PROJECT RECORD 98 · UKN019
Vantage Bro Tathan
Wales · Planning permission reported
Reported capacity
Claims use different boundaries and may describe overlapping phases or the whole campus. Values below are not additive, and are not an estimate of remaining construction or incremental grid demand.
IT/compute
Not disclosed
Facility demand / power options
Not disclosed
Grid/supply
24 MW offer (2025)
Retained source claims (may be historical or conflicting)
- 24 MWReported planning or campus figure; source stage may remain unresolvedDNO_connection_offer_2025unspecifiedofferedClaim source · 2026-03-20 ↗
Reported MW · basis unknown
120 MW campus plan; basis unresolved
Retained source claims (may be historical or conflicting)
- 120 MWReported planning or campus figure; source stage may remain unresolvedplanning_capacity_unspecifiedVantage Bro Tathansource-stage unresolvedClaim source · 2026-03-20 ↗
Apparent power · MVA
Not disclosed
Location & development stage
- Stage interpretation
- Planning permission reported
- Place / location reference
- St Athan
- Position precision
- Approximate locality
- Map position
- 51.4028, -3.4139 (latitude, longitude)
Source project UKN019: Bro Tathan, St Athan, Vale of Glamorgan. Bro Tathan at St Athan, Vale of Glamorgan. Locality representative point only; no site coordinate inferred.
Map points are not surveyed parcel boundaries or electricity connection nodes. The stage is a source-based interpretation at the evidence cutoff, not a current-status check.
Project evidence
These links identify the original publishers. A source may concern a different permit, phase or capacity boundary; use it with the qualifications above.
Cite this record
ElecTrace (2026-10-14). Vantage Bro Tathan. UK Data Centre Planning Database, version 1.0.0, project record UKN019. Evidence cutoff 2026-09-22. https://electrace.uk/compute/uk-data-centres/projects/UKN019
Add your access date. Map number 98 is specific to this release; use the record identifier UKN019 and URL for citations.