ElecTrace Compute
Lanarkshire data centre twin
A modelled 3 MW GPU site in Lanarkshire, designed and coordinated off-grid: its energy bill is 33% lower than the same work on the grid without coordination, and 14% lower than on the grid with coordination.
Energy bills for a year of the same work: £2.12M on the grid without coordination, £1.63M on the grid with coordination, £1.89M off-grid without coordination and £1.41M off-grid and coordinated.
Transcript
The client cut (3:09), caption by caption. Every number in it is computed from the logged model runs.
The bill 0:00
33% off the energy bill: the same work, off-grid and coordinated, against the grid without coordination.
What it knew at midnight 0:08
Midnight UTC, 9 December 2024. The scheduler knows its battery (10.28 MWh), 167 nodes on, released work and a forecast.
What followed: four almost windless days, then the wind returned. Realised wind, daily means 0.15, 0.00, 0.00, 0.00, 0.09, 0.57, 1.51 MW.
The calm 0:26
Every hour of 2024, coloured by the nodes on. Hourly plans solved to optimality: 8,760 of 8,760.
Friday 07:00 UTC. Wind 0.02 MW, battery empty. The engine carries 0.65 of the site's 0.67 MW.
118 nodes on, the fewest of the week: 54 liquid-cooled, 64 air-cooled. Deferrable work on liquid-cooled nodes runs power-capped.
The same hour without coordination, on its own larger kit: all 333 leased nodes on, engine at 1.23 MW.
The sun, then the wind 1:10
Saturday 08:00 UTC. The sun comes first: output rises from 0.33 to 0.87 MW and nodes on from 130 to 183.
22:00 UTC. The wind is back at 1.22 MW: 209 nodes on, 952 GPUs on deferrable work.
The same work on less electricity 1:26
Across 2024, the same 11.7 million GPU-hours on 9,001 MWh instead of 11,593: 22% less electricity.
The design search and an unseen year 1:41
Sixty designs tried on 2025 weather; 43 meet every limit. Evaluation 48 is cheapest: £1.376M a year.
Designed on 2025 weather and run in 2024, a year it never saw: £1.406M a year, with no unserved energy.
The reverse, designed on 2024 weather, run in 2025: £1.409M a year. Their mean, the off-grid bill: £1.407M.
The grid, 2025 2:09
On the grid in 2025, the same work without coordination costs £2.12M a year.
Coordinated on the grid: £1.63M a year. Using less energy accounts for £462k of the £485k a year saved.
17:00 UTC, 8 January: the dearest hour of 2025 at £1,633/MWh. Coordinated: 0.87 MW. Without: 1.26 MW.
The bill again 2:41
The same work, a year: £2.12M on the grid, £1.63M coordinated on the grid, £1.41M off-grid and coordinated.
£709k a year less than the grid without coordination; £223k (14%) less than the grid with it.
Emissions: 118 tCO₂e a year off-grid, against 1,143 for the same coordinated work on the grid.
Sources
| Runs | |
|---|---|
| ent-coord-2024 | With coordination: the year 2024 on the design the search chose (wind 1.69 MW, solar 8.96 MWdc, battery 1.80 MW and 13.63 MWh, engine 1.02 MW). Logged rerun (state hash f4929373…). |
| ent-none-2024 | Without coordination: the same work in 2024 on its own design (wind 3.44 MW, solar 9.15 MWdc, battery 2.24 MW and 16.78 MWh, engine 1.40 MW). Logged rerun (state hash e5308421…). |
| grid-none-2025 | The same work on the grid in 2025, without coordination: £2.12M a year, agreed capacity 1,620 kVA. Logged rerun (state hash a67fb0a5…). |
| grid-coord-2025 | The same work on the grid in 2025, with coordination: £1.63M a year, agreed capacity 1,220 kVA. Logged rerun (state hash 326655db…). |
| grid-coord-flat-2025 | The same work on the grid in 2025, with coordination but a flat price, so the planner has no price view, and the import limit of grid-none-2025. At the dearest hour (17:00 UTC, 8 January) it drew 0.91 MW. Research run ent_coordflat_3.500. |
| y25_ifs_f100 | Design search on 2025 weather, run on forecasts as issued: 60 designs tried, 43 meet every limit; evaluation 48 is the cheapest, £1.376M a year. |
| y24_ifs_f100 | The same search on 2024 weather (60 designs tried). Its design run in 2025 and the 2025 design run in 2024 are the two unseen-year tests whose mean is the off-grid bill. |
| Register | |
| PM24 | The grid bill: GB hourly wholesale prices for 2025 with the 2025/26 SP Distribution HV charges (unit rates by time band, capacity and fixed charges), the TNUoS residual, BSUoS, the Capacity Market charge and policy levies; agreed capacity from the peak hourly import. |
| PM25 | The grid comparison: the off-grid bill against the PM24 bill of the same work at the same coordination level, scheduled for the grid. |
| PM26 | The logged reruns behind this film: a copy of the model code with read-only logging, equal to the original bit for bit with logging off; every full-year rerun, the four logged reruns above among them, reproduces its published run exactly. Which node runs which task follows a naming rule and a placement rule, both labelled in the film. |
| Data | |
| Forecasts | ECMWF IFS forecasts as issued, held by the scheduler in week 50 of 2024, up to 168 hours ahead. |
| Equipment drawn | Wind: Vestas V90-2.0 MW. Solar: LONGi Hi-MO X6 LR5-72HTH-580M modules, Sungrow SG350HX string inverters. Battery: Sungrow PowerTitan 2.0 ST5015kWh-1250kW-4h. Engines: INNIO Jenbacher J320 gas engine and INNIO Jenbacher J420 gas engine. Halls: 206 liquid-cooled NVIDIA HGX B300 nodes and 144 air-cooled NVIDIA RTX PRO 6000 nodes. |
| Data files | The film's data pack, exported from the logged reruns: bills.json, expert.json, fc50-2024.json, grid-2025.json, hero-N24.json, hero-T24.json, minutes50-N24.json, minutes50-T24.json, plan50-T24.json, runs.json, search.json, week50-N24.json, week50-T24.json, year-N24.json, year-T24-nodes.json, year-T24.json. |
| Music | Generated in the browser while the film plays, from the run's data on screen: wind output sets its brightness, the backup engine a low tone, the nodes on its pulse. Sound is off until you turn it on. |