": "MW",
            "raw_boundary": "IT_load",
            "qualification": null,
            "scope": "SEGRO Pure Premier Park",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "UKS008",
            "source_url": "https://www.segro.com/media/news/2026/160326-segro-plc-segro-data-centre-update",
            "source_date": "2026-03-16",
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "facility": [],
        "grid": [],
        "unspecified": [],
        "mva": [
          {
            "category": "mva",
            "value": 70.0,
            "unit": "MVA",
            "raw_boundary": "apparent_power",
            "qualification": null,
            "scope": "SEGRO Pure Premier Park",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "UKS008",
            "source_url": "https://www.segro.com/media/news/2026/160326-segro-plc-segro-data-centre-update",
            "source_date": "2026-03-16",
            "preferred_for_display": false,
            "additive": false
          }
        ]
      },
      "capacity_display": "IT: 56 MW; MVA: 70 MVA (separate boundary)",
      "map_caption_lines": [
        "IT: 56 MW",
        "MVA: 70 MVA (separate boundary)"
      ],
      "capacity_notes": [
        "IT capacity qualification: planned primary original verified."
      ],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/UKS008",
      "citation_text": "ElecTrace (2026-10-14). SEGRO Pure Premier Park. UK Data Centre Planning Database, version 1.0.0, project record UKS008. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UKS008"
    },
    {
      "project_id": "UKS009",
      "name": "SEGRO Slough 2026 powered-shell pre-let",
      "nation": "England",
      "stage_detail": "planning_permission_reported",
      "stage_label": "Planning permission reported",
      "latitude": 51.50949,
      "longitude": -0.59541,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Exact settlement name in source location/project name: Slough Trading Estate",
      "coordinate_source": "https://www.geonames.org/2637627/",
      "location_label": "Slough",
      "source_urls": [
        "https://www.segro.com/media/news/2026/160326-segro-plc-segro-data-centre-update"
      ],
      "source_dates": [
        "2026-03-16"
      ],
      "map_id": 50,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "",
        "unspecified": "",
        "mva": "50 MVA"
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [],
        "unspecified": [],
        "mva": [
          {
            "category": "mva",
            "value": 50.0,
            "unit": "MVA",
            "raw_boundary": "apparent_power",
            "qualification": null,
            "scope": "SEGRO Slough 2026 powered-shell pre-let",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "UKS009",
            "source_url": "https://www.segro.com/media/news/2026/160326-segro-plc-segro-data-centre-update",
            "source_date": "2026-03-16",
            "preferred_for_display": false,
            "additive": false
          }
        ]
      },
      "capacity_display": "MVA: 50 MVA",
      "map_caption_lines": [
        "MVA: 50 MVA"
      ],
      "capacity_notes": [],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/UKS009",
      "citation_text": "ElecTrace (2026-10-14). SEGRO Slough 2026 powered-shell pre-let. UK Data Centre Planning Database, version 1.0.0, project record UKS009. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UKS009"
    },
    {
      "project_id": "SOUTH-SHELFORD",
      "name": "Shelford landfill data centre",
      "nation": "England",
      "stage_detail": "planning_application_or_reserved_matters",
      "stage_label": "Planning application or reserved matters",
      "latitude": 51.27904,
      "longitude": 1.07992,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Source project SOUTH-SHELFORD: Shelford Farm Estate, Broad Oak Road, Canterbury. Source states Shelford Farm Estate, Broad Oak Road, Canterbury; not Shelford in Cambridgeshire. Locality representative point only; no site coordinate inferred.",
      "coordinate_source": "https://www.geonames.org/2653877/",
      "location_label": "Canterbury",
      "source_urls": [
        "https://docs.planning.org.uk/20251127/137/T5V2GLEAJSQ00/h9i3ofuy23xfmyy7.pdf"
      ],
      "source_dates": [
        "2025-11"
      ],
      "map_id": 51,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "",
        "unspecified": "",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [],
        "unspecified": [],
        "mva": []
      },
      "capacity_display": "Unknown",
      "map_caption_lines": [
        "Unknown"
      ],
      "capacity_notes": [],
      "capacity_unknown_reason": "No DC planning power capacity disclosed in frozen sources; non-demand equipment/area measures do not fill this gap.",
      "has_planning_or_campus_capacity_disclosure": false,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/SOUTH-SHELFORD",
      "citation_text": "ElecTrace (2026-10-14). Shelford landfill data centre. UK Data Centre Planning Database, version 1.0.0, project record SOUTH-SHELFORD. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/SOUTH-SHELFORD"
    },
    {
      "project_id": "SYN15-SILICON-SANDS",
      "name": "Silicon Sands / Blackpool Airport Enterprise Zone digital campus",
      "nation": "England",
      "stage_detail": "planning_permission_reported",
      "stage_label": "Planning permission reported",
      "latitude": 53.81667,
      "longitude": -3.05,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Exact settlement name in source location/project name: Silicon Sands / Blackpool Airport Enterprise Zone digital campus",
      "coordinate_source": "https://www.geonames.org/2655459/",
      "location_label": "Blackpool",
      "source_urls": [
        "https://investinlancashire.com/case-studies/blackpool-airport-enterprise-zone-and-silicon-sands",
        "https://www.blackpool.gov.uk/news/plans-for-firstenergy-efficientdata-centre-as-part-ofsiliconsandsmoving-forward.aspx?date=24-07-2026",
        "https://news.enwl.co.uk/news/bumper-investment-to-transform-blackpools-power-network"
      ],
      "source_dates": [
        "2026-07-24",
        "2026-04-21"
      ],
      "map_id": 52,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "6 MW phase offer incl. offices/research",
        "unspecified": "2-6 MW demonstrator; up to 1,000 MW vision",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [
          {
            "category": "grid",
            "value": 32.0,
            "unit": "MW",
            "raw_boundary": "campus_power_available_allocation_unresolved",
            "qualification": "not confirmed DC-only incremental grid import",
            "scope": "available infrastructure for digitalcampus",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "SYN15-SILICON-SANDS",
            "source_url": "https://investinlancashire.com/case-studies/blackpool-airport-enterprise-zone-and-silicon-sands",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          },
          {
            "category": "grid",
            "value": 6.0,
            "unit": "MW",
            "raw_boundary": "phase_electrical_supply_offer",
            "qualification": "Local authority reports electrical supply offer; acceptance and net-new DC-only allocation not confirmed",
            "scope": "first data centre plus office/research phase",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "CYCLE16-SILICON-COUNCIL",
            "source_url": "https://www.blackpool.gov.uk/news/plans-for-firstenergy-efficientdata-centre-as-part-ofsiliconsandsmoving-forward.aspx?date=24-07-2026",
            "source_date": "2026-07-24",
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "unspecified": [
          {
            "category": "unspecified",
            "value": 2.0,
            "unit": "MW",
            "raw_boundary": "dc_capacity_unspecified",
            "qualification": "2–6MW, range not additive",
            "scope": "initial demonstrator lower bound",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "SYN15-SILICON-SANDS",
            "source_url": "https://investinlancashire.com/case-studies/blackpool-airport-enterprise-zone-and-silicon-sands",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          },
          {
            "category": "unspecified",
            "value": 6.0,
            "unit": "MW",
            "raw_boundary": "dc_capacity_unspecified",
            "qualification": "range not terminalcampus",
            "scope": "initial demonstrator upper bound",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "SYN15-SILICON-SANDS",
            "source_url": "https://investinlancashire.com/case-studies/blackpool-airport-enterprise-zone-and-silicon-sands",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          },
          {
            "category": "unspecified",
            "value": 1000.0,
            "unit": "MW",
            "raw_boundary": "dc_capacity_potential_unspecified",
            "qualification": "potential; not signed connection",
            "scope": "ultimate digitalcampus",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "SYN15-SILICON-SANDS",
            "source_url": "https://investinlancashire.com/case-studies/blackpool-airport-enterprise-zone-and-silicon-sands",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "mva": []
      },
      "capacity_display": "Grid: 6 MW phase offer incl. offices/research; Reported (basis unknown): 2-6 MW demonstrator; up to 1,000 MW vision",
      "map_caption_lines": [
        "Grid: 6 MW phase offer incl. offices/research",
        "Reported (basis unknown): 2-6 MW demonstrator; up to 1,000",
        "  MW vision"
      ],
      "capacity_notes": [],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/SYN15-SILICON-SANDS",
      "citation_text": "ElecTrace (2026-10-14). Silicon Sands / Blackpool Airport Enterprise Zone digital campus. UK Data Centre Planning Database, version 1.0.0, project record SYN15-SILICON-SANDS. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/SYN15-SILICON-SANDS"
    },
    {
      "project_id": "V9-SOMERSET-HORSEY",
      "name": "Somerset Data Centre / Horsey Level",
      "nation": "England",
      "stage_detail": "pre_application_or_consultation",
      "stage_label": "Pre-application or consultation",
      "latitude": 51.12837,
      "longitude": -3.00356,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Source project V9-SOMERSET-HORSEY: Somerset Data Centre / Horsey Level. The retained V9-SOMERSET-HORSEY identity_hint explicitly says ExpressDistributionPark HorseyLevel northBridgwater; use Bridgwater locality only, not Horsey in Norfolk or the grid substation. Locality representative point only; no site coordinate inferred.",
      "coordinate_source": "https://www.geonames.org/2654730/",
      "location_label": "Bridgwater",
      "source_urls": [
        "https://www.datacenterdynamics.com/en/news/500mw-data-center-campus-planned-in-somerset-uk/",
        "https://www.neso.energy/document/373996/download",
        "https://sdc.somerset.gov.uk/Planning_Online/Download?Uri=4780419&ren=0&ext=PDF&desc=09_25_00024_EIA+Scoping+Report+%28Redacted%29&archive=false",
        "https://sdc.somerset.gov.uk/Planning_Online/Download?Uri=4795201&ren=751363&ext=pdf&desc=09_25_00024_EIA+Scoping+Opinion&archive=false"
      ],
      "source_dates": [
        "2026-02-18",
        "2025-12-23",
        "2026-02-10"
      ],
      "map_id": 53,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "500 MW applicant-reported offer; date conflict",
        "unspecified": "",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [
          {
            "category": "grid",
            "value": 500.0,
            "unit": "MW",
            "raw_boundary": "planning_reported_NESO_connection_offer",
            "qualification": null,
            "scope": "Single named data-centre site; applicant EDP reports confirmed NESO offer following2024application, expects access by2030. Offer document and acceptance not independently supplied.",
            "stage": "applicant_reported_offer",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "CYCLE29-HORSEY-OFFER",
            "source_url": "https://sdc.somerset.gov.uk/Planning_Online/Download?Uri=4780419&ren=0&ext=PDF&desc=09_25_00024_EIA+Scoping+Report+%28Redacted%29&archive=false",
            "source_date": "2025-12-23",
            "preferred_for_display": true,
            "additive": false
          }
        ],
        "unspecified": [
          {
            "category": "unspecified",
            "value": 500.0,
            "unit": "MW",
            "raw_boundary": "DC_capacity_unspecified",
            "qualification": "up_to",
            "scope": "campus",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "V9-SOMERSET-HORSEY",
            "source_url": "https://www.datacenterdynamics.com/en/news/500mw-data-center-campus-planned-in-somerset-uk/",
            "source_date": "2026-02-18",
            "preferred_for_display": false,
            "additive": false
          },
          {
            "category": "unspecified",
            "value": 500.0,
            "unit": "MW",
            "raw_boundary": "ea_associated_installed_capacity",
            "qualification": "MW unit from NESO explanatory FOI, not added to original XLSX raw field",
            "scope": "Customer/DNO supplied queue-item capacity, possibly stage or technology element; not certified maximum import",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "CYCLE25-EA-001057",
            "source_url": "https://www.neso.energy/document/373996/download",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          },
          {
            "category": "unspecified",
            "value": 500.0,
            "unit": "MW",
            "raw_boundary": "scoping_opinion_dc_power_description",
            "qualification": null,
            "scope": "Council repeats scheme power description from applicant material; not independent grid certification, not additional500MW",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "CYCLE29-HORSEY-OPINION",
            "source_url": "https://sdc.somerset.gov.uk/Planning_Online/Download?Uri=4795201&ren=751363&ext=pdf&desc=09_25_00024_EIA+Scoping+Opinion&archive=false",
            "source_date": "2026-02-10",
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "mva": []
      },
      "capacity_display": "Grid: 500 MW applicant-reported offer; date conflict",
      "map_caption_lines": [
        "Grid: 500 MW applicant-reported offer; date conflict"
      ],
      "capacity_notes": [],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/V9-SOMERSET-HORSEY",
      "citation_text": "ElecTrace (2026-10-14). Somerset Data Centre / Horsey Level. UK Data Centre Planning Database, version 1.0.0, project record V9-SOMERSET-HORSEY. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/V9-SOMERSET-HORSEY"
    },
    {
      "project_id": "UK-R3-NORTH-001",
      "name": "Stellium Cobalt Park campus",
      "nation": "England",
      "stage_detail": "operating_with_expansion",
      "stage_label": "Operating site with expansion plans",
      "latitude": 55.03333,
      "longitude": -1.5,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Source project UK-R3-NORTH-001: Stellium Cobalt Park campus. The retained related primary regional record UKN033 identifies Cobalt, North Tyneside in its location field, while UK-R3-NORTH-001 identifies Stellium Cobalt Park. Use North Tyneside administrative-area representative point only; no Newcastle/Shiremoor/North Shields town or campus position inferred. Locality representative point only; no site coordinate inferred.",
      "coordinate_source": "https://www.geonames.org/2641238/",
      "location_label": "North Tyneside",
      "source_urls": [
        "https://aienergyintelligence.co.uk/uk-data-centre-tracker/stellium-cobalt-park",
        "https://stelliumdc.com/ai-growth-zone/",
        "https://www.opencompute.org/documents/ocp-ready-v1-site-assessment-v1-0-rev1-4-stellium-datacenters-dc1-pdf",
        "https://stelliumdc.com/stellium-1/"
      ],
      "source_dates": [
        "2026-01-20"
      ],
      "map_id": 54,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "up to 500 MW conditional scalability vision",
        "unspecified": "",
        "mva": "180 MVA terminal scalability (includes 80 MVA)"
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [
          {
            "category": "grid",
            "value": 80.0,
            "unit": "MW",
            "raw_boundary": "grid_supply_available_campus",
            "qualification": "Legacy headline or directory MW figure conflicts with the operator's technical MVA specification. Not confirmed electrical demand; do not convert or add to MVA figures.",
            "scope": "Stellium Cobalt Park campus",
            "stage": "source-stage unresolved",
            "claim_context": "Conflicting legacy MW observation retained for source transparency; technical apparent-power figures are reported separately",
            "source_record_id": "UK-R3-NORTH-001",
            "source_url": "https://stelliumdc.com/ai-growth-zone/",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          },
          {
            "category": "grid",
            "value": 500.0,
            "unit": "MW",
            "raw_boundary": "conditional_grid_scalability",
            "qualification": "up to; accelerated access aspiration, no signed contract obtained",
            "scope": "campus AIGZ vision",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "OCP13-STELLIUM",
            "source_url": "https://www.opencompute.org/documents/ocp-ready-v1-site-assessment-v1-0-rev1-4-stellium-datacenters-dc1-pdf",
            "source_date": "2026-01-20",
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "unspecified": [
          {
            "category": "unspecified",
            "value": 80.0,
            "unit": "MW",
            "raw_boundary": "definition_not_published",
            "qualification": "Legacy headline or directory MW figure conflicts with the operator's technical MVA specification. Not confirmed electrical demand; do not convert or add to MVA figures.",
            "scope": "Cobalt Data Centre Campus (Stellium)",
            "stage": "source-stage unresolved",
            "claim_context": "Conflicting legacy MW observation retained for source transparency; technical apparent-power figures are reported separately",
            "source_record_id": "AEIUK-006",
            "source_url": "https://aienergyintelligence.co.uk/uk-data-centre-tracker/stellium-cobalt-park",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          },
          {
            "category": "unspecified",
            "value": 180.0,
            "unit": "MW",
            "raw_boundary": "future_scalability_upper_capacity",
            "qualification": "Legacy headline or directory MW figure conflicts with the operator's technical MVA specification. Not confirmed electrical demand; do not convert or add to MVA figures.",
            "scope": "unspecified",
            "stage": "source-stage unresolved",
            "claim_context": "Conflicting legacy MW observation retained for source transparency; technical apparent-power figures are reported separately",
            "source_record_id": "UK-R3-NORTH-001",
            "source_url": "https://stelliumdc.com/ai-growth-zone/",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "mva": [
          {
            "category": "mva",
            "value": 80.0,
            "unit": "MVA",
            "raw_boundary": "campus_electrical_apparent_power",
            "qualification": "current campus specification; headline80MW conflicts",
            "scope": "four20MVAfeeds",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "OCP13-STELLIUM-MVA",
            "source_url": "https://stelliumdc.com/stellium-1/",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          },
          {
            "category": "mva",
            "value": 180.0,
            "unit": "MVA",
            "raw_boundary": "campus_electrical_apparent_scalability",
            "qualification": "not80+180; headline180MW conflicts",
            "scope": "terminal expansion",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "OCP13-STELLIUM-MVA",
            "source_url": "https://stelliumdc.com/stellium-1/",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          }
        ]
      },
      "capacity_display": "Grid: up to 500 MW conditional scalability vision; MVA: 180 MVA terminal scalability (includes 80 MVA)",
      "map_caption_lines": [
        "Grid: up to 500 MW conditional scalability vision",
        "MVA: 180 MVA terminal scalability (includes 80 MVA)"
      ],
      "capacity_notes": [
        "IT capacity qualification: existing dc1.",
        "Includes existing facilities or conditional expansion: disclosed campus capacity is not remaining new-build demand; no subtraction is inferred."
