PROJECT RECORD 54 · UK-R3-NORTH-001
Stellium Cobalt Park campus
England · Operating site with expansion plans
Reported capacity
Claims use different boundaries and may describe overlapping phases or the whole campus. Values below are not additive, and are not an estimate of remaining construction or incremental grid demand.
IT/compute
Not disclosed
Facility demand / power options
Not disclosed
Grid/supply
up to 500 MW conditional scalability vision
Retained source claims (may be historical or conflicting)
- 80 MWConflicting legacy MW observation retained for source transparency; technical apparent-power figures are reported separatelygrid_supply_available_campusStellium Cobalt Park campusLegacy headline or directory MW figure conflicts with the operator's technical MVA specification. Not confirmed electrical demand; do not convert or add to MVA figures.source-stage unresolvedClaim source ↗
- 500 MWReported planning or campus figure; source stage may remain unresolvedconditional_grid_scalabilitycampus AIGZ visionup to; accelerated access aspiration, no signed contract obtainedsource-stage unresolvedClaim source · 2026-01-20 ↗
Reported MW · basis unknown
No selected summary claim
Retained source claims (may be historical or conflicting)
- 80 MWConflicting legacy MW observation retained for source transparency; technical apparent-power figures are reported separatelydefinition_not_publishedCobalt Data Centre Campus (Stellium)Legacy headline or directory MW figure conflicts with the operator's technical MVA specification. Not confirmed electrical demand; do not convert or add to MVA figures.source-stage unresolvedClaim source ↗
- 180 MWConflicting legacy MW observation retained for source transparency; technical apparent-power figures are reported separatelyfuture_scalability_upper_capacityunspecifiedLegacy headline or directory MW figure conflicts with the operator's technical MVA specification. Not confirmed electrical demand; do not convert or add to MVA figures.source-stage unresolvedClaim source ↗
Apparent power · MVA
180 MVA terminal scalability (includes 80 MVA)
Retained source claims (may be historical or conflicting)
- 80 MVAReported planning or campus figure; source stage may remain unresolvedcampus_electrical_apparent_powerfour20MVAfeedscurrent campus specification; headline80MW conflictssource-stage unresolvedClaim source ↗
- 180 MVAReported planning or campus figure; source stage may remain unresolvedcampus_electrical_apparent_scalabilityterminal expansionnot80+180; headline180MW conflictssource-stage unresolvedClaim source ↗
- IT capacity qualification: existing dc1.
- Includes existing facilities or conditional expansion: disclosed campus capacity is not remaining new-build demand; no subtraction is inferred.
Existing / completed capacity — context only
These values describe existing or completed facilities. They are not additional planned capacity.
- 30 MWExisting or completed capacity; not additional planned demandfacility_electrical_dc1_existingDC1 building, within campusself assessment; not new campus incrementoperating_componentContext source · 2026-01-20 ↗
- 25 MWExisting or completed capacity; not additional planned demandit_loadDC1 buildingincluded within30source-stage unresolvedContext source · 2026-01-20 ↗
Location & development stage
- Stage interpretation
- Operating site with expansion plans
- Place / location reference
- North Tyneside
- Position precision
- Approximate locality
- Map position
- 55.0333, -1.5000 (latitude, longitude)
Source project UK-R3-NORTH-001: Stellium Cobalt Park campus. The retained related primary regional record UKN033 identifies Cobalt, North Tyneside in its location field, while UK-R3-NORTH-001 identifies Stellium Cobalt Park. Use North Tyneside administrative-area representative point only; no Newcastle/Shiremoor/North Shields town or campus position inferred. Locality representative point only; no site coordinate inferred.
Map points are not surveyed parcel boundaries or electricity connection nodes. The stage is a source-based interpretation at the evidence cutoff, not a current-status check.
Project evidence
These links identify the original publishers. A source may concern a different permit, phase or capacity boundary; use it with the qualifications above.
Cite this record
ElecTrace (2026-10-14). Stellium Cobalt Park campus. UK Data Centre Planning Database, version 1.0.0, project record UK-R3-NORTH-001. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UK-R3-NORTH-001
Add your access date. Map number 54 is specific to this release; use the record identifier UK-R3-NORTH-001 and URL for citations.