PROJECT RECORD 99 · UKN021
Vantage Newport CWL1
Wales · Operating site with expansion plans
Reported capacity
Claims use different boundaries and may describe overlapping phases or the whole campus. Values below are not additive, and are not an estimate of remaining construction or incremental grid demand.
IT/compute
Not disclosed
Facility demand / power options
Not disclosed
Grid/supply
Not disclosed
Reported MW · basis unknown
148 MW whole campus incl. existing; expansion MW unknown
Retained source claims (may be historical or conflicting)
- 148 MWReported planning or campus figure; source stage may remain unresolvedavailable_power_boundary_unspecifiedVantage Newport CWL1source-stage unresolvedClaim source · 2023-04-26 ↗
Apparent power · MVA
Not disclosed
- Includes existing facilities or conditional expansion: disclosed campus capacity is not remaining new-build demand; no subtraction is inferred.
Location & development stage
- Stage interpretation
- Operating site with expansion plans
- Place / location reference
- Newport
- Position precision
- Approximate locality
- Map position
- 51.5877, -2.9983 (latitude, longitude)
Exact settlement name in source location/project name: Celtic Way, Newport
Map points are not surveyed parcel boundaries or electricity connection nodes. The stage is a source-based interpretation at the evidence cutoff, not a current-status check.
Project evidence
These links identify the original publishers. A source may concern a different permit, phase or capacity boundary; use it with the qualifications above.
Cite this record
ElecTrace (2026-10-14). Vantage Newport CWL1. UK Data Centre Planning Database, version 1.0.0, project record UKN021. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UKN021
Add your access date. Map number 99 is specific to this release; use the record identifier UKN021 and URL for citations.