      ],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [
        {
          "category": "facility",
          "value": 30.0,
          "unit": "MW",
          "raw_boundary": "facility_electrical_dc1_existing",
          "qualification": "self assessment; not new campus increment",
          "scope": "DC1 building, within campus",
          "stage": "operating_component",
          "claim_context": "Existing or completed capacity; not additional planned demand",
          "source_record_id": "OCP13-STELLIUM",
          "source_url": "https://www.opencompute.org/documents/ocp-ready-v1-site-assessment-v1-0-rev1-4-stellium-datacenters-dc1-pdf",
          "source_date": "2026-01-20",
          "preferred_for_display": false,
          "additive": false
        },
        {
          "category": "it",
          "value": 25.0,
          "unit": "MW",
          "raw_boundary": "it_load",
          "qualification": "included within30",
          "scope": "DC1 building",
          "stage": "source-stage unresolved",
          "claim_context": "Existing or completed capacity; not additional planned demand",
          "source_record_id": "OCP13-STELLIUM",
          "source_url": "https://www.opencompute.org/documents/ocp-ready-v1-site-assessment-v1-0-rev1-4-stellium-datacenters-dc1-pdf",
          "source_date": "2026-01-20",
          "preferred_for_display": false,
          "additive": false
        }
      ],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/UK-R3-NORTH-001",
      "citation_text": "ElecTrace (2026-10-14). Stellium Cobalt Park campus. UK Data Centre Planning Database, version 1.0.0, project record UK-R3-NORTH-001. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UK-R3-NORTH-001"
    },
    {
      "project_id": "MID-ASTON",
      "name": "SUB1 Aston Cross data centre",
      "nation": "England",
      "stage_detail": "planning_permission_reported",
      "stage_label": "Planning permission reported",
      "latitude": 52.497583,
      "longitude": -1.881434,
      "coordinate_precision": "postcode_centroid",
      "coordinate_note": "Public postcode centroid. Not a surveyed site boundary. Multiple postcodes in record; first source location postcode used.",
      "coordinate_source": "https://api.postcodes.io/postcodes/B6%205RQ",
      "location_label": "B6 5RQ",
      "source_urls": [
        "https://eplanning.birmingham.gov.uk/Northgate/PlanningExplorer/Generic/StdDetails.aspx?DAURI=PLANNING&FT=Planning+Application+Details&PARAM0=1347654&PT=Planning+Applications+On-Line&PUBLIC=Y&TYPE=PL%2FPlanningPK.xml&XMLSIDE=%2FNorthgate%2FPlanningExplorer%2FSiteFiles%2FSkins%2FBirmingham%2FMenus%2FPL.xml&XSLT=%2FNorthgate%2FPlanningExplorer%2FSiteFiles%2FSkins%2FBirmingham%2Fxslt%2FPL%2FPLDetails.xslt",
        "https://dso.nationalgrid.co.uk/downloads/15083/data-centre-impact-study2.pdf"
      ],
      "source_dates": [
        "2026-01-16",
        "2025-11"
      ],
      "map_id": 55,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "",
        "unspecified": "19 MW initial / 38 MW potential; historical, basis unresolved",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [],
        "unspecified": [
          {
            "category": "unspecified",
            "value": 19.0,
            "unit": "MW",
            "raw_boundary": "NGED site capacity; IT/grid boundary not defined in cited paragraph",
            "qualification": null,
            "scope": "SUB1 Birmingham capacity disclosure",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "OFFICIAL-SUB1-CAPACITY",
            "source_url": "https://dso.nationalgrid.co.uk/downloads/15083/data-centre-impact-study2.pdf",
            "source_date": "2025-11",
            "preferred_for_display": false,
            "additive": false
          },
          {
            "category": "unspecified",
            "value": 19.0,
            "unit": "MW",
            "raw_boundary": "NGED unspecified site capacity",
            "qualification": null,
            "scope": "historical initial",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "OFFICIAL-SUB1-CAPACITY",
            "source_url": "https://dso.nationalgrid.co.uk/downloads/15083/data-centre-impact-study2.pdf",
            "source_date": "2025-11",
            "preferred_for_display": false,
            "additive": false
          },
          {
            "category": "unspecified",
            "value": 38.0,
            "unit": "MW",
            "raw_boundary": "NGED unspecified site capacity",
            "qualification": null,
            "scope": "potential ultimate",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "OFFICIAL-SUB1-CAPACITY",
            "source_url": "https://dso.nationalgrid.co.uk/downloads/15083/data-centre-impact-study2.pdf",
            "source_date": "2025-11",
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "mva": []
      },
      "capacity_display": "Reported (basis unknown): 19 MW initial / 38 MW potential; historical, basis unresolved",
      "map_caption_lines": [
        "Reported (basis unknown): 19 MW initial / 38 MW potential;",
        "  historical, basis unresolved"
      ],
      "capacity_notes": [
        "IT audit decision: unresolved; historical pipeline boundary unknown."
      ],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/MID-ASTON",
      "citation_text": "ElecTrace (2026-10-14). SUB1 Aston Cross data centre. UK Data Centre Planning Database, version 1.0.0, project record MID-ASTON. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/MID-ASTON"
    },
    {
      "project_id": "V35-TEESWORKS-FOUNDRY",
      "name": "Teesworks The Foundry data centre and whole-Foundry expansion",
      "nation": "England",
      "stage_detail": "planning_permission_reported",
      "stage_label": "Planning permission reported",
      "latitude": 54.61657,
      "longitude": -1.05999,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "The development name The Foundry was matched to Foundry in Cornwall, hundreds of kilometres from Teesworks. Corrected to the source-named locality; not a site coordinate.",
      "coordinate_source": "https://www.geonames.org/2639563/",
      "location_label": "Redcar",
      "source_urls": [
        "https://nsip-documents.planninginspectorate.gov.uk/published-documents/EN070009-002168-C4-002%20-%20South%20Tees%20Group%20-%20response%20to%20SoS%20re%20H2T%20-%2011%20Sep%202025(33605547.1).pdf"
      ],
      "source_dates": [
        "2025-09-11"
      ],
      "map_id": 56,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "",
        "unspecified": "",
        "mva": "about 1,180 MVA whole Foundry; beyond approved parcel"
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [],
        "unspecified": [],
        "mva": [
          {
            "category": "mva",
            "value": 1180.0,
            "unit": "MVA",
            "raw_boundary": "planned_whole_foundry_electrical_capacity_mva",
            "qualification": "approximate",
            "scope": "Circa capacity achievable across all337.25acre Foundry, including additional planning application; not just approved192.96acre parcel",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "V35-TEESWORKS-FOUNDRY",
            "source_url": "https://nsip-documents.planninginspectorate.gov.uk/published-documents/EN070009-002168-C4-002%20-%20South%20Tees%20Group%20-%20response%20to%20SoS%20re%20H2T%20-%2011%20Sep%202025(33605547.1).pdf",
            "source_date": "2025-09-11",
            "preferred_for_display": false,
            "additive": false
          }
        ]
      },
      "capacity_display": "MVA: about 1,180 MVA whole Foundry; beyond approved parcel",
      "map_caption_lines": [
        "MVA: about 1,180 MVA whole Foundry; beyond approved parcel"
      ],
      "capacity_notes": [
        "1,180 MVA covers the entire Foundry opportunity including future application land, not solely the approved parcel."
      ],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/V35-TEESWORKS-FOUNDRY",
      "citation_text": "ElecTrace (2026-10-14). Teesworks The Foundry data centre and whole-Foundry expansion. UK Data Centre Planning Database, version 1.0.0, project record V35-TEESWORKS-FOUNDRY. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/V35-TEESWORKS-FOUNDRY"
    },
    {
      "project_id": "SOUTH-TVP",
      "name": "Thames Valley Park Data Centre",
      "nation": "England",
      "stage_detail": "pre_application_or_consultation",
      "stage_label": "Pre-application or consultation",
      "latitude": 51.461225,
      "longitude": -0.925986,
      "coordinate_precision": "postcode_centroid",
      "coordinate_note": "Public postcode centroid. Not a surveyed site boundary.",
      "coordinate_source": "https://api.postcodes.io/postcodes/RG6%201WG",
      "location_label": "RG6 1WG",
      "source_urls": [
        "https://www.earley-tc.gov.uk/wp-content/uploads/2026/06/TVPDC-Brochure.pdf",
        "https://www.tvpdc.co.uk/"
      ],
      "source_dates": [
        "2026-06",
        "2026-07"
      ],
      "map_id": 57,
      "capacity_columns": {
        "it": "about 72 MW",
        "facility": "",
        "grid": "",
        "unspecified": "",
        "mva": ""
      },
      "capacity_categories": {
        "it": [
          {
            "category": "it",
            "value": 72.0,
            "unit": "MW",
            "raw_boundary": "it_load",
            "qualification": "circa",
            "scope": "Former Microsoft Campus Reading RG6 1WG; whole proposed site",
            "stage": "consultation_proposal",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "V39-TVP-FUEL-CELL",
            "source_url": "https://www.tvpdc.co.uk/",
            "source_date": "2026-07",
            "preferred_for_display": true,
            "additive": false
          },
          {
            "category": "it",
            "value": 72.0,
            "unit": "MW",
            "raw_boundary": "IT_load",
            "qualification": null,
            "scope": "site",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "SOUTH-TVP",
            "source_url": "https://www.earley-tc.gov.uk/wp-content/uploads/2026/06/TVPDC-Brochure.pdf",
            "source_date": "2026-06",
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "facility": [],
        "grid": [],
        "unspecified": [],
        "mva": []
      },
      "capacity_display": "IT: about 72 MW",
      "map_caption_lines": [
        "IT: about 72 MW"
      ],
      "capacity_notes": [
        "IT capacity qualification: consultation proposal."
