PROJECT RECORD 65 · UKN023
GreenScale Derry Campus
Northern Ireland · Planned or early development
Reported capacity
Claims use different boundaries and may describe overlapping phases or the whole campus. Values below are not additive, and are not an estimate of remaining construction or incremental grid demand.
IT/compute
Not disclosed
Facility demand / power options
Not disclosed
Grid/supply
100 MW source-claimed secured connection
Retained source claims (may be historical or conflicting)
- 100 MWReported planning or campus figure; source stage may remain unresolvedsecured_grid_connectionsGreenScale Derry Campussource-stage unresolvedClaim source ↗
- 100 MWReported planning or campus figure; source stage may remain unresolvedsecured_grid_connections_campusGreenScale Derry Campussource-stage unresolvedClaim source ↗
Reported MW · basis unknown
Not disclosed
Apparent power · MVA
Not disclosed
- 170 MW Derry+Donegal cross-border total and unadopted 305 MW catalogue claim are excluded; Northern Ireland is outside the GB benchmark.
Location & development stage
- Stage interpretation
- Planned or early development
- Place / location reference
- Derry
- Position precision
- Approximate locality
- Map position
- 54.9981, -7.3093 (latitude, longitude)
Exact settlement name in source location/project name: Foyle Port, Derry/Londonderry
Map points are not surveyed parcel boundaries or electricity connection nodes. The stage is a source-based interpretation at the evidence cutoff, not a current-status check.
Project evidence
These links identify the original publishers. A source may concern a different permit, phase or capacity boundary; use it with the qualifications above.
Cite this record
ElecTrace (2026-10-14). GreenScale Derry Campus. UK Data Centre Planning Database, version 1.0.0, project record UKN023. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UKN023
Add your access date. Map number 65 is specific to this release; use the record identifier UKN023 and URL for citations.