ElecTrace · Khazna AUH6 Masdar City

31.8 MW IT Off-Grid AI Campus · 1080p Architectural Film

ACT 01 / 10 Buy ElecTrace Once: Design + Autonomous Off-Grid Dispatch Cuts Costs 47–55% 00:00 · Power Main Account · Design + Dispatch
1920×1080 · 30 fps · 3:22 · AAC Stereo Download 1080p MP4 (21.1 MB)

10-Act Architectural Storyboard

Click any act to seek directly in the 1080p film

Verified Model Summary (Khazna AUH6 · ERA5 Abu Dhabi)

Annualized CAPEX + fuel + O&M + solar PV
Annual Power Cost $9.07M / $7.73M/yr Save $8.14M–$9.48M/yr (-47.3% to -55.1%) vs $17.21M/yr TAQA TOU All-In; -16.7% vs $10.88M/yr uncoord 44.52 MW EPC.
Avoided Sunken Utility Iron $35.22M CAPEX Eliminates 132 kV GIS substation ($12.72M) + 50 MW N+1 backup diesel ($22.50M) while avoiding grid import charges.
Co-Sized Off-Grid Plant 25.09 MW OCGT -43.6% smaller vs 44.52 MW EPC (~$18M avoided turbine CAPEX), paired with 31.3 MWdc solar PV (7.0 existing + 24.3 new).
Per-GPU Workload Twin 20,480 GPUs · 0 Delays 2,560 nodes (H100, H200, MI210 + 8.86 MW shared IT), 2,205 leased; 995 IFM jobs completed with 26.90% flexible work shifted.
Separate DLC40 Bonus +$560k–$623k/yr Optional direct liquid cooling lowers mean PUE from 1.364 (IEC-24) to 1.320, saving 5,835 MWh/yr and 78.6k m³/yr water.