      ],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/SOUTH-TVP",
      "citation_text": "ElecTrace (2026-10-14). Thames Valley Park Data Centre. UK Data Centre Planning Database, version 1.0.0, project record SOUTH-TVP. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/SOUTH-TVP"
    },
    {
      "project_id": "GRID8-TILBURY-STATERA",
      "name": "Tilbury Data Centre & Ecology Park / Statera",
      "nation": "England",
      "stage_detail": "planned_or_early_development",
      "stage_label": "Planned or early development",
      "latitude": 51.46248,
      "longitude": 0.35856,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Exact settlement name in source location/project name: Tilbury Data Centre & Ecology Park / Statera",
      "coordinate_source": "https://www.geonames.org/2635836/",
      "location_label": "Tilbury",
      "source_urls": [
        "https://tilburydata.co.uk/",
        "https://tilburydata.co.uk/common-questions"
      ],
      "source_dates": [],
      "map_id": 58,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "",
        "unspecified": "up to 500 MW (basis unresolved)",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [],
        "unspecified": [
          {
            "category": "unspecified",
            "value": 500.0,
            "unit": "MW",
            "raw_boundary": "data_centre_capacity_unspecified",
            "qualification": "up_to",
            "scope": "Up to 500 MW secure digital infrastructure; IT versus facility electrical boundary unstated",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "GRID8-TILBURY-STATERA",
            "source_url": "https://tilburydata.co.uk/",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "mva": []
      },
      "capacity_display": "Reported (basis unknown): up to 500 MW (basis unresolved)",
      "map_caption_lines": [
        "Reported (basis unknown): up to 500 MW (basis unresolved)"
      ],
      "capacity_notes": [],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/GRID8-TILBURY-STATERA",
      "citation_text": "ElecTrace (2026-10-14). Tilbury Data Centre & Ecology Park / Statera. UK Data Centre Planning Database, version 1.0.0, project record GRID8-TILBURY-STATERA. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/GRID8-TILBURY-STATERA"
    },
    {
      "project_id": "SOUTH-TRITAX-CHELMSFORD",
      "name": "Tritax Chelmsford",
      "nation": "England",
      "stage_detail": "planned_or_early_development",
      "stage_label": "Planned or early development",
      "latitude": 51.73575,
      "longitude": 0.46958,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Exact settlement name in source location/project name: Chelmsford, Essex",
      "coordinate_source": "https://www.geonames.org/2653266/",
      "location_label": "Chelmsford",
      "source_urls": [
        "https://dev-tritax-big-box.euwest01.umbraco.io/media/hvxdmbzi/tritax-big-box-h1-2026-results-statement.pdf"
      ],
      "source_dates": [
        "2026-H1",
        "2026-08-05"
      ],
      "map_id": 59,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "125 MW (source-reported initial delivery)",
        "unspecified": "",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [
          {
            "category": "grid",
            "value": 125.0,
            "unit": "MW",
            "raw_boundary": "issuer_claimed_initial_power_delivery",
            "qualification": null,
            "scope": "Current initial site power delivery; future expansion unspecified and excluded. Issuer source, no separately inspected final grid agreement",
            "stage": "source_claimed_initial_delivery",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "CYCLE27-CHELMSFORD-POWER",
            "source_url": "https://dev-tritax-big-box.euwest01.umbraco.io/media/hvxdmbzi/tritax-big-box-h1-2026-results-statement.pdf",
            "source_date": "2026-08-05",
            "preferred_for_display": true,
            "additive": false
          },
          {
            "category": "grid",
            "value": 125.0,
            "unit": "MW",
            "raw_boundary": "source_claimed_power_delivery",
            "qualification": null,
            "scope": "initial_site",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "SOUTH-TRITAX-CHELMSFORD",
            "source_url": "https://dev-tritax-big-box.euwest01.umbraco.io/media/hvxdmbzi/tritax-big-box-h1-2026-results-statement.pdf",
            "source_date": "2026-H1",
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "unspecified": [],
        "mva": []
      },
      "capacity_display": "Grid: 125 MW (source-reported initial delivery)",
      "map_caption_lines": [
        "Grid: 125 MW (source-reported initial delivery)"
      ],
      "capacity_notes": [],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/SOUTH-TRITAX-CHELMSFORD",
      "citation_text": "ElecTrace (2026-10-14). Tritax Chelmsford. UK Data Centre Planning Database, version 1.0.0, project record SOUTH-TRITAX-CHELMSFORD. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/SOUTH-TRITAX-CHELMSFORD"
    },
    {
      "project_id": "UK-REBUILD-NORTH-008",
      "name": "Vortex South Liverpool Data Centre",
      "nation": "England",
      "stage_detail": "construction_reported",
      "stage_label": "Construction reported",
      "latitude": 53.41058,
      "longitude": -2.97794,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Exact settlement name in source location/project name: South Liverpool, near John Lennon Airport",
      "coordinate_source": "https://www.geonames.org/2644210/",
      "location_label": "Liverpool",
      "source_urls": [
        "https://www.vortexdatacentres.co.uk/"
      ],
      "source_dates": [],
      "map_id": 60,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "",
        "unspecified": "",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [],
        "unspecified": [],
        "mva": []
      },
      "capacity_display": "Unknown",
      "map_caption_lines": [
        "Unknown"
      ],
      "capacity_notes": [],
      "capacity_unknown_reason": "No DC planning power capacity disclosed in frozen sources; non-demand equipment/area measures do not fill this gap.",
      "has_planning_or_campus_capacity_disclosure": false,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/UK-REBUILD-NORTH-008",
      "citation_text": "ElecTrace (2026-10-14). Vortex South Liverpool Data Centre. UK Data Centre Planning Database, version 1.0.0, project record UK-REBUILD-NORTH-008. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UK-REBUILD-NORTH-008"
    },
    {
      "project_id": "UK5-WAPSEYS",
      "name": "Wapseys Wood Data Centre Campus",
      "nation": "England",
      "stage_detail": "pre_application_or_consultation",
      "stage_label": "Pre-application or consultation",
      "latitude": 51.58696435846133,
      "longitude": -0.5969701398100106,
      "coordinate_precision": "source_reference_point",
      "coordinate_note": "Original request statement PDF page 23 section 4.3 identifies 497300E,188500N as bisecting DC02. Retrieved 2026-10-14 for geography only; reference point not cadastral boundary.",
      "coordinate_source": "https://assets.publishing.service.gov.uk/media/69b7ece3ba47c264e6c8cfba/Request_Document_-_SDC_M40_Campus_-_Section_35_Direction.pdf",
      "location_label": "Wapseys Wood DC02 reference",
      "source_urls": [
        "https://assets.publishing.service.gov.uk/media/69b7eb62b84f01b2be53a27e/Section_35_Direction_Wapseys_Wood.pdf",
        "https://assets.publishing.service.gov.uk/media/69b7ece3ba47c264e6c8cfba/Request_Document_-_SDC_M40_Campus_-_Section_35_Direction.pdf"
      ],
      "source_dates": [
        "2026-02-27"
      ],
      "map_id": 61,
      "capacity_columns": {
        "it": "up to 300 MW (three buildings; not additive)",
        "facility": "",
        "grid": "",
        "unspecified": "",
        "mva": ""
      },
      "capacity_categories": {
        "it": [
          {
            "category": "it",
            "value": 300.0,
            "unit": "MW",
            "raw_boundary": "it_load",
            "qualification": "approximately_up_to_planned; notwholefacilityelectricaldemand",
            "scope": "up tothreehyperscalebuildings, eachc100MWIT; threecomponentscontainedintotal",
            "stage": "section35_preapplication",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "V39-WAPSEYS-SELFPOWER-BOUNDARIES",
            "source_url": "https://assets.publishing.service.gov.uk/media/69b7ece3ba47c264e6c8cfba/Request_Document_-_SDC_M40_Campus_-_Section_35_Direction.pdf",
            "source_date": "2026-02-27",
            "preferred_for_display": true,
            "additive": false
          },
          {
            "category": "it",
            "value": 300.0,
            "unit": "MW",
            "raw_boundary": "IT",
            "qualification": null,
            "scope": "Wapseys Wood Data Centre Campus",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "UK5-WAPSEYS",
            "source_url": "https://assets.publishing.service.gov.uk/media/69b7eb62b84f01b2be53a27e/Section_35_Direction_Wapseys_Wood.pdf",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          },
          {
            "category": "it",
            "value": 300.0,
            "unit": "MW",
            "raw_boundary": "IT",
            "qualification": null,
            "scope": "ultimate_campus",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "UK5-WAPSEYS",
            "source_url": "https://assets.publishing.service.gov.uk/media/69b7eb62b84f01b2be53a27e/Section_35_Direction_Wapseys_Wood.pdf",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          },
          {
            "category": "it",
            "value": 300.0,
            "unit": "MW",
            "raw_boundary": "it_load",
            "qualification": "approximately_up_to",
            "scope": "Three100MWbuildings; no disclosedwholefacilityMWinthisrequest",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "PLAN11-WAPSEYS-GRID-STATUS",
            "source_url": "https://assets.publishing.service.gov.uk/media/69b7ece3ba47c264e6c8cfba/Request_Document_-_SDC_M40_Campus_-_Section_35_Direction.pdf",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "facility": [],
        "grid": [],
        "unspecified": [],
        "mva": []
      },
      "capacity_display": "IT: up to 300 MW (three buildings; not additive)",
      "map_caption_lines": [
        "IT: up to 300 MW (three buildings; not additive)"
      ],
      "capacity_notes": [
        "IT capacity qualification: section35 preapplication."
      ],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/UK5-WAPSEYS",
      "citation_text": "ElecTrace (2026-10-14). Wapseys Wood Data Centre Campus. UK Data Centre Planning Database, version 1.0.0, project record UK5-WAPSEYS. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UK5-WAPSEYS"
    },
    {
      "project_id": "PLAN11-WLTP-REVISED",
      "name": "West London Technology Park revised two-building scheme",
      "nation": "England",
      "stage_detail": "planning_permission_reported",
      "stage_label": "Planning permission reported",
      "latitude": 51.50853,
      "longitude": -0.12574,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Exact settlement name in source location/project name: West London Technology Park revised two-building scheme",
      "coordinate_source": "https://www.geonames.org/2643743/",
      "location_label": "London",
      "source_urls": [
        "https://www.greystoke.co.uk/data-centres"
      ],
      "source_dates": [],
      "map_id": 62,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "",
        "unspecified": "90 MW (basis unresolved)",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [],
        "unspecified": [
          {
            "category": "unspecified",
            "value": 90.0,
            "unit": "MW",
            "raw_boundary": "data_centre_capacity_unspecified",
            "qualification": "reported",
            "scope": "Currentdeveloperpage90MWtwo-buildings,775000sqftGEA; original150MWthree-buildings isolderversion",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "PLAN11-WLTP-REVISED",
            "source_url": "https://www.greystoke.co.uk/data-centres",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          },
          {
            "category": "unspecified",
            "value": 90.0,
            "unit": "MW",
            "raw_boundary": "unknown_dc_capacity",
            "qualification": "Primary project page does not identify IT versus whole electrical load.",
            "scope": "two-building campus",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "PORT11-WLTP",
            "source_url": "https://www.greystoke.co.uk/data-centres",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "mva": []
      },
      "capacity_display": "Reported (basis unknown): 90 MW (basis unresolved)",
      "map_caption_lines": [
        "Reported (basis unknown): 90 MW (basis unresolved)"
      ],
      "capacity_notes": [],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/PLAN11-WLTP-REVISED",
      "citation_text": "ElecTrace (2026-10-14). West London Technology Park revised two-building scheme. UK Data Centre Planning Database, version 1.0.0, project record PLAN11-WLTP-REVISED. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/PLAN11-WLTP-REVISED"
    },
    {
      "project_id": "UK5-WILTON",
      "name": "Wilton International Data Centre Phase 1",
      "nation": "England",
      "stage_detail": "planning_application_or_reserved_matters",
      "stage_label": "Planning application or reserved matters",
      "latitude": 54.56667,
      "longitude": -1.1,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Source project UK5-WILTON: Wilton, Teesside. Wilton in Teesside/Redcar area; not Wiltshire or other Wiltons. Locality representative point only; no site coordinate inferred.",
      "coordinate_source": "https://www.geonames.org/2633872/",
      "location_label": "Wilton",
      "source_urls": [
        "https://www.sembcorp.com/uk/news-and-insights/news/2026/sembcorp-energy-uk-announces-phase-1-of-wilton-international-data-centre/",
        "https://planning.redcar-cleveland.gov.uk/Document/Download?module=PLA&recordNumber=86735&planId=757537&imageId=84&isPlan=False&fileName=Planning%20Statement%20-%20amended%20scheme%20%28FINAL%29%20010926.pdf",
        "https://planning.redcar-cleveland.gov.uk/Document/Download?module=PLA&recordNumber=86735&planId=746740&imageId=33&isPlan=False&fileName=Consultee%20Response%20National%20grid.pdf"
      ],
      "source_dates": [
        "2026-09-01",
        "2026-05-20"
      ],
      "map_id": 63,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "",
        "unspecified": "280 MW (basis unresolved)",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [],
        "unspecified": [
          {
            "category": "unspecified",
            "value": 280.0,
            "unit": "MW",
            "raw_boundary": "unspecified",
            "qualification": null,
            "scope": "Wilton International Data Centre Phase 1",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "UK5-WILTON",
            "source_url": "https://www.sembcorp.com/uk/news-and-insights/news/2026/sembcorp-energy-uk-announces-phase-1-of-wilton-international-data-centre/",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          },
          {
            "category": "unspecified",
            "value": 280.0,
            "unit": "MW",
            "raw_boundary": "unspecified",
            "qualification": null,
            "scope": "phase_1",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "UK5-WILTON",
            "source_url": "https://www.sembcorp.com/uk/news-and-insights/news/2026/sembcorp-energy-uk-announces-phase-1-of-wilton-international-data-centre/",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "mva": []
      },
      "capacity_display": "Reported (basis unknown): 280 MW (basis unresolved)",
      "map_caption_lines": [
        "Reported (basis unknown): 280 MW (basis unresolved)"
      ],
      "capacity_notes": [],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/UK5-WILTON",
      "citation_text": "ElecTrace (2026-10-14). Wilton International Data Centre Phase 1. UK Data Centre Planning Database, version 1.0.0, project record UK5-WILTON. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UK5-WILTON"
    },
    {
      "project_id": "UKS011",
      "name": "Yondr Slough campus",
      "nation": "England",
      "stage_detail": "operating_with_expansion",
      "stage_label": "Operating site with expansion plans",
      "latitude": 51.513443,
      "longitude": -0.580881,
      "coordinate_precision": "postcode_centroid",
      "coordinate_note": "Postcode centroid used as an approximate reference for the grouped campus; not a surveyed building location or site boundary.",
      "coordinate_source": "https://api.postcodes.io/postcodes",
      "location_label": "LON1X2, Wexham Road, Slough",
      "source_urls": [
        "https://www.yondrgroup.com/newsroom/press-release/yondrs-first-data-center-on-london-campus-is-ready-for-service/"
      ],
      "source_dates": [
        "2024-07-22"
      ],
      "map_id": 64,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "",
        "unspecified": "30 MW building (2024); >100 MW campus incl. existing",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [],
        "unspecified": [
          {
            "category": "unspecified",
            "value": 100.0,
            "unit": "MW",
            "raw_boundary": "campus_lower_bound_unspecified",
            "qualification": "Reported as more than 100 MW for the campus, including existing capacity; current remaining development capacity unresolved.",
            "scope": "Yondr Slough campus",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "UKS011",
            "source_url": "https://www.yondrgroup.com/newsroom/press-release/yondrs-first-data-center-on-london-campus-is-ready-for-service/",
            "source_date": "2024-07-22",
            "preferred_for_display": false,
            "additive": false
          },
          {
            "category": "unspecified",
            "value": 30,
            "unit": "MW",
            "raw_boundary": "dc_building_capacity_unspecified",
            "qualification": null,
            "scope": "Second building reported under construction in July 2024; current remainder unverified",
            "stage": "historical 2024 construction",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "UKS011",
            "source_url": "https://www.yondrgroup.com/newsroom/press-release/yondrs-first-data-center-on-london-campus-is-ready-for-service/",
            "source_date": "2024-07-22",
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "mva": []
      },
      "capacity_display": "Reported (basis unknown): 30 MW building (2024); >100 MW campus incl. existing",
      "map_caption_lines": [
        "Reported (basis unknown): 30 MW building (2024); >100 MW",
        "  campus incl. existing"
      ],
      "capacity_notes": [
        "Includes existing facilities or conditional expansion: disclosed campus capacity is not remaining new-build demand; no subtraction is inferred."
      ],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/UKS011",
      "citation_text": "ElecTrace (2026-10-14). Yondr Slough campus. UK Data Centre Planning Database, version 1.0.0, project record UKS011. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UKS011"
    },
    {
      "project_id": "UKN023",
      "name": "GreenScale Derry Campus",
      "nation": "Northern Ireland",
      "stage_detail": "planned_or_early_development",
      "stage_label": "Planned or early development",
      "latitude": 54.9981,
      "longitude": -7.30934,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Exact settlement name in source location/project name: Foyle Port, Derry/Londonderry",
      "coordinate_source": "https://www.geonames.org/2643736/",
      "location_label": "Derry",
      "source_urls": [
        "https://greenscaledc.com/data-centres/",
        "https://aienergyintelligence.co.uk/uk-data-centre-tracker/atlantic-hub-foyle-port",
        "https://greenscaledc.com/insights/greenscale-new-data-centre-platform/"
      ],
      "source_dates": [],
      "map_id": 65,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "100 MW source-claimed secured connection",
        "unspecified": "",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [
          {
            "category": "grid",
            "value": 100.0,
            "unit": "MW",
            "raw_boundary": "secured_grid_connections",
            "qualification": null,
            "scope": "GreenScale Derry Campus",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "UKN023",
            "source_url": "https://greenscaledc.com/data-centres/",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          },
          {
            "category": "grid",
            "value": 100.0,
            "unit": "MW",
            "raw_boundary": "secured_grid_connections_campus",
            "qualification": null,
            "scope": "GreenScale Derry Campus",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "UK-R3-FOYLE-IDENTITY-001",
            "source_url": "https://greenscaledc.com/insights/greenscale-new-data-centre-platform/",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "unspecified": [],
        "mva": []
      },
      "capacity_display": "Grid: 100 MW source-claimed secured connection",
      "map_caption_lines": [
        "Grid: 100 MW source-claimed secured connection"
      ],
      "capacity_notes": [
        "170 MW Derry+Donegal cross-border total and unadopted 305 MW catalogue claim are excluded; Northern Ireland is outside the GB benchmark."
