ElecTrace Compute · Abu Dhabi
Khazna AUH6 Masdar City (31.8 MW IT) · 3D Digital Twin
This interactive 3D digital twin models the Khazna AUH6 31.8 MW IT off-grid AI campus (20,480 GPUs across H100, H200 and MI210 clusters plus 8.86 MW shared IT), 31.3 MWdc solar PV (7.0 MWp existing + 24.3 MWdc expansion) and 25.09 MW aeroderivative OCGT dispatch. Enable JavaScript and WebGL to explore the live 3D yard and GPU hall, or watch the pre-rendered 1080p architectural film.
Watch 1080p Architectural Film →
← Back to ElecTrace Compute