      ],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/UKN023",
      "citation_text": "ElecTrace (2026-10-14). GreenScale Derry Campus. UK Data Centre Planning Database, version 1.0.0, project record UKN023. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UKN023"
    },
    {
      "project_id": "UKN024",
      "name": "Kilroot Data Centre",
      "nation": "Northern Ireland",
      "stage_detail": "connection_offer_or_development",
      "stage_label": "Connection offer or development",
      "latitude": 54.728,
      "longitude": -5.756,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Source project UKN024: Kilroot, County Antrim. Kilroot, County Antrim, Northern Ireland. Locality representative point only; no site coordinate inferred.",
      "coordinate_source": "https://www.geonames.org/2645553/",
      "location_label": "Kilroot",
      "source_urls": [
        "https://www.uregni.gov.uk/files/uregni/documents/2024-11/2024.11.15%20Kilroot%20DC%20DL.pdf"
      ],
      "source_dates": [
        "2024-11-15"
      ],
      "map_id": 66,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "300 MW MIC application",
        "unspecified": "",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [
          {
            "category": "grid",
            "value": 300.0,
            "unit": "MW",
            "raw_boundary": "MIC_connection_application",
            "qualification": null,
            "scope": "Kilroot Data Centre",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "UKN024",
            "source_url": "https://www.uregni.gov.uk/files/uregni/documents/2024-11/2024.11.15%20Kilroot%20DC%20DL.pdf",
            "source_date": "2024-11-15",
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "unspecified": [],
        "mva": []
      },
      "capacity_display": "Grid: 300 MW MIC application",
      "map_caption_lines": [
        "Grid: 300 MW MIC application"
      ],
      "capacity_notes": [],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/UKN024",
      "citation_text": "ElecTrace (2026-10-14). Kilroot Data Centre. UK Data Centre Planning Database, version 1.0.0, project record UKN024. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UKN024"
    },
    {
      "project_id": "UKN007",
      "name": "Aurelius Data Centre",
      "nation": "Scotland",
      "stage_detail": "pre_application_or_consultation",
      "stage_label": "Pre-application or consultation",
      "latitude": 55.81667,
      "longitude": -3.86667,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Source project UKN007: Newhouse, North Lanrigg Farm, North Lanarkshire. Newhouse, North Lanarkshire; the farm parcel is not geocoded. Locality representative point only; no site coordinate inferred.",
      "coordinate_source": "https://www.geonames.org/2641632/",
      "location_label": "Newhouse",
      "source_urls": [
        "https://uk.linkedin.com/company/ili-group",
        "https://aprs.scot/wp-content/uploads/2026/07/26_00595_EIASCR-EIA_SCREENING_REQUEST-2012718.pdf",
        "https://www.neso.energy/document/373996/download",
        "https://eplanning.northlanarkshire.gov.uk/online-applications/files/AC78A0B9CAB36CD9C65A97CECCE73F2C/pdf/26_00595_EIASCR-LOCATION_PLAN_INCLUDING_GRID_CONNECTION_AREA-2026255.pdf",
        "https://aprs.scot/newhouse-dc/"
      ],
      "source_dates": [
        "2026-05",
        "2026-06-03"
      ],
      "map_id": 67,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "",
        "unspecified": "400 MW reported / queue; basis unresolved",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [],
        "unspecified": [
          {
            "category": "unspecified",
            "value": 400.0,
            "unit": "MW",
            "raw_boundary": "secondary_report_unspecified",
            "qualification": null,
            "scope": "unspecified",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "UKN007",
            "source_url": "https://aprs.scot/newhouse-dc/",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          },
          {
            "category": "unspecified",
            "value": 400.0,
            "unit": "MW",
            "raw_boundary": "ea_associated_installed_capacity",
            "qualification": "MW unit from NESO explanatory FOI, not added to original XLSX raw field",
            "scope": "Customer/DNO supplied queue-item capacity, possibly stage or technology element; not certified maximum import",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "CYCLE25-EA-001079",
            "source_url": "https://www.neso.energy/document/373996/download",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "mva": []
      },
      "capacity_display": "Reported (basis unknown): 400 MW reported / queue; basis unresolved",
      "map_caption_lines": [
        "Reported (basis unknown): 400 MW reported / queue; basis",
        "  unresolved"
      ],
      "capacity_notes": [],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/UKN007",
      "citation_text": "ElecTrace (2026-10-14). Aurelius Data Centre. UK Data Centre Planning Database, version 1.0.0, project record UKN007. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UKN007"
    },
    {
      "project_id": "UKN017",
      "name": "Blackdog AI Campus",
      "nation": "Scotland",
      "stage_detail": "pre_application_or_consultation",
      "stage_label": "Pre-application or consultation",
      "latitude": 57.227043181345294,
      "longitude": -2.0618589102234397,
      "coordinate_precision": "source_reference_point",
      "coordinate_note": "Source British National Grid reference E396364 N815147; not a surveyed connection point.",
      "coordinate_source": "https://www.parliament.scot/chamber-and-committees/official-report/search-what-was-said-in-parliament/meeting-of-parliament-16-09-2026?iob=225784&meeting=20229",
      "location_label": "Blackdog",
      "source_urls": [
        "https://aberdeenbusinessnews.co.uk/blackdog-poised-for-multi-billion-pound-data-centre/",
        "https://aberdeenshire.moderngov.co.uk/Data/Formartine%20Area%20Committee/20210119/Agenda/2021%2001%2019%20Item%204A%20-%20APP-2020-0349.pdf",
        "https://tarvescommunitycouncil.wordpress.com/wp-content/uploads/2026/05/2026-05-25-weekly-list-of-planning-applications-e28093-formartine.pdf",
        "https://www.parliament.scot/chamber-and-committees/official-report/search-what-was-said-in-parliament/meeting-of-parliament-16-09-2026?iob=225784&meeting=20229"
      ],
      "source_dates": [
        "2026-04-20",
        "2021-01-19",
        "2026-05-25",
        "2026-09-16"
      ],
      "map_id": 68,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "",
        "unspecified": "600 MW initial renewable-plus-grid claim; basis unresolved",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [],
        "unspecified": [
          {
            "category": "unspecified",
            "value": 600.0,
            "unit": "MW",
            "raw_boundary": "reported_initial_power_renewable_and_grid",
            "qualification": null,
            "scope": "Blackdog AI Campus",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "UKN017",
            "source_url": "https://aberdeenbusinessnews.co.uk/blackdog-poised-for-multi-billion-pound-data-centre/",
            "source_date": "2026-04-20",
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "mva": []
      },
      "capacity_display": "Reported (basis unknown): 600 MW initial renewable-plus-grid claim; basis unresolved",
      "map_caption_lines": [
        "Reported (basis unknown): 600 MW initial renewable-plus-grid",
        "  claim; basis unresolved"
      ],
      "capacity_notes": [],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/UKN017",
      "citation_text": "ElecTrace (2026-10-14). Blackdog AI Campus. UK Data Centre Planning Database, version 1.0.0, project record UKN017. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UKN017"
    },
    {
      "project_id": "UKN005",
      "name": "Cato Data Centre",
      "nation": "Scotland",
      "stage_detail": "planning_application_or_reserved_matters",
      "stage_label": "Planning application or reserved matters",
      "latitude": 56.10292,
      "longitude": -3.25976,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Source project UKN005: Auchtertool, Fife. Source states Auchtertool, Fife. Locality representative point only; no site coordinate inferred.",
      "coordinate_source": "https://www.geonames.org/2656797/",
      "location_label": "Auchtertool",
      "source_urls": [
        "https://graemenicholls.com/cato-data-centre",
        "https://cato.ili-energy.com/wp-content/uploads/2026/07/C.-Cato-Energy.pdf",
        "https://cato.ili-energy.com/wp-content/uploads/2026/07/O.-Cato-Supporting-Document.pdf",
        "https://datacentrereview.com/2026/06/ili-group-submits-plans-for-5bn-fife-ai-data-centre/",
        "https://www.neso.energy/document/373996/download"
      ],
      "source_dates": [
        "2026",
        "2026-04",
        "2026-06-05"
      ],
      "map_id": 69,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "600 MW (secondary report)",
        "unspecified": "",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [
          {
            "category": "grid",
            "value": 600.0,
            "unit": "MW",
            "raw_boundary": "reported_grid_connection_capacity",
            "qualification": "exact",
            "scope": "Industry report attributes600MW maximum grid connection and Gate2position to ILI; primary offer does not independently supply numericMW",
            "stage": "secondary_connection_report",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "BOUND10-CATO-GRID-REPORT",
            "source_url": "https://datacentrereview.com/2026/06/ili-group-submits-plans-for-5bn-fife-ai-data-centre/",
            "source_date": "2026-06-05",
            "preferred_for_display": true,
            "additive": false
          }
        ],
        "unspecified": [
          {
            "category": "unspecified",
            "value": 600.0,
            "unit": "MW",
            "raw_boundary": "campus_unspecified",
            "qualification": null,
            "scope": "Cato Data Centre",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "UKN005",
            "source_url": "https://graemenicholls.com/cato-data-centre",
            "source_date": "2026",
            "preferred_for_display": false,
            "additive": false
          },
          {
            "category": "unspecified",
            "value": 600.0,
            "unit": "MW",
            "raw_boundary": "ea_associated_installed_capacity",
            "qualification": "MW unit from NESO explanatory FOI, not added to original XLSX raw field",
            "scope": "Customer/DNO supplied queue-item capacity, possibly stage or technology element; not certified maximum import",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "CYCLE25-EA-001078",
            "source_url": "https://www.neso.energy/document/373996/download",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "mva": []
      },
      "capacity_display": "Grid: 600 MW (secondary report)",
      "map_caption_lines": [
        "Grid: 600 MW (secondary report)"
      ],
      "capacity_notes": [],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/UKN005",
      "citation_text": "ElecTrace (2026-10-14). Cato Data Centre. UK Data Centre Planning Database, version 1.0.0, project record UKN005. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UKN005"
    },
    {
      "project_id": "UKN008",
      "name": "Chapelcross CX Technology Campus",
      "nation": "Scotland",
      "stage_detail": "pre_application_or_consultation",
      "stage_label": "Pre-application or consultation",
      "latitude": 55.01667,
      "longitude": -3.21667,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Source project UKN008: Chapelcross, Dumfries and Galloway. Chapelcross geographic locality (GeoNames LCTY), not a nuclear power station equipment point. Locality representative point only; no site coordinate inferred.",
      "coordinate_source": "https://www.geonames.org/2653369/",
      "location_label": "Chapelcross",
      "source_urls": [
        "https://www.gov.uk/government/news/nda-working-with-private-developer-to-accelerate-chapelcross-hub",
        "https://aprs.scot/wp-content/uploads/2026/08/26_0464_SCO-Scoping_Report-1739565.pdf"
      ],
      "source_dates": [
        "2025-11-19",
        "2026-03-20"
      ],
      "map_id": 70,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "",
        "unspecified": "up to 1,000 MW campus potential; basis unresolved",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [],
        "unspecified": [
          {
            "category": "unspecified",
            "value": 1000.0,
            "unit": "MW",
            "raw_boundary": "campus_potential_unspecified",
            "qualification": null,
            "scope": "Chapelcross CX Technology Campus",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "UKN008",
            "source_url": "https://www.gov.uk/government/news/nda-working-with-private-developer-to-accelerate-chapelcross-hub",
            "source_date": "2025-11-19",
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "mva": []
      },
      "capacity_display": "Reported (basis unknown): up to 1,000 MW campus potential; basis unresolved",
      "map_caption_lines": [
        "Reported (basis unknown): up to 1,000 MW campus potential;",
        "  basis unresolved"
      ],
      "capacity_notes": [],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/UKN008",
      "citation_text": "ElecTrace (2026-10-14). Chapelcross CX Technology Campus. UK Data Centre Planning Database, version 1.0.0, project record UKN008. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UKN008"
    },
    {
      "project_id": "UKR004-COCKENZIE",
      "name": "Cockenzie data centre",
      "nation": "Scotland",
      "stage_detail": "pre_application_or_consultation",
      "stage_label": "Pre-application or consultation",
      "latitude": 55.96823,
      "longitude": -2.96562,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Source project UKR004-COCKENZIE: Cockenzie data centre. Project name explicitly identifies Cockenzie, East Lothian. Locality representative point only; no site coordinate inferred.",
      "coordinate_source": "https://www.geonames.org/2652681/",
      "location_label": "Cockenzie",
      "source_urls": [
        "https://aprs.scot/cockenzie/",
        "https://www.eastlothian.gov.uk/sites/default/files/2026-08/ELC20260825%2012%20Data%20Centre%20at%20Cockenzie_0.pdf"
      ],
      "source_dates": [
        "2026-08-25"
      ],
      "map_id": 71,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "",
        "unspecified": "200 MW (basis unresolved)",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [],
        "unspecified": [
          {
            "category": "unspecified",
            "value": 200.0,
            "unit": "MW",
            "raw_boundary": "secondary_report_unspecified",
            "qualification": null,
            "scope": "Cockenzie data centre",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "UKR004-COCKENZIE",
            "source_url": "https://aprs.scot/cockenzie/",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          },
          {
            "category": "unspecified",
            "value": 200.0,
            "unit": "MW",
            "raw_boundary": "dc_halls_capacity_unspecified",
            "qualification": "Official proposal size. Halls terminology and facility prose do not explicitly define IT vs full-site electrical vs contracted import. Grid/private-wire routes still being explored; no signed importMW obtained.",
            "scope": "proposed data centre halls / indicative full build-out; same project size, not additive",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "CYCLE18-COCKENZIE-COUNCIL",
            "source_url": "https://www.eastlothian.gov.uk/sites/default/files/2026-08/ELC20260825%2012%20Data%20Centre%20at%20Cockenzie_0.pdf",
            "source_date": "2026-08-25",
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "mva": []
      },
      "capacity_display": "Reported (basis unknown): 200 MW (basis unresolved)",
      "map_caption_lines": [
        "Reported (basis unknown): 200 MW (basis unresolved)"
      ],
      "capacity_notes": [],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/UKR004-COCKENZIE",
      "citation_text": "ElecTrace (2026-10-14). Cockenzie data centre. UK Data Centre Planning Database, version 1.0.0, project record UKR004-COCKENZIE. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UKR004-COCKENZIE"
    },
    {
      "project_id": "P028",
      "name": "Coldstream data center campus",
      "nation": "Scotland",
      "stage_detail": "pre_application_or_consultation",
      "stage_label": "Pre-application or consultation",
      "latitude": 55.65111,
      "longitude": -2.25295,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Source project P028: North and east of Stainrigg Mains Farm. Coldstream in Scottish Borders; locality point does not identify Stainrigg Mains Farm parcel. Locality representative point only; no site coordinate inferred.",
      "coordinate_source": "https://www.geonames.org/2652601/",
      "location_label": "Coldstream",
      "source_urls": [
        "https://bebeez.eu/2025/07/11/apatura-files-for-300mw-data-center-campus-in-scotland/"
      ],
      "source_dates": [],
      "map_id": 72,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "",
        "unspecified": "300 MW (basis unresolved)",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [],
        "unspecified": [
          {
            "category": "unspecified",
            "value": 300.0,
            "unit": "MW",
            "raw_boundary": "Data center buildings capacity",
            "qualification": null,
            "scope": "Coldstream data center campus",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "P028",
            "source_url": "https://bebeez.eu/2025/07/11/apatura-files-for-300mw-data-center-campus-in-scotland/",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          },
          {
            "category": "unspecified",
            "value": 300.0,
            "unit": "MW",
            "raw_boundary": "Data center buildings capacity",
            "qualification": null,
            "scope": "69-hectare greenfield proposal",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "P028",
            "source_url": "https://bebeez.eu/2025/07/11/apatura-files-for-300mw-data-center-campus-in-scotland/",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "mva": []
      },
      "capacity_display": "Reported (basis unknown): 300 MW (basis unresolved)",
      "map_caption_lines": [
        "Reported (basis unknown): 300 MW (basis unresolved)"
      ],
      "capacity_notes": [],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/P028",
      "citation_text": "ElecTrace (2026-10-14). Coldstream data center campus. UK Data Centre Planning Database, version 1.0.0, project record P028. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/P028"
    },
    {
      "project_id": "UKN015",
      "name": "Drumshangie Data Centre",
      "nation": "Scotland",
      "stage_detail": "pre_application_or_consultation",
      "stage_label": "Pre-application or consultation",
      "latitude": 55.91371,
      "longitude": -3.94164,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Source project UKN015: Drumshangie / Greengairs, North Lanarkshire. Source states Drumshangie / Greengairs, North Lanarkshire; use Greengairs locality. Locality representative point only; no site coordinate inferred.",
      "coordinate_source": "https://www.geonames.org/12264044/",
      "location_label": "Greengairs",
      "source_urls": [
        "https://aprs.scot/drumshangie-dc/"
      ],
      "source_dates": [],
      "map_id": 73,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "500 MW (secondary application report)",
        "unspecified": "",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [
          {
            "category": "grid",
            "value": 500.0,
            "unit": "MW",
            "raw_boundary": "reported_grid_application",
            "qualification": null,
            "scope": "Drumshangie Data Centre",
            "stage": "secondary_application",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "UKN015",
            "source_url": "https://aprs.scot/drumshangie-dc/",
            "source_date": null,
            "preferred_for_display": true,
            "additive": false
          }
        ],
        "unspecified": [],
        "mva": []
      },
      "capacity_display": "Grid: 500 MW (secondary application report)",
      "map_caption_lines": [
        "Grid: 500 MW (secondary application report)"
      ],
      "capacity_notes": [],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/UKN015",
      "citation_text": "ElecTrace (2026-10-14). Drumshangie Data Centre. UK Data Centre Planning Database, version 1.0.0, project record UKN015. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UKN015"
    },
    {
      "project_id": "UKN003",
      "name": "Freeport Data Centre Campus",
      "nation": "Scotland",
      "stage_detail": "pre_application_or_consultation",
      "stage_label": "Pre-application or consultation",
      "latitude": 55.85188,
      "longitude": -3.56981,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Source project UKN003: Freeport Leisure Village, West Calder, West Lothian. West Calder, West Lothian. Locality representative point only; no site coordinate inferred.",
      "coordinate_source": "https://www.geonames.org/2634477/",
      "location_label": "West Calder",
      "source_urls": [
        "https://consult.apatura.energy/freeport/the-project",
        "https://145830797.fs1.hubspotusercontent-eu1.net/hubfs/145830797/Freeport_WL_EIA%20Graphic%20V2.pdf"
      ],
      "source_dates": [],
      "map_id": 74,
      "capacity_columns": {
        "it": "",
        "facility": "250 MW demand design",
        "grid": "250 MW shared DC/BESS connection; allocation unresolved",
        "unspecified": "",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [
          {
            "category": "facility",
            "value": 250.0,
            "unit": "MW",
            "raw_boundary": "demand_capacity",
            "qualification": "design/source disclosed demand, not certified netnew",
            "scope": "Data centre demand in Glic economic summary",
            "stage": "design",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "V35-FREEPORT-DEMAND-GRID",
            "source_url": "https://145830797.fs1.hubspotusercontent-eu1.net/hubfs/145830797/Freeport_WL_EIA%20Graphic%20V2.pdf",
            "source_date": null,
            "preferred_for_display": true,
            "additive": false
          }
        ],
        "grid": [
          {
            "category": "grid",
            "value": 250.0,
            "unit": "MW",
            "raw_boundary": "shared_campus_grid_connection_allocation_unresolved",
            "qualification": "not additive to demand; no standalone DC MIC verified",
            "scope": "Same summary grid label alongside DC+BESS scheme; exact separate rights not shown",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "V35-FREEPORT-DEMAND-GRID",
            "source_url": "https://145830797.fs1.hubspotusercontent-eu1.net/hubfs/145830797/Freeport_WL_EIA%20Graphic%20V2.pdf",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "unspecified": [
          {
            "category": "unspecified",
            "value": 250.0,
            "unit": "MW",
            "raw_boundary": "campus_unspecified",
            "qualification": null,
            "scope": "Freeport Data Centre Campus",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "UKN003",
            "source_url": "https://consult.apatura.energy/freeport/the-project",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "mva": []
      },
      "capacity_display": "Facility: 250 MW demand design; Grid: 250 MW shared DC/BESS connection; allocation unresolved",
      "map_caption_lines": [
        "Facility: 250 MW demand design",
        "Grid: 250 MW shared DC/BESS connection; allocation",
        "  unresolved"
      ],
      "capacity_notes": [
        "Facility boundary: demand_capacity; design."
      ],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/UKN003",
      "citation_text": "ElecTrace (2026-10-14). Freeport Data Centre Campus. UK Data Centre Planning Database, version 1.0.0, project record UKN003. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UKN003"
    },
    {
      "project_id": "UKN009",
      "name": "Haspielaw Farm Data Centre Campus",
      "nation": "Scotland",
      "stage_detail": "pre_application_or_consultation",
      "stage_label": "Pre-application or consultation",
      "latitude": 55.76667,
      "longitude": -4.03333,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Source project UKN009: Haspielaw Farm, Muttonhole Road, Hamilton, South Lanarkshire. Hamilton, South Lanarkshire; Haspielaw Farm parcel is not geocoded. Locality representative point only; no site coordinate inferred.",
      "coordinate_source": "https://www.geonames.org/2647570/",
      "location_label": "Hamilton",
      "source_urls": [
        "https://www.dpea.scotland.gov.uk/CaseDetails.aspx?T=20&id=126803",
        "https://aienergyintelligence.co.uk/uk-data-centre-tracker/haspielaw-farm-hamilton"
      ],
      "source_dates": [
        "2025-07-18"
      ],
      "map_id": 75,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "",
        "unspecified": "",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [],
        "unspecified": [],
        "mva": []
      },
      "capacity_display": "Unknown",
      "map_caption_lines": [
        "Unknown"
      ],
      "capacity_notes": [],
      "capacity_unknown_reason": "No DC planning power capacity disclosed in frozen sources; non-demand equipment/area measures do not fill this gap.",
      "has_planning_or_campus_capacity_disclosure": false,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/UKN009",
      "citation_text": "ElecTrace (2026-10-14). Haspielaw Farm Data Centre Campus. UK Data Centre Planning Database, version 1.0.0, project record UKN009. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UKN009"
    },
    {
      "project_id": "UKR004-DV4",
      "name": "HFD DV4 Lancaster Avenue Chapelhall",
      "nation": "Scotland",
      "stage_detail": "pre_application_or_consultation",
      "stage_label": "Pre-application or consultation",
      "latitude": 55.84349,
      "longitude": -3.94881,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Source project UKR004-DV4: HFD DV4 Lancaster Avenue Chapelhall. Project name explicitly identifies Chapelhall, North Lanarkshire. Locality representative point only; no site coordinate inferred.",
      "coordinate_source": "https://www.geonames.org/2653366/",
      "location_label": "Chapelhall",
      "source_urls": [
        "https://www.hfdgroup.com/dv4"
      ],
      "source_dates": [],
      "map_id": 76,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "",
        "unspecified": "",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [],
        "unspecified": [],
        "mva": []
      },
      "capacity_display": "Unknown",
      "map_caption_lines": [
        "Unknown"
      ],
      "capacity_notes": [],
      "capacity_unknown_reason": "No DC planning power capacity disclosed in frozen sources; non-demand equipment/area measures do not fill this gap.",
      "has_planning_or_campus_capacity_disclosure": false,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/UKR004-DV4",
      "citation_text": "ElecTrace (2026-10-14). HFD DV4 Lancaster Avenue Chapelhall. UK Data Centre Planning Database, version 1.0.0, project record UKR004-DV4. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UKR004-DV4"
    },
    {
      "project_id": "UKR004-DV6",
      "name": "HFD DV6 South Lanridge Farm",
      "nation": "Scotland",
      "stage_detail": "pre_application_or_consultation",
      "stage_label": "Pre-application or consultation",
      "latitude": null,
      "longitude": null,
      "coordinate_precision": "unlocated",
      "coordinate_note": "",
      "coordinate_source": null,
      "location_label": "",
      "source_urls": [
        "https://aprs.scot/chapelhall-ai-growth-zone/"
      ],
      "source_dates": [],
      "map_id": 77,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "",
        "unspecified": "",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [],
        "unspecified": [],
        "mva": []
      },
      "capacity_display": "Unknown",
      "map_caption_lines": [
        "Unknown"
      ],
      "capacity_notes": [],
      "capacity_unknown_reason": "No DC planning power capacity disclosed in frozen sources; non-demand equipment/area measures do not fill this gap.",
      "has_planning_or_campus_capacity_disclosure": false,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/UKR004-DV6",
      "citation_text": "ElecTrace (2026-10-14). HFD DV6 South Lanridge Farm. UK Data Centre Planning Database, version 1.0.0, project record UKR004-DV6. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UKR004-DV6"
    },
    {
      "project_id": "UKN010",
      "name": "Hunterston Data Centre",
      "nation": "Scotland",
      "stage_detail": "pre_application_or_consultation",
      "stage_label": "Pre-application or consultation",
      "latitude": 55.69004,
      "longitude": -4.85771,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Source project UKN010: Hunterston, North Ayrshire. The retained UKN010 aliases field explicitly lists West Kilbride, while its location is Hunterston, North Ayrshire; this is the nearby locality proxy, not the Hunterston campus footprint. Locality representative point only; no site coordinate inferred.",
      "coordinate_source": "https://www.geonames.org/2634378/",
      "location_label": "West Kilbride",
      "source_urls": [
        "https://eneusenergy.com/hunterston"
      ],
      "source_dates": [],
      "map_id": 78,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "",
        "unspecified": "",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [],
        "unspecified": [],
        "mva": []
      },
      "capacity_display": "Unknown",
      "map_caption_lines": [
        "Unknown"
      ],
      "capacity_notes": [],
      "capacity_unknown_reason": "No DC planning power capacity disclosed in frozen sources; non-demand equipment/area measures do not fill this gap.",
      "has_planning_or_campus_capacity_disclosure": false,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/UKN010",
      "citation_text": "ElecTrace (2026-10-14). Hunterston Data Centre. UK Data Centre Planning Database, version 1.0.0, project record UKN010. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UKN010"
    },
    {
      "project_id": "UKN001",
      "name": "Larbert Data Centre Campus",
      "nation": "Scotland",
      "stage_detail": "planning_application_or_reserved_matters",
      "stage_label": "Planning application or reserved matters",
      "latitude": 56.02246,
      "longitude": -3.82872,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Source project UKN001: Glenbervie Business Park, Larbert, Falkirk. Larbert, Falkirk, Scotland. Locality representative point only; no site coordinate inferred.",
      "coordinate_source": "https://www.geonames.org/2644867/",
      "location_label": "Larbert",
      "source_urls": [
        "https://docs.planning.org.uk/20260604/192/TFY4B9HC05J00/8675qm6w7f6je631.pdf",
        "https://apatura.energy/news-insights/larbert-data-centre-campus-plans-submitted-to-falkirk-council-for-larbert-data-centre-campus/",
        "https://docs.planning.org.uk/20260604/192/TFY4B9HC05J00/ajzu9g3xrmdm1ul9.pdf"
      ],
      "source_dates": [
        "2026-06",
        "2026-06-09",
        "2025-12-05"
      ],
      "map_id": 79,
      "capacity_columns": {
        "it": "230 MW",
        "facility": "",
        "grid": "300 MW (modification application)",
        "unspecified": "",
        "mva": "300 MVA"
      },
      "capacity_categories": {
        "it": [
          {
            "category": "it",
            "value": 230.0,
            "unit": "MW",
            "raw_boundary": "IT_load",
            "qualification": null,
            "scope": "unspecified",
            "stage": "planning_application",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "UKN001",
            "source_url": "https://docs.planning.org.uk/20260604/192/TFY4B9HC05J00/8675qm6w7f6je631.pdf",
            "source_date": "2026-06",
            "preferred_for_display": true,
            "additive": false
          }
        ],
        "facility": [],
        "grid": [
          {
            "category": "grid",
            "value": 300.0,
            "unit": "MW",
            "raw_boundary": "final_demand_import",
            "qualification": "exact",
            "scope": "Economic assessment p6: final demand import submitted in December2024 modification",
            "stage": "application_modification",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "SCOT8-LARBERT-DEMAND",
            "source_url": "https://docs.planning.org.uk/20260604/192/TFY4B9HC05J00/ajzu9g3xrmdm1ul9.pdf",
            "source_date": "2025-12-05",
            "preferred_for_display": true,
            "additive": false
          },
          {
            "category": "grid",
            "value": 300.0,
            "unit": "MW",
            "raw_boundary": "incoming_power_connection",
            "qualification": null,
            "scope": "Larbert Data Centre Campus",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "UKN001",
            "source_url": "https://docs.planning.org.uk/20260604/192/TFY4B9HC05J00/8675qm6w7f6je631.pdf",
            "source_date": "2026-06",
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "unspecified": [
          {
            "category": "unspecified",
            "value": 300.0,
            "unit": "MW",
            "raw_boundary": "data_centre_capacity_unspecified",
            "qualification": "exact",
            "scope": "Named campus; developer states confirmed grid connections and Denny substation",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "SCOT8-LARBERT-CONFIRMED",
            "source_url": "https://apatura.energy/news-insights/larbert-data-centre-campus-plans-submitted-to-falkirk-council-for-larbert-data-centre-campus/",
            "source_date": "2026-06-09",
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "mva": [
          {
            "category": "mva",
            "value": 300.0,
            "unit": "MVA",
            "raw_boundary": "introductory_capacity",
            "qualification": null,
            "scope": "unspecified",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "UKN001",
            "source_url": "https://docs.planning.org.uk/20260604/192/TFY4B9HC05J00/8675qm6w7f6je631.pdf",
            "source_date": "2026-06",
            "preferred_for_display": false,
            "additive": false
          }
        ]
      },
      "capacity_display": "IT: 230 MW; Grid: 300 MW (modification application); MVA: 300 MVA",
      "map_caption_lines": [
        "IT: 230 MW",
        "Grid: 300 MW (modification application)",
        "MVA: 300 MVA"
      ],
      "capacity_notes": [
        "IT capacity qualification: planning application."
      ],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/UKN001",
      "citation_text": "ElecTrace (2026-10-14). Larbert Data Centre Campus. UK Data Centre Planning Database, version 1.0.0, project record UKN001. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UKN001"
    },
    {
      "project_id": "P027",
      "name": "Ochiltree data center campus",
      "nation": "Scotland",
      "stage_detail": "pre_application_or_consultation",
      "stage_label": "Pre-application or consultation",
      "latitude": 55.45445,
      "longitude": -4.26644,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Source project P027: Land south of Creoch Farm near Cumnock. Source states land near Cumnock; use Cumnock locality only, not the inherited Glasgow-like coordinate. Locality representative point only; no site coordinate inferred.",
      "coordinate_source": "https://www.geonames.org/2651706/",
      "location_label": "Cumnock",
      "source_urls": [
        "https://www.datacenterdynamics.com/en/news/data-center-application-filed-in-in-east-ayrshire-scotland/",
        "https://aprs.scot/wp-content/uploads/2026/03/25_0003_EIASCR-PROPOSED_CONSTRUCTION_OF_DATA_CENTRE_CAMPUS-1280790.pdf"
      ],
      "source_dates": [
        "2025-06"
      ],
      "map_id": 80,
      "capacity_columns": {
        "it": "200 MW",
        "facility": "",
        "grid": "",
        "unspecified": "",
        "mva": ""
      },
      "capacity_categories": {
        "it": [
          {
            "category": "it",
            "value": 200.0,
            "unit": "MW",
            "raw_boundary": "it_load",
            "qualification": "IT, not whole-site demand",
            "scope": "One or more data-centre buildings; original developer screening specification",
            "stage": "eia_screening_preplanning",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "V38-OCHILTREE-ORIGINAL-IT",
            "source_url": "https://aprs.scot/wp-content/uploads/2026/03/25_0003_EIASCR-PROPOSED_CONSTRUCTION_OF_DATA_CENTRE_CAMPUS-1280790.pdf",
            "source_date": "2025-06",
            "preferred_for_display": true,
            "additive": false
          },
          {
            "category": "it",
            "value": 200.0,
            "unit": "MW",
            "raw_boundary": "IT load",
            "qualification": null,
            "scope": "Ochiltree data center campus",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "P027",
            "source_url": "https://www.datacenterdynamics.com/en/news/data-center-application-filed-in-in-east-ayrshire-scotland/",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          },
          {
            "category": "it",
            "value": 200.0,
            "unit": "MW",
            "raw_boundary": "IT load",
            "qualification": null,
            "scope": "One or more buildings; 45000 sqm footprint",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "P027",
            "source_url": "https://www.datacenterdynamics.com/en/news/data-center-application-filed-in-in-east-ayrshire-scotland/",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "facility": [],
        "grid": [],
        "unspecified": [],
        "mva": []
      },
      "capacity_display": "IT: 200 MW",
      "map_caption_lines": [
        "IT: 200 MW"
      ],
      "capacity_notes": [
        "IT capacity qualification: eia screening preplanning."
      ],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/P027",
      "citation_text": "ElecTrace (2026-10-14). Ochiltree data center campus. UK Data Centre Planning Database, version 1.0.0, project record P027. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/P027"
    },
    {
      "project_id": "UKN013",
      "name": "Oxwellmains Data Centre",
      "nation": "Scotland",
      "stage_detail": "planning_application_or_reserved_matters",
      "stage_label": "Planning application or reserved matters",
      "latitude": 56.00062,
      "longitude": -2.51418,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Source project UKN013: Oxwellmains, Dunbar, East Lothian. Source states Oxwellmains, Dunbar, East Lothian; Dunbar is a broader locality proxy. Locality representative point only; no site coordinate inferred.",
      "coordinate_source": "https://www.geonames.org/2650776/",
      "location_label": "Dunbar",
      "source_urls": [
        "https://dunbarcommunitycouncil.org.uk/files/2026/04/Minutes-DCC-Ordinary-Meeting-15th-December-2025.pdf"
      ],
      "source_dates": [
        "2025-12-15"
      ],
      "map_id": 81,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "",
        "unspecified": "",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [],
        "unspecified": [],
        "mva": []
      },
      "capacity_display": "Unknown",
      "map_caption_lines": [
        "Unknown"
      ],
      "capacity_notes": [],
      "capacity_unknown_reason": "No DC planning power capacity disclosed in frozen sources; non-demand equipment/area measures do not fill this gap.",
      "has_planning_or_campus_capacity_disclosure": false,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/UKN013",
      "citation_text": "ElecTrace (2026-10-14). Oxwellmains Data Centre. UK Data Centre Planning Database, version 1.0.0, project record UKN013. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UKN013"
    },
    {
      "project_id": "UK-REBUILD-NORTH-010",
      "name": "Queensway Park Data Centre",
      "nation": "Scotland",
      "stage_detail": "planning_permission_reported",
      "stage_label": "Planning permission reported",
      "latitude": 56.19514,
      "longitude": -3.17316,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Source project UK-REBUILD-NORTH-010: Glenrothes, former Tullis Russell paper mill. Source identifies Glenrothes, Fife. Locality representative point only; no site coordinate inferred.",
      "coordinate_source": "https://www.geonames.org/2648438/",
      "location_label": "Glenrothes",
      "source_urls": [
        "https://www.investfife.co.uk/wp-content/uploads/2025/05/UKREIIF-2025-brochure-V7-21.03.2025.pdf"
      ],
      "source_dates": [
        "2025-03-21"
      ],
      "map_id": 82,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "",
        "unspecified": "20 MW (basis unresolved)",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [],
        "unspecified": [
          {
            "category": "unspecified",
            "value": 20.0,
            "unit": "MW",
            "raw_boundary": "unspecified_facility_capacity",
            "qualification": "stated",
            "scope": "site_full_buildout",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "UK-REBUILD-NORTH-010",
            "source_url": "https://www.investfife.co.uk/wp-content/uploads/2025/05/UKREIIF-2025-brochure-V7-21.03.2025.pdf",
            "source_date": "2025-03-21",
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "mva": []
      },
      "capacity_display": "Reported (basis unknown): 20 MW (basis unresolved)",
      "map_caption_lines": [
        "Reported (basis unknown): 20 MW (basis unresolved)"
      ],
      "capacity_notes": [],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/UK-REBUILD-NORTH-010",
      "citation_text": "ElecTrace (2026-10-14). Queensway Park Data Centre. UK Data Centre Planning Database, version 1.0.0, project record UK-REBUILD-NORTH-010. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UK-REBUILD-NORTH-010"
    },
    {
      "project_id": "P042",
      "name": "Ravenscraig / SevenFourEight campus",
      "nation": "Scotland",
      "stage_detail": "planning_application_or_reserved_matters",
      "stage_label": "Planning application or reserved matters",
      "latitude": 55.78924,
      "longitude": -3.99187,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Source project P042: Former Ravenscraig Steelworks site near Motherwell. Source states former Ravenscraig steelworks near Motherwell; use Motherwell locality only. Locality representative point only; no site coordinate inferred.",
      "coordinate_source": "https://www.geonames.org/2642135/",
      "location_label": "Motherwell",
      "source_urls": [
        "https://www.datacenterdynamics.com/en/news/apatura-plans-500mw-data-center-campus-in-scotland/",
        "https://consult.apatura.energy/ravenscraig/the-project",
        "https://apatura.energy/news-insights/ravenscraig-plans-to-transform-former-steelworks-into-one-of-the-uks-largest-green-ai-data-centres/",
        "https://145830797.fs1.hubspotusercontent-eu1.net/hubfs/145830797/Ravenscraig_NL_EIA%20Graphic%20V2.pdf",
        "https://www.neso.energy/document/368721/download"
      ],
      "source_dates": [
        "2025-06-27",
        "2025-09-16"
      ],
      "map_id": 83,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "550 MW (modification application)",
        "unspecified": "",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [
          {
            "category": "grid",
            "value": 550.0,
            "unit": "MW",
            "raw_boundary": "final_demand_import",
            "qualification": "developer-commissioned report says submitted; no executed MIC schedule",
            "scope": "Site final demand import submitted through Modification Application December2024",
            "stage": "application_modification",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "V35-RAVENSCRAIG-MOD-IMPORT",
            "source_url": "https://145830797.fs1.hubspotusercontent-eu1.net/hubfs/145830797/Ravenscraig_NL_EIA%20Graphic%20V2.pdf",
            "source_date": null,
            "preferred_for_display": true,
            "additive": false
          },
          {
            "category": "grid",
            "value": 550.0,
            "unit": "MW",
            "raw_boundary": "shared_campus_grid_connection_allocation_unresolved",
            "qualification": null,
            "scope": "Data-centre+BESSdevelopmentpoweredby550MWgridconnections; DC-onlyimportvsBESSallocationandmultipleconnectionsnotdisclosed",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "CYCLE27-RAVENSCRAIG-GRID",
            "source_url": "https://apatura.energy/news-insights/ravenscraig-plans-to-transform-former-steelworks-into-one-of-the-uks-largest-green-ai-data-centres/",
            "source_date": "2025-06-27",
            "preferred_for_display": false,
            "additive": false
          },
          {
            "category": "grid",
            "value": 550.0,
            "unit": "MW",
            "raw_boundary": "applied_grid_connection_capacity",
            "qualification": "Derived subtotal 250+300; table is a modification-stage disclosure. Do not add 550 again to same campus; V35 already has Glic final-demand-import 550.",
            "scope": "Ravenscraig final-demand modification across Newarthill 250 MW and Wishaw 300 MW; arithmetic sum of two named demand rows, one campus.",
            "stage": "application",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "CYCLE36-RAVENSCRAIG-NESO-FINAL-DEMAND",
            "source_url": "https://www.neso.energy/document/368721/download",
            "source_date": "2025-09-16",
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "unspecified": [
          {
            "category": "unspecified",
            "value": 550.0,
            "unit": "MW",
            "raw_boundary": "Data center development capacity",
            "qualification": null,
            "scope": "Ravenscraig / SevenFourEight campus",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "P042",
            "source_url": "https://www.datacenterdynamics.com/en/news/apatura-plans-500mw-data-center-campus-in-scotland/",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          },
          {
            "category": "unspecified",
            "value": 550.0,
            "unit": "MW",
            "raw_boundary": "Data center development capacity",
            "qualification": null,
            "scope": "160-acre data center and BESS campus",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "P042",
            "source_url": "https://www.datacenterdynamics.com/en/news/apatura-plans-500mw-data-center-campus-in-scotland/",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          },
          {
            "category": "unspecified",
            "value": 550.0,
            "unit": "MW",
            "raw_boundary": "data_centre_capacity_unspecified",
            "qualification": "exact",
            "scope": "Whole east/west campus",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "HIST9-RAVENSCRAIG",
            "source_url": "https://consult.apatura.energy/ravenscraig/the-project",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "mva": []
      },
      "capacity_display": "Grid: 550 MW (modification application)",
      "map_caption_lines": [
        "Grid: 550 MW (modification application)"
      ],
      "capacity_notes": [],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/P042",
      "citation_text": "ElecTrace (2026-10-14). Ravenscraig / SevenFourEight campus. UK Data Centre Planning Database, version 1.0.0, project record P042. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/P042"
    },
    {
      "project_id": "UKN006",
      "name": "Rufus Data Centre",
      "nation": "Scotland",
      "stage_detail": "pre_application_or_consultation",
      "stage_label": "Pre-application or consultation",
      "latitude": 55.60086,
      "longitude": -4.45363,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Source project UKN006: Purroch, Hurlford, East Ayrshire. Source states Purroch, Hurlford, East Ayrshire; use Hurlford locality only. Locality representative point only; no site coordinate inferred.",
      "coordinate_source": "https://www.geonames.org/2646367/",
      "location_label": "Hurlford",
      "source_urls": [
        "https://meetings.ili-energy.com/rufus-data-centre-project/",
        "https://spice-spotlight.scot/2026/06/26/data-centres/",
        "https://www.neso.energy/document/373996/download",
        "https://www.neso.energy/document/381116/download",
        "https://www.neso.energy/document/358886/download",
        "https://aprs.scot/hurlford-dc/"
      ],
      "source_dates": [
        "2026-03",
        "2026-06-26",
        "2026-04-27"
      ],
      "map_id": 84,
      "capacity_columns": {
        "it": "",
        "facility": "540 MW (official interpretation)",
        "grid": "",
        "unspecified": "",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [
          {
            "category": "facility",
            "value": 540.0,
            "unit": "MW",
            "raw_boundary": "maximum_electrical_draw_interpretation",
            "qualification": "exact",
            "scope": "Scottish Parliament SPICe explains540MW as maximum power drawn; not a signed import agreement or technical schedule",
            "stage": "official_interpretation",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "BOUND10-RUFUS",
            "source_url": "https://spice-spotlight.scot/2026/06/26/data-centres/",
            "source_date": "2026-06-26",
            "preferred_for_display": true,
            "additive": false
          }
        ],
        "grid": [],
        "unspecified": [
          {
            "category": "unspecified",
            "value": 540.0,
            "unit": "MW",
            "raw_boundary": "secondary_report_unspecified",
            "qualification": null,
            "scope": "unspecified",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "UKN006",
            "source_url": "https://aprs.scot/hurlford-dc/",
            "source_date": "2026-03",
            "preferred_for_display": false,
            "additive": false
          },
          {
            "category": "unspecified",
            "value": 540.0,
            "unit": "MW",
            "raw_boundary": "ea_associated_installed_capacity",
            "qualification": "MW unit from NESO explanatory FOI, not added to original XLSX raw field",
            "scope": "Customer/DNO supplied queue-item capacity, possibly stage or technology element; not certified maximum import",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "CYCLE25-EA-001082",
            "source_url": "https://www.neso.energy/document/373996/download",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "mva": []
      },
      "capacity_display": "Facility: 540 MW (official interpretation)",
      "map_caption_lines": [
        "Facility: 540 MW (official interpretation)"
      ],
      "capacity_notes": [
        "Facility boundary: maximum_electrical_draw_interpretation; official_interpretation."
      ],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/UKN006",
      "citation_text": "ElecTrace (2026-10-14). Rufus Data Centre. UK Data Centre Planning Database, version 1.0.0, project record UKN006. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UKN006"
    },
    {
      "project_id": "UKN011",
      "name": "Southside Data Centre",
      "nation": "Scotland",
      "stage_detail": "pre_application_or_consultation",
      "stage_label": "Pre-application or consultation",
      "latitude": 55.80736,
      "longitude": -2.49121,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Source project UKN011: Longformacus / Clawbare Cottage, near Duns, Scottish Borders. Source specifically states Longformacus / Clawbare Cottage, near Duns; use Longformacus locality. Locality representative point only; no site coordinate inferred.",
      "coordinate_source": "https://www.geonames.org/2643690/",
      "location_label": "Longformacus",
      "source_urls": [
        "https://publicnoticeportal.uk/notice/other/6a17869c9ffa87091e128b24"
      ],
      "source_dates": [
        "2026-05-28"
      ],
      "map_id": 85,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "",
        "unspecified": "225 MW (basis unresolved)",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [],
        "unspecified": [
          {
            "category": "unspecified",
            "value": 225.0,
            "unit": "MW",
            "raw_boundary": "campus_total_unspecified",
            "qualification": null,
            "scope": "Southside Data Centre",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "UKN011",
            "source_url": "https://publicnoticeportal.uk/notice/other/6a17869c9ffa87091e128b24",
            "source_date": "2026-05-28",
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "mva": []
      },
      "capacity_display": "Reported (basis unknown): 225 MW (basis unresolved)",
      "map_caption_lines": [
        "Reported (basis unknown): 225 MW (basis unresolved)"
      ],
      "capacity_notes": [],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/UKN011",
      "citation_text": "ElecTrace (2026-10-14). Southside Data Centre. UK Data Centre Planning Database, version 1.0.0, project record UKN011. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UKN011"
    },
    {
      "project_id": "UKN014",
      "name": "Spango Valley Data Centre",
      "nation": "Scotland",
      "stage_detail": "pre_application_or_consultation",
      "stage_label": "Pre-application or consultation",
      "latitude": 55.94838,
      "longitude": -4.76121,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Source project UKN014: Former IBM site, Spango Valley, Greenock, Inverclyde. Source states Spango Valley, Greenock, Inverclyde; Greenock is a broader locality proxy. Locality representative point only; no site coordinate inferred.",
      "coordinate_source": "https://www.geonames.org/2647948/",
      "location_label": "Greenock",
      "source_urls": [
        "https://www.spangovalleyconsultation.co.uk/",
        "https://aprs.scot/greenock-ibm-data-centre/"
      ],
      "source_dates": [],
      "map_id": 86,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "",
        "unspecified": "150 MW (basis unresolved)",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [],
        "unspecified": [
          {
            "category": "unspecified",
            "value": 150.0,
            "unit": "MW",
            "raw_boundary": "secondary_report_of_PAC_annex",
            "qualification": null,
            "scope": "unspecified",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "UKN014",
            "source_url": "https://aprs.scot/greenock-ibm-data-centre/",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "mva": []
      },
      "capacity_display": "Reported (basis unknown): 150 MW (basis unresolved)",
      "map_caption_lines": [
        "Reported (basis unknown): 150 MW (basis unresolved)"
      ],
      "capacity_notes": [],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/UKN014",
      "citation_text": "ElecTrace (2026-10-14). Spango Valley Data Centre. UK Data Centre Planning Database, version 1.0.0, project record UKN014. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UKN014"
    },
    {
      "project_id": "UKN012",
      "name": "West Barns Mains Data Centre",
      "nation": "Scotland",
      "stage_detail": "pre_application_or_consultation",
      "stage_label": "Pre-application or consultation",
      "latitude": 55.9938,
      "longitude": -2.55346,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Source project UKN012: West Barns Mains, Dunbar, East Lothian. West Barns, East Lothian; farm parcel is not geocoded. Locality representative point only; no site coordinate inferred.",
      "coordinate_source": "https://www.geonames.org/11592274/",
      "location_label": "West Barns",
      "source_urls": [
        "https://dunbarcommunitycouncil.org.uk/files/2026/04/Minutes-DCC-Ordinary-Meeting-15th-December-2025.pdf"
      ],
      "source_dates": [
        "2025-12-15"
      ],
      "map_id": 87,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "",
        "unspecified": "",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [],
        "unspecified": [],
        "mva": []
      },
      "capacity_display": "Unknown",
      "map_caption_lines": [
        "Unknown"
      ],
      "capacity_notes": [],
      "capacity_unknown_reason": "No DC planning power capacity disclosed in frozen sources; non-demand equipment/area measures do not fill this gap.",
      "has_planning_or_campus_capacity_disclosure": false,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/UKN012",
      "citation_text": "ElecTrace (2026-10-14). West Barns Mains Data Centre. UK Data Centre Planning Database, version 1.0.0, project record UKN012. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UKN012"
    },
    {
      "project_id": "UKN002",
      "name": "Wester Hermiston Data Centre Campus",
      "nation": "Scotland",
      "stage_detail": "pre_application_or_consultation",
      "stage_label": "Pre-application or consultation",
      "latitude": 55.92211,
      "longitude": -3.33149,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Source project UKN002: Wester Hermiston, Edinburgh; South of M8 Claylands-Hermiston, Edinburgh. Wester Hermiston source locality represented by Hermiston settlement near Edinburgh; approximate locality only. Locality representative point only; no site coordinate inferred.",
      "coordinate_source": "https://www.geonames.org/12263866/",
      "location_label": "Hermiston",
      "source_urls": [
        "https://consult.apatura.energy/westerhermiston/the-project",
        "https://www.transport.gov.scot/publication/m8-claylands-to-hermiston-hard-shoulder-eastbound-environmental-impact-assessment-record-of-determination/assessment-of-cumulative-effects/",
        "https://145830797.fs1.hubspotusercontent-eu1.net/hubfs/145830797/Wester%20Hermiston_CoE%20EIA%20Graphic%20V2.pdf",
        "https://145830797.fs1.hubspotusercontent-eu1.net/hubfs/145830797/Wester%20Hermiston%20panels-v1.3.pdf"
      ],
      "source_dates": [],
      "map_id": 88,
      "capacity_columns": {
        "it": "",
        "facility": "200 MW (design disclosure)",
        "grid": "200 MW (source-reported connection)",
        "unspecified": "",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [
          {
            "category": "facility",
            "value": 200.0,
            "unit": "MW",
            "raw_boundary": "demand_utility_capacity",
            "qualification": "stated",
            "scope": "site_full_buildout",
            "stage": "design",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "UK-REBUILD-NORTH-016",
            "source_url": "https://www.transport.gov.scot/publication/m8-claylands-to-hermiston-hard-shoulder-eastbound-environmental-impact-assessment-record-of-determination/assessment-of-cumulative-effects/",
            "source_date": null,
            "preferred_for_display": true,
            "additive": false
          },
          {
            "category": "facility",
            "value": 200.0,
            "unit": "MW",
            "raw_boundary": "demand_capacity",
            "qualification": "reported_boundary_not_full_engineering_specification",
            "scope": "Same campus demand capacity stated alongside grid200; not an extra200",
            "stage": "design",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "V34-HERMISTON-EXPLICIT-GRID",
            "source_url": "https://145830797.fs1.hubspotusercontent-eu1.net/hubfs/145830797/Wester%20Hermiston_CoE%20EIA%20Graphic%20V2.pdf",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "grid": [
          {
            "category": "grid",
            "value": 200.0,
            "unit": "MW",
            "raw_boundary": "grid_connection_disclosed",
            "qualification": "reported_not_contract_document",
            "scope": "Explicit named Wester Hermiston grid capacity in developer-commissioned economic summary",
            "stage": "source_claimed_connection",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "V34-HERMISTON-EXPLICIT-GRID",
            "source_url": "https://145830797.fs1.hubspotusercontent-eu1.net/hubfs/145830797/Wester%20Hermiston_CoE%20EIA%20Graphic%20V2.pdf",
            "source_date": null,
            "preferred_for_display": true,
            "additive": false
          }
        ],
        "unspecified": [
          {
            "category": "unspecified",
            "value": 200.0,
            "unit": "MW",
            "raw_boundary": "campus_unspecified",
            "qualification": null,
            "scope": "Wester Hermiston Data Centre Campus",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "UKN002",
            "source_url": "https://consult.apatura.energy/westerhermiston/the-project",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "mva": []
      },
      "capacity_display": "Facility: 200 MW (design disclosure); Grid: 200 MW (source-reported connection)",
      "map_caption_lines": [
        "Facility: 200 MW (design disclosure)",
        "Grid: 200 MW (source-reported connection)"
      ],
      "capacity_notes": [
        "Facility boundary: demand_utility_capacity; design."
      ],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/UKN002",
      "citation_text": "ElecTrace (2026-10-14). Wester Hermiston Data Centre Campus. UK Data Centre Planning Database, version 1.0.0, project record UKN002. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UKN002"
    },
    {
      "project_id": "UKN004",
      "name": "Westerhill Data Centre Campus",
      "nation": "Scotland",
      "stage_detail": "pre_application_or_consultation",
      "stage_label": "Pre-application or consultation",
      "latitude": 55.90669,
      "longitude": -4.21869,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Source project UKN004: Bishopbriggs, East Dunbartonshire. Source states Bishopbriggs, East Dunbartonshire. Locality representative point only; no site coordinate inferred.",
      "coordinate_source": "https://www.geonames.org/2655582/",
      "location_label": "Bishopbriggs",
      "source_urls": [
        "https://145830797.fs1.hubspotusercontent-eu1.net/hubfs/145830797/Westerhill_ED_EIA%20Graphic%20V2.pdf",
        "https://www.neso.energy/document/368721/download"
      ],
      "source_dates": [
        "2025-09-16"
      ],
      "map_id": 89,
      "capacity_columns": {
        "it": "",
        "facility": "300 MW demand design",
        "grid": "300 MW modification application",
        "unspecified": "",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [
          {
            "category": "facility",
            "value": 300.0,
            "unit": "MW",
            "raw_boundary": "demand_capacity",
            "qualification": null,
            "scope": "Westerhill Data Centre Campus",
            "stage": "design",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "UKN004",
            "source_url": "https://145830797.fs1.hubspotusercontent-eu1.net/hubfs/145830797/Westerhill_ED_EIA%20Graphic%20V2.pdf",
            "source_date": null,
            "preferred_for_display": true,
            "additive": false
          },
          {
            "category": "facility",
            "value": 300.0,
            "unit": "MW",
            "raw_boundary": "demand_capacity",
            "qualification": "stated",
            "scope": "site_full_buildout",
            "stage": "design",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "V35-WESTERHILL-GRID-SCOPE",
            "source_url": "https://145830797.fs1.hubspotusercontent-eu1.net/hubfs/145830797/Westerhill_ED_EIA%20Graphic%20V2.pdf",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "grid": [
          {
            "category": "grid",
            "value": 300.0,
            "unit": "MW",
            "raw_boundary": "applied_grid_connection_capacity",
            "qualification": "May2025 modification under way; separate500MWBESS not counted; June2025 developer accepted-offer timeline does not prove final DC contract amount.",
            "scope": "Lambhill final demand for data-centre usage, Apatura named Westerhill campus connected by applicant node statement.",
            "stage": "application",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "CYCLE36-WESTERHILL-NESO-FINAL-DEMAND",
            "source_url": "https://www.neso.energy/document/368721/download",
            "source_date": "2025-09-16",
            "preferred_for_display": true,
            "additive": false
          },
          {
            "category": "grid",
            "value": 500.0,
            "unit": "MW",
            "raw_boundary": "shared_campus_grid_connection_allocation_unresolved",
            "qualification": "Grid500 is not automatically DC300 or BESS500 contracted import",
            "scope": "Grid label on economic summary of DC+BESS scheme",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "V35-WESTERHILL-GRID-SCOPE",
            "source_url": "https://145830797.fs1.hubspotusercontent-eu1.net/hubfs/145830797/Westerhill_ED_EIA%20Graphic%20V2.pdf",
            "source_date": null,
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "unspecified": [],
        "mva": []
      },
      "capacity_display": "Facility: 300 MW demand design; Grid: 300 MW modification application",
      "map_caption_lines": [
        "Facility: 300 MW demand design",
        "Grid: 300 MW modification application"
      ],
      "capacity_notes": [
        "Facility boundary: demand_capacity; design."
      ],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/UKN004",
      "citation_text": "ElecTrace (2026-10-14). Westerhill Data Centre Campus. UK Data Centre Planning Database, version 1.0.0, project record UKN004. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UKN004"
    },
    {
      "project_id": "UK-REBUILD-NORTH-003",
      "name": "Cardiff East Park and Ride Data Centre",
      "nation": "Wales",
      "stage_detail": "planning_application_or_reserved_matters",
      "stage_label": "Planning application or reserved matters",
      "latitude": 51.5338,
      "longitude": -3.11354,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Source project UK-REBUILD-NORTH-003: Llanrumney / Old St Mellons, Cardiff East Park and Ride, A48 Eastern Avenue. Source states Old St Mellons/Llanrumney; Old St. Mellons administrative representative point only. Locality representative point only; no site coordinate inferred.",
      "coordinate_source": "https://www.geonames.org/7298750/",
      "location_label": "Old St. Mellons",
      "source_urls": [
        "https://cardiffeastparkandride.com/wp-content/uploads/2025/12/ES-Vol-I-Chapter-3-Proposed-Development-Demolition-Construction-Description-of-Alternatives.pdf",
        "https://cardiffeastparkandride.com/wp-content/uploads/2025/12/ES-Vol-I-Chapter-10-Climate-Change.pdf"
      ],
      "source_dates": [
        "2025-12"
      ],
      "map_id": 90,
      "capacity_columns": {
        "it": "",
        "facility": "210 MW servers + cooling (source model)",
        "grid": "",
        "unspecified": "150 MW DC claim; not explicitly IT",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [
          {
            "category": "facility",
            "value": 210.0,
            "unit": "MW",
            "raw_boundary": "source_modelled_servers_and_cooling_demand",
            "qualification": "EIA_modelled_PUE_1.4_not_confirmed_grid_import",
            "scope": "site_full_buildout",
            "stage": "source_model",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "UK-REBUILD-NORTH-003",
            "source_url": "https://cardiffeastparkandride.com/wp-content/uploads/2025/12/ES-Vol-I-Chapter-10-Climate-Change.pdf",
            "source_date": "2025-12",
            "preferred_for_display": true,
            "additive": false
          }
        ],
        "grid": [],
        "unspecified": [
          {
            "category": "unspecified",
            "value": 150.0,
            "unit": "MW",
            "raw_boundary": "DC_capacity_not_explicitly_labelled_IT",
            "qualification": "stated",
            "scope": "site_full_buildout",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "UK-REBUILD-NORTH-003",
            "source_url": "https://cardiffeastparkandride.com/wp-content/uploads/2025/12/ES-Vol-I-Chapter-3-Proposed-Development-Demolition-Construction-Description-of-Alternatives.pdf",
            "source_date": "2025-12",
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "mva": []
      },
      "capacity_display": "Facility: 210 MW servers + cooling (source model); Reported (basis unknown): 150 MW DC claim; not explicitly IT",
      "map_caption_lines": [
        "Facility: 210 MW servers + cooling (source model)",
        "Reported (basis unknown): 150 MW DC claim; not explicitly IT"
      ],
      "capacity_notes": [
        "IT audit decision: unresolved; hybrid application it boundary unknown.",
        "Facility boundary: source_modelled_servers_and_cooling_demand; source_model.",
        "150 MW is not explicitly IT. 210 MW is a source model of servers and cooling; the map does not infer IT via PUE."
      ],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/UK-REBUILD-NORTH-003",
      "citation_text": "ElecTrace (2026-10-14). Cardiff East Park and Ride Data Centre. UK Data Centre Planning Database, version 1.0.0, project record UK-REBUILD-NORTH-003. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UK-REBUILD-NORTH-003"
    },
    {
      "project_id": "UK5-GCRE",
      "name": "GCRE Nant Helen Energy and Data Centre Partner Opportunity",
      "nation": "Wales",
      "stage_detail": "planned_or_early_development",
      "stage_label": "Planned or early development",
      "latitude": 51.79181,
      "longitude": -3.67014,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Exact settlement name in source location/project name: Dulais/Swansea valleys near Coelbren/Onllwyn",
      "coordinate_source": "https://www.geonames.org/2652646/",
      "location_label": "Coelbren",
      "source_urls": [
        "https://www.gcre.wales/press-releases/gcre-extends-energy-and-data-centre-partner-opportunity/",
        "https://planningcasework.service.gov.wales/dns/CAS-05134-C8C9N9"
      ],
      "source_dates": [
        "2026-06-29"
      ],
      "map_id": 91,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "",
        "unspecified": "350 MW site proposal; basis unresolved",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [],
        "unspecified": [
          {
            "category": "unspecified",
            "value": 350.0,
            "unit": "MW",
            "raw_boundary": "DC_capacity_unspecified",
            "qualification": "up_to",
            "scope": "site_full_buildout",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "UK-REBUILD-NORTH-015",
            "source_url": "https://planningcasework.service.gov.wales/dns/CAS-05134-C8C9N9",
            "source_date": "2026-06-29",
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "mva": []
      },
      "capacity_display": "Reported (basis unknown): 350 MW site proposal; basis unresolved",
      "map_caption_lines": [
        "Reported (basis unknown): 350 MW site proposal; basis",
        "  unresolved"
      ],
      "capacity_notes": [],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/UK5-GCRE",
      "citation_text": "ElecTrace (2026-10-14). GCRE Nant Helen Energy and Data Centre Partner Opportunity. UK Data Centre Planning Database, version 1.0.0, project record UK5-GCRE. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UK5-GCRE"
    },
    {
      "project_id": "UKN018",
      "name": "Microsoft Newport Imperial Park",
      "nation": "Wales",
      "stage_detail": "construction_reported",
      "stage_label": "Construction reported",
      "latitude": 51.58774,
      "longitude": -2.99835,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Exact settlement name in source location/project name: Imperial Park, Newport",
      "coordinate_source": "https://www.geonames.org/2641598/",
      "location_label": "Newport",
      "source_urls": [
        "https://local.microsoft.com/blog/newport-imperial-park-datacentre-construction-overview/"
      ],
      "source_dates": [],
      "map_id": 92,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "",
        "unspecified": "",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [],
        "unspecified": [],
        "mva": []
      },
      "capacity_display": "Unknown",
      "map_caption_lines": [
        "Unknown"
      ],
      "capacity_notes": [],
      "capacity_unknown_reason": "No DC planning power capacity disclosed in frozen sources; non-demand equipment/area measures do not fill this gap.",
      "has_planning_or_campus_capacity_disclosure": false,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/UKN018",
      "citation_text": "ElecTrace (2026-10-14). Microsoft Newport Imperial Park. UK Data Centre Planning Database, version 1.0.0, project record UKN018. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UKN018"
    },
    {
      "project_id": "UK-REBUILD-NORTH-005",
      "name": "Mwyndy Cross eastern parcel Maska option2",
      "nation": "Wales",
      "stage_detail": "planning_application_or_reserved_matters",
      "stage_label": "Planning application or reserved matters",
      "latitude": 51.52673,
      "longitude": -3.36643,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Source project UK-REBUILD-NORTH-005: East of Mwyndy Cross, south of A473, eastern SSA8 employment parcel. Source specifies eastern Mwyndy Cross parcel; same locality proxy as western parcel, not a site identity merge. Locality representative point only; no site coordinate inferred.",
      "coordinate_source": "https://www.geonames.org/13274072/",
      "location_label": "Mwyndy",
      "source_urls": [
        "https://www.carneysweeney.co.uk/cmsUploads/consultations/files/260227_PS-1.pdf"
      ],
      "source_dates": [
        "2026-02"
      ],
      "map_id": 93,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "",
        "unspecified": "",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [],
        "unspecified": [],
        "mva": []
      },
      "capacity_display": "Unknown",
      "map_caption_lines": [
        "Unknown"
      ],
      "capacity_notes": [],
      "capacity_unknown_reason": "No DC planning power capacity disclosed in frozen sources; non-demand equipment/area measures do not fill this gap.",
      "has_planning_or_campus_capacity_disclosure": false,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/UK-REBUILD-NORTH-005",
      "citation_text": "ElecTrace (2026-10-14). Mwyndy Cross eastern parcel Maska option2. UK Data Centre Planning Database, version 1.0.0, project record UK-REBUILD-NORTH-005. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UK-REBUILD-NORTH-005"
    },
    {
      "project_id": "UK-REBUILD-NORTH-004",
      "name": "Mwyndy Cross western parcel VDC CWL31",
      "nation": "Wales",
      "stage_detail": "planning_permission_reported",
      "stage_label": "Planning permission reported",
      "latitude": 51.52673,
      "longitude": -3.36643,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Source project UK-REBUILD-NORTH-004: Land east of A4119, south of Cefn-y-Parc cemetery, Mwyndy, Pontyclun. Source specifies Mwyndy, Pontyclun; use Mwyndy locality, not a parcel boundary. Locality representative point only; no site coordinate inferred.",
      "coordinate_source": "https://www.geonames.org/13274072/",
      "location_label": "Mwyndy",
      "source_urls": [
        "https://rctcbc.moderngov.co.uk/documents/g50005119/Public%20reports%20pack%2001st-May-2025%2015.00%20Planning%20and%20Development%20Committee.pdf?LLL=0&T=10"
      ],
      "source_dates": [
        "2025-05-01"
      ],
      "map_id": 94,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "",
        "unspecified": "",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [],
        "unspecified": [],
        "mva": []
      },
      "capacity_display": "Unknown",
      "map_caption_lines": [
        "Unknown"
      ],
      "capacity_notes": [],
      "capacity_unknown_reason": "No DC planning power capacity disclosed in frozen sources; non-demand equipment/area measures do not fill this gap.",
      "has_planning_or_campus_capacity_disclosure": false,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/UK-REBUILD-NORTH-004",
      "citation_text": "ElecTrace (2026-10-14). Mwyndy Cross western parcel VDC CWL31. UK Data Centre Planning Database, version 1.0.0, project record UK-REBUILD-NORTH-004. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UK-REBUILD-NORTH-004"
    },
    {
      "project_id": "UK-R3-NORTH-004",
      "name": "Rover Way energy park and data centre, Splott",
      "nation": "Wales",
      "stage_detail": "planning_permission_reported",
      "stage_label": "Planning permission reported",
      "latitude": 51.48804,
      "longitude": -3.14041,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Exact settlement name in source location/project name: Rover Way / Tremorfa, Cardiff",
      "coordinate_source": "https://www.geonames.org/13266088/",
      "location_label": "Tremorfa",
      "source_urls": [
        "https://aienergyintelligence.co.uk/uk-data-centre-tracker/rover-way-energy-park-data-centre-cardiff",
        "https://gjplanning.co.uk/projects/cardiff-energy-park-and-data-centre/",
        "https://www.latosdc.co.uk/news/powering-the-ai-future-our-cardiff-hyperscale-facility/"
      ],
      "source_dates": [
        "2025-01-16"
      ],
      "map_id": 95,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "",
        "unspecified": "",
        "mva": "90 MVA"
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [],
        "unspecified": [],
        "mva": [
          {
            "category": "mva",
            "value": 90.0,
            "unit": "MVA",
            "raw_boundary": "apparent_power",
            "qualification": "stated",
            "scope": "site_full_buildout",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "UK-REBUILD-NORTH-014",
            "source_url": "https://www.latosdc.co.uk/news/powering-the-ai-future-our-cardiff-hyperscale-facility/",
            "source_date": "2025-01-16",
            "preferred_for_display": false,
            "additive": false
          }
        ]
      },
      "capacity_display": "MVA: 90 MVA",
      "map_caption_lines": [
        "MVA: 90 MVA"
      ],
      "capacity_notes": [],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/UK-R3-NORTH-004",
      "citation_text": "ElecTrace (2026-10-14). Rover Way energy park and data centre, Splott. UK Data Centre Planning Database, version 1.0.0, project record UK-R3-NORTH-004. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UK-R3-NORTH-004"
    },
    {
      "project_id": "UK-REBUILD-NORTH-009",
      "name": "Swansea Port Blue Eden Data Centre",
      "nation": "Wales",
      "stage_detail": "planned_or_early_development",
      "stage_label": "Planned or early development",
      "latitude": 51.62079,
      "longitude": -3.94323,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Exact settlement name in source location/project name: Swansea Port / Queens Dock",
      "coordinate_source": "https://www.geonames.org/2636432/",
      "location_label": "Swansea",
      "source_urls": [
        "https://swansea.oc2.uk/document/15/127"
      ],
      "source_dates": [
        "2024-12"
      ],
      "map_id": 96,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "",
        "unspecified": "",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [],
        "unspecified": [],
        "mva": []
      },
      "capacity_display": "Unknown",
      "map_caption_lines": [
        "Unknown"
      ],
      "capacity_notes": [],
      "capacity_unknown_reason": "No DC planning power capacity disclosed in frozen sources; non-demand equipment/area measures do not fill this gap.",
      "has_planning_or_campus_capacity_disclosure": false,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/UK-REBUILD-NORTH-009",
      "citation_text": "ElecTrace (2026-10-14). Swansea Port Blue Eden Data Centre. UK Data Centre Planning Database, version 1.0.0, project record UK-REBUILD-NORTH-009. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UK-REBUILD-NORTH-009"
    },
    {
      "project_id": "UKN020",
      "name": "Vantage Bridgend CWL4",
      "nation": "Wales",
      "stage_detail": "planning_application_or_reserved_matters",
      "stage_label": "Planning application or reserved matters",
      "latitude": 51.50583,
      "longitude": -3.57722,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Exact settlement name in source location/project name: Former Ford Engine Plant, Waterton Industrial Estate, Bridgend",
      "coordinate_source": "https://www.geonames.org/2654755/",
      "location_label": "Bridgend",
      "source_urls": [
        "https://democratic.bridgend.gov.uk/documents/s36191/Officers%20Report_P25247HYB.pdf?LLL=-1",
        "https://aienergyintelligence.co.uk/uk-data-centre-tracker/vantage-bridgend"
      ],
      "source_dates": [
        "2025-05-28"
      ],
      "map_id": 97,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "",
        "unspecified": "",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [],
        "unspecified": [],
        "mva": []
      },
      "capacity_display": "Unknown",
      "map_caption_lines": [
        "Unknown"
      ],
      "capacity_notes": [],
      "capacity_unknown_reason": "No DC planning power capacity disclosed in frozen sources; non-demand equipment/area measures do not fill this gap.",
      "has_planning_or_campus_capacity_disclosure": false,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/UKN020",
      "citation_text": "ElecTrace (2026-10-14). Vantage Bridgend CWL4. UK Data Centre Planning Database, version 1.0.0, project record UKN020. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UKN020"
    },
    {
      "project_id": "UKN019",
      "name": "Vantage Bro Tathan",
      "nation": "Wales",
      "stage_detail": "planning_permission_reported",
      "stage_label": "Planning permission reported",
      "latitude": 51.40278,
      "longitude": -3.41389,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Source project UKN019: Bro Tathan, St Athan, Vale of Glamorgan. Bro Tathan at St Athan, Vale of Glamorgan. Locality representative point only; no site coordinate inferred.",
      "coordinate_source": "https://www.geonames.org/2638854/",
      "location_label": "St Athan",
      "source_urls": [
        "https://stathancommunitycouncil.gov.uk/news/vantage-data-centre-bro-tathan-vale-of-glamorgan/",
        "https://dso.nationalgrid.co.uk/downloads/15083/data-centre-impact-study2.pdf"
      ],
      "source_dates": [
        "2026-03-20"
      ],
      "map_id": 98,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "24 MW offer (2025)",
        "unspecified": "120 MW campus plan; basis unresolved",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [
          {
            "category": "grid",
            "value": 24.0,
            "unit": "MW",
            "raw_boundary": "DNO_connection_offer_2025",
            "qualification": null,
            "scope": "unspecified",
            "stage": "offered",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "UKN019",
            "source_url": "https://dso.nationalgrid.co.uk/downloads/15083/data-centre-impact-study2.pdf",
            "source_date": "2026-03-20",
            "preferred_for_display": true,
            "additive": false
          }
        ],
        "unspecified": [
          {
            "category": "unspecified",
            "value": 120.0,
            "unit": "MW",
            "raw_boundary": "planning_capacity_unspecified",
            "qualification": null,
            "scope": "Vantage Bro Tathan",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "UKN019",
            "source_url": "https://stathancommunitycouncil.gov.uk/news/vantage-data-centre-bro-tathan-vale-of-glamorgan/",
            "source_date": "2026-03-20",
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "mva": []
      },
      "capacity_display": "Grid: 24 MW offer (2025); Reported (basis unknown): 120 MW campus plan; basis unresolved",
      "map_caption_lines": [
        "Grid: 24 MW offer (2025)",
        "Reported (basis unknown): 120 MW campus plan; basis",
        "  unresolved"
      ],
      "capacity_notes": [],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/UKN019",
      "citation_text": "ElecTrace (2026-10-14). Vantage Bro Tathan. UK Data Centre Planning Database, version 1.0.0, project record UKN019. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UKN019"
    },
    {
      "project_id": "UKN021",
      "name": "Vantage Newport CWL1",
      "nation": "Wales",
      "stage_detail": "operating_with_expansion",
      "stage_label": "Operating site with expansion plans",
      "latitude": 51.58774,
      "longitude": -2.99835,
      "coordinate_precision": "locality_proxy",
      "coordinate_note": "Exact settlement name in source location/project name: Celtic Way, Newport",
      "coordinate_source": "https://www.geonames.org/2641598/",
      "location_label": "Newport",
      "source_urls": [
        "https://blog.vantage-dc.com/fr-ca/2023/04/26/vantage-nominated-for-dcs-awards-voting-ends-may-5/",
        "https://aienergyintelligence.co.uk/uk-data-centre-tracker/ngd-newport-campus"
      ],
      "source_dates": [
        "2023-04-26"
      ],
      "map_id": 99,
      "capacity_columns": {
        "it": "",
        "facility": "",
        "grid": "",
        "unspecified": "148 MW whole campus incl. existing; expansion MW unknown",
        "mva": ""
      },
      "capacity_categories": {
        "it": [],
        "facility": [],
        "grid": [],
        "unspecified": [
          {
            "category": "unspecified",
            "value": 148.0,
            "unit": "MW",
            "raw_boundary": "available_power_boundary_unspecified",
            "qualification": null,
            "scope": "Vantage Newport CWL1",
            "stage": "source-stage unresolved",
            "claim_context": "Reported planning or campus figure; source stage may remain unresolved",
            "source_record_id": "UKN021",
            "source_url": "https://blog.vantage-dc.com/fr-ca/2023/04/26/vantage-nominated-for-dcs-awards-voting-ends-may-5/",
            "source_date": "2023-04-26",
            "preferred_for_display": false,
            "additive": false
          }
        ],
        "mva": []
      },
      "capacity_display": "Reported (basis unknown): 148 MW whole campus incl. existing; expansion MW unknown",
      "map_caption_lines": [
        "Reported (basis unknown): 148 MW whole campus incl.",
        "  existing; expansion MW unknown"
      ],
      "capacity_notes": [
        "Includes existing facilities or conditional expansion: disclosed campus capacity is not remaining new-build demand; no subtraction is inferred."
      ],
      "capacity_unknown_reason": null,
      "has_planning_or_campus_capacity_disclosure": true,
      "existing_or_completed_context": [],
      "url": "https://electrace.uk/compute/uk-data-centres/projects/UKN021",
      "citation_text": "ElecTrace (2026-10-14). Vantage Newport CWL1. UK Data Centre Planning Database, version 1.0.0, project record UKN021. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UKN021"
    }
  ]
}